GTR 72641268

Tenders Are Invited For Maintaining Operational Efficiency Of Machines, Electrical Devices And Automation At Facilities Administered By Zgkim Rudna.

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
72641268
Tendering Authority
Subscribe to view
Tender No
WWK.271.11.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Maintaining Operational Efficiency Of Machines, Electrical Devices And Automation At Facilities Administered By Zgkim Rudna.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
22-11-2023 Closed
Work Detail
1. Description Of The Subject Of The Order: 1.1. Maintaining The Operational Efficiency Of Machines, Electrical Equipment And Automation At Facilities Administered By Zgkim Rudna, I.E.: - Sewage Treatment Plants - 7 Facilities, - Sewage Pumping Stations - 99 Facilities, - Hydrophore Plants (Aksuw, Aps) - 11 Facilities, - Deep Wells - 15 Facilities .1.2. Execution Of The Subject Of The Order Referred To In Point 2.1. Includes:2. Conducting Regular Inspections And Maintenance Of Machines, Electrical Devices And Automation, As Well As Maintaining 24/7 Technical Efficiency And Availability Of These Devices.3. Providing Spare Parts And Materials Necessary For Continuous Maintenance Of Machines And Electrical Devices In Technological Operation.4. Providing Your Own Transport, Necessary Equipment And Tools.5. Ensure At Least Two People To Serve.6. Ensuring 24-Hour Availability To Provide Services That Are The Subject Of The Order.7. Commencing The Removal Of Defects Within The Time Specified In The Offer Form, But No Longer Than 2 Hours From The Time Of Reporting, And (Regardless Of The Season) Removing Them No Later Than Within 6 Hours.8. Ordering All Repairs Resulting From Warranty Contracts To Companies Providing Warranty.9. Keeping Operational Records In The Operation Book, Preparing Reports On The Installation And Commissioning Of Devices And Reports On Tests Of The Electrical And Lightning Protection Installations In Terms Of The Efficiency Of Connections, Accessories, Safeguards And Means Of Protection Against Electric Shocks, Insulation Resistance Of Wires And Grounding Of Installations And Devices (Article 62, Section 1 Point 2 Of The Construction Law).10. Performing Service And Repairs With The Utmost Care In Accordance With Occupational Health And Safety And Fire Protection Regulations. And Sanitary.11. Maintaining Order And Order In Rooms Containing Machines And Electrical Devices, In Accordance With Occupational Health And Safety And Fire Protection Regulations. And Sanitary.2.3. Scope Of Work:2.3.1. The Detailed Scope Of Work Includes:1. Maintaining Full Mechanical, Electrical And Automatic Efficiency Of The Technological Process Of The Sewage Treatment Plant, In Particular The Oxygenation Process (Mechanical And Electrical Efficiency Of The Blowers Is Essential). In Addition, Other Devices Such As Gate Valves (Closed/Open Markings), Grates And Pumps Are Involved In The Sewage Treatment Schedule, Therefore Care Will Be Required To Ensure Correct Settings And Security Values, As Well As To Maintain Optical And Acoustic Signaling.2. Maintaining Full Mechanical, Electrical And Automatic Efficiency Of The Process Of Pumping Sewage To The Sewage Treatment Plant. In Particular, Maintaining The Full Efficiency Of The Installed Sewage Pumps By Measuring Pump Currents, Setting Motor Switches In Accordance With The Rated Current Of A Given Pump, Maintaining Appropriate Levels Of Sewage Pumping Using Mac3 Float Probes (Pears), Efficient Optical And Acoustic Signaling. Note: In Sewage Pumping Stations Before Starting Any Work, Ventilate The Well In Accordance With Occupational Health And Safety Guidelines. Requirement - The Work Must Be Performed By At Least 2 People.3. Keeping The Water Extraction Process In Constant Motion. In Particular, Attention To The Correct Short-Circuit And Overload Settings According To The Rated Values ​​Of The Pumps, The Efficiency Of Conductivity Probes [Dry Running, Correct Levels According To The Operation And Maintenance Manual].4. In Hydrophore Plants, Special Attention Will Be Required To Sck Conductivity Probes, Sw Pendant Probes [Levels, Rust, Scale] And The Efficiency Of Dry-Running Sensors For Network And Deep-Well Pumps. Care Will Be Required To Ensure Correct Short-Circuit And Overload Settings For Individual Pumps As Well As Efficient Optical And Acoustic Signaling.2.4. Important Additional Information: 1) For Spare Parts And Materials Necessary For The Continuous Maintenance Of Machines And Electrical Devices In Technological Operation, The Ordering Party Will Reimburse The Contractor For Purchase Costs Documented By Appropriate Purchase Invoices Without Any Additional Charges Or Costs, In An Amount Not Higher Than The Catalog Prices Applicable At A Given Seller And After Their Agreement With The Ordering Party Before Making The Purchase. Reimbursement Of The Costs Of Purchasing Parts And Materials Will Be Made After Submitting The Invoice Within The Deadline Set In The Contract.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1f03ab4d-80dc-4de0-ba57-46c908b96dda.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders