GTR 72758719

Tenders Are Invited For Thermal Modernization Of Single-Family Buildings As Part Of The Stop Smog Program - Stage Viii

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
72758719
Tendering Authority
Subscribe to view
Tender No
ZP – 271- 19/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Thermal Modernization Of Single-Family Buildings As Part Of The Stop Smog Program - Stage Viii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
01-12-2023 Closed
Work Detail
Part No. 1 Audit No. 68 - Jodłówka Tuchowska 220 Thermal Modernization Of The Building - The Scope Of Thermal Modernization Works Will Be As Follows: 1. Insulation Of External Walls On The 2Nd And 3Rd Floors With An Area Of ​​Approximately 144.58 M2 (Excluding Gable Walls) Should Be Performed Using The Light-Wet Technology Using The Bso System (Seamless Insulation System). The Ordering Party Requires The Use Of Thick Eps Graphite Polystyrene Boards For The Facade. 12 Cm (Λ = 0.031 [W/Mk]), Mounted On Styrofoam Glue, Pinned To The Substrate With Plastic Connectors 4-6 Pcs/M2, Window Jambs Also Insulated With Graphite Styrofoam 3 Cm Thick, Reinforcing Layer Made Of Fiberglass Mesh ( 145 G/M2) Embedded In Adhesive Mortar, Silicone Facade Plaster Primer (Primer), Thin-Layer Facade Plaster, Also Silicone, Lamb Facade Plaster Texture, Grain Thickness 1.5-2 Mm, Mass-Colored Plaster, Colored (Price Group 1) . You Should Use 12 Cm Wide Starter Strips, Window, Corner And Eaves System Strips. It Is Necessary To Use A Uniform System Set. The Total Length Of External Window Sills Required For Installation (Window Sills Made Of Coated Steel Sheet) Is Approximately 19.20 M. The Scope Of Thermal Modernization Of External Walls Also Includes Strengthening The Cracks In The Facade Plaster In 4 Places With Steel Anchors, As Well As Dismantling The Existing Steel Roof Over The Entrance To The Ground Floor Rooms, Dismantling Downspouts And Re-Installing Them, Approximately 20.50 Meters Long, Dismantling And Re-Installation Of One Lighting Lamp Along With The Extension Of Electrical Cables, Disassembly And Installation Of A New Power Switch, Installation Of A New Air Supply Grille In The Boiler Room On The Façade, Installation Of A New Roof Over The Entrance To The Ground Floor Rooms With An Aluminum Structure, Covered With Tinted Polycarbonate, 2.00 M Long, Disassembly Wall Scaffolding, Installation Of Sheet Metal Flashings Above The Vestibule And Sheet Metal Flashings On The Gable Walls Securing The Insulation Of The Walls, Appropriately Profiled And Recessed Into The Existing Wall, Approximately 25 Cm Wide, Reconstruction Of Balcony Balustrades In 4 Places, Additional Processing Of Uninsulated Walls In The Unused Attic, Also Removal Of Residues After Thermal Modernization Works And Tidying Up The Area, Restoring It To Its Original Condition. 2. Modernization Of The Boiler Room - Includes Adapting The Boiler Room To Legal And Technical Requirements (Minimum Room Volume, Air Supply, Ventilation, Fire Protection Conditions, Etc.). The Ordering Party Requires The Delivery Of An Energy Label In Accordance With The Erp Directive. For The Set: Boiler, Domestic Hot Water Tank, Along With The Necessary Automation To Optimize The Operation Of These Devices And To Train The User In The Operation Of The Boiler And The Heating System. The Scope Of Modernization Also Includes Sealing The Chimney Duct With An Acid-Resistant Steel Pipe, Only If Necessary In A Protocol. The Ordering Party Does Not Have An Inventory Of The Existing Chimney To Which The Existing Heating Boiler Is Connected, Therefore, If During The Renovation Of The Boiler Room, After Dismantling The Old Boiler, As A Result Of An Inspection Carried Out By A Chimney Sweeper Or Construction Manager, It Is Found That The Existing Chimney Flue Does Not Have The Appropriate Cross-Section For The Boiler Used Required By The Manufacturer And Applicable Regulations, The Contractor Should Drill The Chimney Flue To The Appropriate Diameter Recommended By The Boiler Manufacturer. Also, If It Is Found (In The Form Of A Report Signed By A Chimney Sweeper Or Construction Manager And Approved By The Supervisory Inspector) That The Existing Chimney Flue Is Burnt Or Leaking, It Is Essential To Seal The Chimney Flue With An Acid-Resistant Steel Pipe. The Height Of The Existing Room In Which The New Gasification Boiler Is To Be Installed Is 2.20 M. Due To The Lack Of Air Supply In The Boiler Room, Air Supply To The Boiler Room Should Be Made With A Cross-Section Of At Least 250 Cm2. The Contractors Responsibilities Will Also Include Performing All Tightness Tests Of The Existing Or Modernized Internal Installations, And, If Necessary, Also Implementing The Necessary Electrical Installation With A Socket Supplying The Gasifying Boiler To Be Installed, Preparing Appropriate Acceptance Reports For The Installed Devices, And A Chimney Sweep Report Allowing The Boiler Room To Be Installed. And Chimney Flues For Use. Moreover, In The Scope Of Modernization Of The Boiler Room, The Contractor Will Be Responsible For Dismantling The Existing Internal Entrance Doors From The Utility Room To The Boiler Room, And Reinstalling (Right) New, Non-Standard Technical Doors With Dimensions 0.85X1.90 M Covered With Galvanized Sheet Metal On Both Sides, As Well As Installation Of A New Door Leaf Of The Technical Door (Right) To The Staircase, Also Covered With Galvanized Sheet Metal On Both Sides. 3. Installation Of A Wood Gasification Boiler - The Scope Of Work Includes The Dismantling Of An Old Boiler (Unnamed Boiler) With A Capacity Of Approximately 15 Kw For Altech Solid Fuel, And The Installation Of A New Steel Or Cast Iron Wood Gasification Boiler With Min. Power Of 20 Kw And Energy Class A+, Operating At A Temperature Of 80-90 Degrees, Equipped With A Weather-Controlled Central Heating Circuit. The Boiler Should Have An Exhaust Fan (Depending On The Model) And Automation That Controls The Combustion Process. A Solid Wood Gasification Boiler With A Humidity Of Up To 20% Should Be Used, Along With Protection Devices And A Control Panel Equipped With Circulation Pumps For The Boiler And Central Heating Installation. And Loading The Domestic Hot Water Capacity Heater, The Expansion Vessel Of The Open System, And The Accumulation Tank, Possibly Equipped With A Flow Coil For Heating Domestic Hot Water. Temperature Valve And 3-Way Mixing Valve. The Boiler Should Be Made In Class 5 Of Energy Efficiency And Emission According To The Pn-En 303-5 Standard, And In Accordance With The Eu Regulation Regarding The Ecodesign Certificate. Additionally, The Boiler Must Meet The Requirements Of Energy Efficiency Class A+ With The Ecodesign Certificate. The Thermal Technology Of The Boiler Room Should Consist Of The Following Circuits: - Boiler Circuit With A Mixing Pump And Temperature Valve, - Accumulation Tank (Buffer) With A Capacity Of 1,000 Dm3 (The Buffer Capacity Should Be Simultaneously Adapted To The Requirements Of A Specific Boiler To Ensure Operational Compatibility), Acting As A Hydraulic Coupling And Allowing Effective Operation Of The Boiler, - Heating Circuit With A Three-Way Mixing Valve (Weather-Controlled) For The Building, - Circuit Loading The Domestic Hot Water Tank. The Boiler Circuit Should Include The Following Devices: - Water Boiler - Mixing Pump - Return Protection Temperature Valve Min. 55 Degrees C. - Security Expansion Vessel With A Capacity Of Min. 50 L. The Mixer Circuit Should Include The Following Devices: - Mixer Circuit Pump, - Three-Way Valve With An Actuator, - Weather-Controlled Three-Way Valve Regulator, - Sludge Filter. The Boiler Operating Parameters Should Enable Achieving An Operating Temperature At The Boiler Outlet Of Not Less Than 80Oc And Not Exceeding 90O C, With An Operating Pressure Not Higher Than 2 Bar, And Adjust The Settings To The Thermal Powers Indicated Above (The Maximum Boiler Power Indicated By The Manufacturer May Be Higher When Adjusting The Settings To The Parameters Resulting From The Attached Energy Audit). 4. Modernization Of The Domestic Hot Water Installation – Necessary Hot Water Installation (Only Within The Boiler) Should Be Made Using Alupex/Pp Technology, Clamping Steel, Covered With Thermal Insulation Compliant With Pn Standard, Without The Need For Any Grooves In Walls And Ceilings. Connect The Wood Gasification Boiler To The Existing Domestic Hot Water Installation In The Boiler Room Without Making Additional Drilling Holes Through The Ceilings And Internal Walls (Additional Drilling Holes Through The Ceilings And Walls Should Only Be Made If There Is A Justified Need To Do So In Consultation With The Supervision Inspector). The Scope Of Modernization Works Also Includes The Removal Of Unnecessary Elements Of The Old Installation (Without Chiseling Out, Only By Plugging Them With The Wall Face And Filling The Gaps With Plaster) In Places Where The Installation Was Liquidated, Without Painting The Walls. 5. Installation Of The Hot Water Tank - A Hot Water Tank Should Be Installed. With A Capacity Of Min. 100 Dm3 With An Energy Class Not Worse Than B. The Boiler Should Be Connected To A New Domestic Hot Water Tank. And To The Existing Domestic Hot Water Installation, After Which The Installation Should Be Filled With Water, Or Alternatively, Installation Of A Domestic Hot Water Coil. In The Central Heating Buffer.6. Modernization Of Central Heating Installations - The Central Heating Installation Should Also Be Adapted. To An Existing Central Heating Installation To The Extent Necessary For The Proper Functioning Of The Entire Installation And Rinse It. The Necessary Modernization Should Be Made Using Alupex, Cu, Clamping Steel Technology Without The Need To Drill Holes In Walls And Ceilings, Using Safety Devices Required By Law.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
8dcd5635-d313-463d-b534-cdfde1aafa13.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders