Chov esk Bud jovice - Reconstruction Of The Sand Trap And Sedimentation Tank - Sewage Line. The Subject Of The Public Contract Is The Complete Reconstruction Of The Sand Trap And Settling Tank, Both Structurally And Technologically. The Contract Also Includes The Necessary Related Electrical Installation Work And As tp. The Construction Will Be Carried Out In The Area Of The esk Bud jovice Wwtp, In The Existing Buildings, Namely In The Sand Extraction Hall, On The Longitudinal Sand Trap, In The Collector Of Settling Tanks And The Settling Tank Of The Sewage Line. The Implementation Will Take Place When The Sewage Line Is Completely Shut Down. Due To The Absence Of A Dividing Cap On The Transverse Channel Behind The Sand Traps, A Temporary Barrier Must First Be Installed Between The Rain And Sewage Line So That The Sewage Line Can Be Reconstructed. Sand Trap The Modernization Of The Sand Trap Will Require The Complete Dismantling Of The Existing Machinery And The Installation Of New Equipment, Including All The Necessary Piping. In Terms Of Construction, It Involves Full-Scale Renovations And Modification Of The Headers For Fitting Rails For Traveling Bridges. Sand Mining Hall An Lv Substation For The Sewage And Rainwater Line Will Be Built Into The Sand Mining Hall. The Area Of The Substation Will Be Forcibly Ventilated, Outside The Existing Building Of The Hall. Blowers For Airing The Sand Trap And Sand Mining Will Be Installed In The Hall, A New, More Powerful Sand Washing Device And A Wheel Belt Conveyor For Transporting Sand To The Container Will Be Installed. The Container Remains As Is. It Will Include The Necessary Replacement Of The Electrical Installation And The Establishment Of A New Dt Switchboard, Which Will Enable Management And Monitoring Of The Operation Of The Wwtp. Sedimentation Tanks, Sludge Sump, Sump For Floating Impurities The Dimensions Of The Settling Tank, Sludge Sump And Floating Debris Sump Remain Unchanged. At The Sedimentation Tank, The Entire Surface Will Be Rehabilitated And The Head Will Be Repaired For The Installation Of Tracks For The New Drawbridges. Collector Un In The Biological Treatment Collector, New Concrete Blocks Will Be Set Up For New Piping And Machinery, And The Walls Will Be Cleaned, Including Painting. In The Above-Ground Part Of The Collector, A New Landing Will Be Made For The New Distribution Boxes, Including The Replacement Of The Electrical Installation And The Dt Switchboard For Monitoring And Controlling The Operation Of The Wwtp.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.