GTR 72797892
Tenders Are Invited For Renovation Of Rooms In The Building Of The Social Welfare Center At Ul. Wolności 1 In Pniewy
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
72797892
Tendering Authority
Subscribe to view
Tender No
D.262.TP.2.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of Rooms In The Building Of The Social Welfare Center At Ul. Wolności 1 In Pniewy
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
30-11-2023
Closed
Work Detail
The Subject Of The Order Is The Renovation Of Some Rooms Located On The Ground Floor Of The Building Of The Social Welfare Center In Pniewy At Ul. Wolności 1. The Scope Of Work Covered By This Procedure Is Specified In The Design Documentation, Technical Specification For The Execution And Acceptance Of Works, And The Bill Of Quantities. Note. The Scope Of Renovation Includes Façade Works, Window Replacement And Changes In Land Development. List Of Renovation Works: Wind Workdisassembly And Demolition Works.1. Dismantling The Internal Door With The Door Frame With The Symbol D4 (Door To Be Rebuilt), 2. Widening The Existing Opening - Carving Out Part Of The Wall, According To Drawing A-02. Note - A New Door Opening Is Planned To Be Carved In The External Wall Of The Vestibule, This Should Be Done In Accordance With Separate Documentation)3. Dismantling The Existing Ceramic Tile Floorconstruction And Finishing Works1. Before Forging The Hole, A New Steel Lintel Should Be Inserted, In Accordance With Drawings A-03, A-09. Note - The Final Lintel Bottom And The Number Of Lintel Beams Should Be Determined After Making The Openings.2. Filling The Gaps And Filling The Area Where The Door Was Dismantled And A New Lintel Was Installed, 3. Painting The Walls And Ceiling Of The Entire Room With Emulsion Paint, 4. Laying New Ash-Colored Stoneware Tiles On The Entire Floor Surface, With A 10 Cmkl Plinth. Stairway + Corridordisassembly And Demolition Works.1. Dismantling The Internal Door With The Door Frame With The Symbol D5 (Door To Be Rebuilt), 2. Widening The Existing Opening - Carving Out Part Of The Wall, According To Drawings A-02, A-093. Removal Of Existing Radiator4. Removal Of Existing Floor Tiles5. Disassembly Of The Fire Extinguisher Cabinet And Alarm Cabinet (To Be Moved)6. Lighting Switches To Be Movedconstruction And Finishing Works1. Before Forging The Hole, A New Steel Lintel Should Be Inserted, In Accordance With Drawings A-03, A-09. Note - The Final Lintel Bottom And The Number Of Lintel Beams Should Be Finally Determined After The Openings Have Been Made2. Filling The Gaps And Filling The Area Where The Door Was Dismantled And A New Lintel Was Installed3. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room4. Laying New Ash-Colored Stoneware Tiles On The Entire Floor Surface (Except For Wooden Stairs), With A Plinth 10 Cm5 High. Shifting The Existing Radiator, As Shown In Fig. A-06. Installation Of An Anti-Panic Gate, In Accordance With Fig. A-03 Or Construction Of Carpentry For The Descent To The Basement (According To The Investors Decision). Attention - When Making Carpentry Work On The Entrance, The Radiator Should Not Be Moved (Heating The Corridor And Staircase)7. Installation Of The Fire Extinguisher And Alarm Cabinet In The Place Indicated In Drawing A-038. Moving 2 Light Switches, In Accordance With Fig. A-039. Installation Of An Additional Ceiling Light Point, In Accordance With Fig. A-3, Connect It To The Light Switch For The Corridor. Resident Service Office Dismantling And Demolition Works.1. Dismantling The Existing Ceramic Tile Floor With Plinth2. Forging A New Door Opening In The Partition Wall To The Room. No. 0.4 With Dimensions 100X210cm3. Light Switch And Ceiling Lighting To Be Movedconstruction And Finishing Works1. Installation Of New Doors (With Symbol D2), Specifications According To Drawing A-042. Construction Of A New Partition Wall Between Rooms 0.3 And 0.2, With A Lightweight Structure Made Of Plasterboards On A Steel Grid, Filled With Mineral Wool.3. Preparation Of The Door Opening In The Above-Mentioned Partition Wall For The Installation Of Doors, Doors With The Symbol D5 (Dismantled)4. Filling In Gaps And Filling In The Place Where The New Door Opening Was Made And Where The New Partition Entrance Was Made5. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room6. Laying A Pvc Floor Covering With A 10 Cm High Plinth On A Previously Leveled Floor Surface7. Moving The Light Switch 1 Pc. And Ceiling Lighting 1 Pc., According To Drawing A-038. Carry Out Telecommunication Installation. Osl Office Disassembly And Demolition Works.1. Disassembly Of The Existing Door With A Frame With The Symbol D7 (To Be Rebuilt) Between Rooms No. 0.4 And 0.5 Construction And Finishing Works 1. Brick-Up Of Part Of The Existing Door Opening Between Rooms No. 0.4 And 0.5 (Aerated Concrete Blocks, Size 600, Plastered On Both Sides)2. In The Left Hole, A New Door With The Symbol D2 Should Be Installed, Specifications According To Fig. A-43. Filling Gaps And Filling In The Door Opening4. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room5. The Pvc Floor Covering Remains Unchanged (Must Be Secured During Work)6. Carry Out Telecommunications Installation. Senior Club Office. Disassembly And Demolition Works.1. Separating Rooms Using A Mobile Wall - Installation Of A Steel Substructure With The Existing Ceiling, In Accordance With The Drawing. A-03, A-092. Steel Substructure Casing Using Gk3 Boards. Filling Gaps And Filling In The Place Of Mounting The Mobile Wall4. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room5. The Pvc Floor Covering Remains Unchanged (Must Be Secured During Work)6. Carry Out Telecommunication Installation Klub Seniorar Disassembly And Demolition Works.1. Filling The Gaps And Filling The Area Where The Door Opening Was Enlarged2. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room3. The Pvc Floor Covering Remains Unchanged (Should Be Secured During Work).Holdisassembly And Demolition Works.1. Dismantling The Internal Door With The Door Frame With The Symbol D6 (Door To Be Rebuilt), 2. Widening The Existing Opening - Carving Out Part Of The Wall, In Accordance With Drawing A-02Construction And Finishing Works1. Before Forging The Hole, A New Steel Lintel Should Be Inserted, In Accordance With Drawings A-03, A-09. Note - The Final Lintel Bottom And The Number Of Lintel Beams Should Be Finally Determined After The Openings Have Been Made2. Installation Of New Doors (With Symbol D7), Specifications According To Fig. A-04 Note - Confirm The Size Of The Opening By Checking The Dimensions Of The Existing D73 Doors. Filling The Gaps And Filling The Area Where The Door Was Dismantled And A New Lintel Was Installed4. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room Corridordisassembly And Demolition Works.1. Disassembly Of The Fire Extinguisher And Fire Blanket (To Be Moved)Construction And Finishing Works1. Construction Of A New Partition Wall In A Lightweight Structure Made Of Plasterboards Between Rooms No. 0.7A And 0.7B, With A Door Opening With The Symbol D6 (Dismantled)2. Installation Of Doors With The Symbol D6 Note - Confirm The Opening Size After Checking The Dimensions Of The Existing D63 Doors. Filling The Gaps And Filling The Area Where The Door Was Dismantled And A New Lintel Was Installed4. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room5. Installation Of A Lighting Switch, 1 Piece, In Accordance With Fig. A-03, For A Newly Separated Room Kitchendisassembly And Demolition Works.1. Disassembly Of The Feeding Windowconstruction And Finishing Works1. Blocking Up The Window Opening2. Painting The Wall In Which The Opening Was Bricked Up With Emulsion Paint. Office Kipus, Ous Disassembly And Demolition Works.1. Disassembly Of Existing Sanitary Equipment - Washbasins, Toilets, Hot Water Heater, Sewage Grate2. Disassembly Of All Partition Walls (Brick Walls 6 Cm Thick, Height 2.0 M)3. Disassembly Of Doors From Partition Walls - 2 Pcs. 4. Cutting Off The Ventilation Hole (Connecting It To Room No. 0.8B)5. Removal Of Tiles From The Floor And Walls6. Disassembly Of The Door Opening Between The Rooms. No. 0.9 And 0.2 Construction And Finishing Works1. Installation Of Doors With The Symbol D4 (Doors Dismantled - Before Installation, Check Their Dimensions And Confirm The Size Of The Existing Door Opening). If Necessary, Adjust The Size Of The Existing Opening To The Size Of The Door (Ex. Lintel Size).2. Filling The Gaps And Filling The Place Where The New Door Opening Was Made3. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room4. Laying A New Pvc Floor Covering With A 10 Cm High Plinth, After Leveling The Subfloor5. Rebuild The Ceiling Lighting - Distribute 2 Ceiling Lamps Evenly6. Add Plug Sockets – 4 Pcs. After Agreeing On The Location With The Investor7. Connect The Room To The Alarm8. Carry Out Telecommunication Installationcommunicationdisassembly And Demolition Works.1. Dismantling Of Existing Partition Walls With A Thickness Of 6 And 12Cm2. Disassembly Of Existing Interior Doors – 3 Pcs.3. Dismantling Of Existing Sanitary Equipment - Washbasins, Toilet, Urinal4. Disassembly From The Radiator – 1 Pc. To Be Postponed5. Removal Of Ceramic Tiles From The Floor And Walls6. Disassembly And Reconstruction Of The Electrical Installation7. Dismantling And Reconstruction Of Sanitary Installationsconstruction And Finishing Works1. Construction Of A New Brick Partition Wall, Plastered On Both Sides, In Accordance With Drawing A-032. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room3. Construction Of A New Floor With Anti-Slip Ceramic Tiles, With A Plinth 10 Cm4 High. Relocation Of Ceiling Lighting Womens Wcdisassembly And Demolition Works.1. Dismantling Of Existing Partition Walls With A Thickness Of 6 And 12Cm2. Disassembly Of Existing Interior Doors – 3 Pcs.3. Dismantling Of Existing Sanitary Equipment - Washbasins, Toilet, Urinal4. Disassembly From The Radiator – 1 Pc. To Be Postponed5. Removal Of Ceramic Tiles From The Floor And Walls6. Disassembly And Reconstruction Of The Electrical Installation7. Dismantling And Reconstruction Of Sanitary Installationsconstruction And Finishing Works1. Construction Of New Brick Partition Walls, Plastered On Both Sides, In Accordance With Drawing A-032. Installation Of New Doors With The Symbol D3-3Pcs., In Accordance With Drawing A-043. Installation Of New Sanitary Equipment (Sink And Toilets) Note - Washbasins (2 Pieces) Should Be Installed With Point Water Heaters4. Construction Of New Water And Sanitary Sewage Connections (Reconstruction Of Existing Ones)5. Painting ....The Entire Description Of The Subject Of The Order Is Included In The Technical Documentation Constituting Annex No. 1 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
cec94a04-3f82-4c44-88d1-d02cae430c76.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.