GTR 72758718
Tenders Are Invited For Modernization Of The Building Of The Municipal Cultural Center In Zawiercie.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
72758718
Tendering Authority
Subscribe to view
Tender No
WIZP.271.87.2023.ED
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Building Of The Municipal Cultural Center In Zawiercie.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
01-12-2023
Closed
Work Detail
The Subject Of The Order Is: Modernization Of The Building Of The Municipal Cultural Center In Zawiercie.1. Existing Condition: The Building Of The Municipal Cultural Center In Zawiercie Was Built In The Mid-1970S. A Building With A Centrally Located Auditorium, Surrounded By Auxiliary Rooms, Offices And Art Studios (…)2. The Scope Of Construction Works Includes:2.1. Construction Industry:1) Demolition And Dismantling:2) Preparation Of The Roof Substrate And Roof Covering Technology:3) Roof Of The Facility And External Elements - Roofs:4) Installation Of Epdm Membrane:5) Balustrades:6) Layers Of Terraces And Balconies:7) Facade From Fiber-Cement Boards: Make A Ventilated Façade From Fiber-Cement Boards. The Façade Was Designed With 8 Mm Thick Boards With Maximum Board Dimensions Of 250 X 122 Cm In Dark Gray, Light Gray And, In Part Of The Façade, Light Gray Boards With A Linear Structure. Cutting, Storing And Transporting Boards Should Be Carried Out In Accordance With The Manufacturers Guidelines. The System Substructure Should Be Made Of Aluminum T Profiles Anchored To The Façade Through A Layer Of Styrofoam Using Anchors With The Necessary Construction Certificates. Aluminum Profiles Should Be Painted With Black Aluminum Paints. 8) Main Elevations Plastered With Thin-Layer Plaster: Part Of The Main Elevations Will Be Finished With Plaster, Location According To Design Drawings. Clean The Existing Plaster And Make Plaster Repairs Where Necessary. Apply A Base Layer Of Adhesive On The Mesh. Apply A Layer Of Plaster With A Grain Size Of 3 Mm And A Lamb-Like Float. 9) Courtyard Elevations: The Two Courtyard Elevations That Are Plastered Should Be Finished With Thin-Layer Plaster. Clean The Existing Plaster And Make Plaster Repairs Where Necessary. Make An Adhesive Base Layer On Fiberglass Mesh For Outdoor Use. Apply A Layer Of Plaster With A Grain Size Of 3 Mm And A Lamb-Like Float. Use Silicone Or Silicate Plaster. Acrylic Plaster Is Not Allowed. The Two Remaining Facades Of The Courtyard, After Dismantling The Corrugated Sheet Metal And Insulation, Should Be Cleaned And Leveled If Necessary. The Façade Should Be Insulated With 18 Cm Thick Mineral Wool Boards Mechanically Mounted To The Ground. Fix The Boards With Glue On A Fiberglass Mesh For External Use. Apply A Layer Of Plaster With A Grain Size Of 3 Mm And A Lamb-Like Float. Use Silicone Or Silicate Plaster. 10) Suspended Ceilings In External Canopies: Make Suspended Ceilings From Expanded Aluminum Mesh Cassettes With A Mesh Size Of 8X6 Mm. For Installation, Use C 60X35 Mm System Support Profiles And 50X50 Mm Angle Edge Profiles. Aluminum Window And Door Joinery: Install Aluminum Window And Door Joinery In Accordance With The Schedule Drawings.11) External Staircase Cladding: On The External Stairs To The Civil Registry Office, Install Treads And Risers Made Of 3 Cm Thick Granite Slabs With Frost-Resistant Mortars. 2.2 Electrical Industry: 1) Photovoltaic Installation: The Building Will Be Equipped With A Photovoltaic Installation With A Total Power Of 49.28 Kwp. The Photovoltaic Installation Will Consist Of: A) 385W Photovoltaic Modules, B) Photovoltaic Inverter, C) Cabling: Wiring And Connectors On The Direct Current (Dc) Side, Cabling On The Alternating Current (Ac) Side, D) Electrical Switchboards: Rpv Switchgear ,E) Dc Surge Protectors In The Housing,F) Construction: Mounting Structure For Frame Photovoltaic Modules:G) Electrical Installations,H) Protection System Against Energy Leakage Into The Grid,I) Fire Protection,J) Surge Protection.2) Lightning Protection Installation ;To Ensure Lightning Protection Of The Facility, A Grid Of Horizontal And Vertical Lightning Protection System Cables Was Designed On The Roof Of The Facility. The Lightning Protection System Cables Will Be Made Of Galvanized Steel Rod With A Diameter Of 8 Mm. In Order To Protect The Devices On The Roof Of The Building, Lightning Protection Masts With Concrete Bases And A Height Adapted To The Protected Devices Will Be Used. The Designed Spacing Of The Masts Ensures Protection Of The Surface Of The Photovoltaic Installation.3) External Installations: External Lighting Installation: An External Lighting Installation In The Form Of Led Strips Mounted In The Roof Has Been Designed. Outdoor Lighting Fixtures Will Be Controlled By An Astronomical Clock.2. The Detailed Scope Of Works Is Specified In The Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, And Bills Of Quantities (As An Auxiliary Element For Price Calculation), Which Constitute Annexes To The Specifications Of The Terms Of The Contract (Hereinafter Referred To As Swz).3. The Prepared Offer Must Be Consistent With The Subject Of The Order, Design Documentation And Technical Specifications For The Execution And Acceptance Of Works.4. Where A Trademark (Brand), Manufacturer, Supplier, Patent, Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor Is Indicated In The Swz, Including Design Documentation, Technical Specification For The Execution And Acceptance Of Works Or Other Procurement Documents Or Standards, European Technical Assessments, Common Technical Specifications Or Other References Referred To In Art. 101 Section 1 Point 2 Or Section 3 Of The Act, Public Procurement Law, The Ordering Party In Accordance With Art. 99 Section 5 Of The Public Procurement Law Allows The Submission Of An Equivalent Offer Or In Accordance With Art. 101 Section 4 Of The Public Procurement Law, Offering Solutions Equivalent To Those Indicated In The Documentation, Provided That They Ensure Technical Parameters Not Worse Than Those Assumed In The Documentation (...)5. The Contractors Settlement For The Execution Of The Subject Of The Order Will Be In Accordance With The Draft Provisions Of The Contract.6. The Contractor Is Obliged To Provide A Warranty On The Subject Of The Order For No Less Than 3 Years From The Date Of Final Acceptance.7. The Warranty Period For The Subject Of The Order Is 5 Years.8. The Contractor Will Take Into Account The Specificity Of Work In Public Utility Facilities, Perform The Work In A Manner And At A Time That Does Not Disturb The Operation Of The Municipal Cultural Center And The Adjacent Restaurant, In A Way That Ensures The Safe Use Of The Building By Employees And Customers. Any Work That Disrupts The Operation Of The Municipal Cultural Center And The Adjacent Restaurant Will Be Performed By The Contractor On Time. And On The Terms Agreed With The Person Supervising The Implementation Of The Contract On Behalf Of The Ordering Party.9. Obligation To Employ Under An Employment Contract: In Order To Fulfill The Obligations Specified In Art. 95 Of The Public Procurement Act, The Ordering Party Requires That, As Part Of The Implementation Of The Contract, Activities Directly Related To The Subject Of The Contract Falling Within The So-Called Direct Costs Resulting From The Bill Of Quantities Attached To The Swz (I.E. Construction Works, Electrical Works) Were Performed By Persons Employed Under An Employment Contract In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Consolidated Text, Journal Of Laws Of 2023, Item 1465), Regardless Of Whether The Work Will Be Performed By The Contractor, Subcontractor Or Further Subcontractor (So-Called Manual Workers). This Requirement Does Not Apply To Persons: Construction Managers, Persons Performing Transport Services, Suppliers Of Construction Materials, Equipment, Devices, Natural Persons Running A Business, Incumbent Members Of The Contractors Management Or Supervisory Bodies, Partners Of A General Partnership Or Partnership To The Extent That They Will Personally Perform Works On The Benefit Of The Ordering Party Or The Contractor.10. The Ordering Party Obtained A Preliminary Commitment From Bank Gospodarstwa Krajowego No. Edycj8/2023/6832/Polskilad Regarding Investment Co-Financing From The Polish Order Government Fund: Strategic Investment Program For The Task Entitled: Modernization Of The Building Of The Municipal Cultural Center In Zawiercie.11. The Description Of The Subject Of The Contract Does Not Require Taking Into Account Accessibility For Disabled People, And No Regulations Are Introduced In The Scope Of Art. 100 Paragraph 1 Of The Public Procurement Law. Due To The Restrictions. Number Of Characters, Details In Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e8e8a501-5295-47ec-ae71-6655619d2aac.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.