Spa Construction Work - Tam s Spa Plan., Execution, Operation_Ii. Execution: Main Quantities - Restoration Of A Spa Building After A Fire - Temporary Constructions - Demolition Works - Beach Buildings - Beach Landscaping, Outdoor Elements - Reconstruction Of Medicine In The Spa Building - Pool Construction - Water Engineering - Slide Technology - Utility Network Within The Plot - Construction Of External Road, Parking Lot - Street Lighting - Gardening - Accessibility - Access Control System - Renovation And Modernization Of The Spa Building - Well Drilling Hot And Cold Water - Heat Utilization Basic Areas Related To The Planning Task: Beach Entrance Building 466.69 M2 Restaurant 359.17 M2 Outdoor Area (Consumer Terrace) 210.12 M2 Restaurant Total 569.29 M2 Sauna Building 48.11 M2 Buffet 1 - 61.43 M2 Buffet 2 - 63.53 M2 Washroom Block 40.26 M2 Washroom Block Am 45.09 M2 Water Engineering 286.28 M2 33M Pool 674.62 M2 Adventure Pool (3 Pcs) 363.58 M2 Grandstand 105.39 M2 Grandstand Storage 87.84 M2 Water Slides (3 Units) 281.70 M2 Stage 237.26 M2 Thermal Pools (2 Units) 454.58 M2 Existing Bath Building Floor Area Of Its Premises: - Basement: 1509.34 M2 - Ground Floor: 2166.62 M2 - 1St Floor: 700.73 M2, Roof Terrace: 566.18 M2 - Ii. Floor: 76.15 M2 Planning Task: Approval Preparation Of Licensed And Construction Plans Based On Plans, Obtaining Permits (In Detail In The Technical Documents). Part Of The Planning Is The Creation Of Visual Plans, Which Must Be Prepared For Both The Mandatory And Non-Mandatory Parts. Expectation, That The Designer Takes Into Account The Economically Operable And Sustainable During The Planning Use Of Applications And Materials. Energy-Saving, Environmentally Friendly And Sustainable Creating An Operable Building. The Aim Is To Meet The Times, Based On Modern Technologies, Creating A Livable, Sustainable Facility. The Applicable Laws, Regulations, To Building Rules, Standards And The Recommendations Of M k And Mmk Comply With The Planning Documents.. During The Performance Of The Planning Task, The Local And National Settlement Planning And Construction Requirements Must Be Observed, Such As Tam si Also The Citys Local Building Regulations. The Designers Task Is According To 191/2009.Kr., 312/2012.Kr., Cxliii Of 2015 Tv, As Well As 322/2015.Kr., 219/2004. Bc, 275/2013.Kr. Is Obliged To Provide In Accordance With Its Regulations. The Plans Have The Relevant Technical Contained In The Standards, And The M k Guide Is The Content Of The Architectural And Technical Documentation And Formal Requirements And The Mmk - Construction Licensing And Construction Technical Execution As Contained In The Regulations Entitled Content And Form Requirements Of Design Documentation Must Comply. The Task Of The Successful Tenderer Is Necessary For The Operation Of The Spa All Accessories (Equipment, Furniture, Other Chattels) - Hereinafter Collectively Referred To As Equipment - Delivery, Or Even The Existence Of These Devices For The Issuance Of A Permit For Legal Requirements A Binding Condition, Even If It Is Not Based On A Legal Requirement, But For The Operation Of The Spa Absolutely Necessary. Spa Operation: In The Spa, The Operator Is Is Obliged To Carry Out At Least The Following Activities, If Required By Law Provision Does Not Exclude Or Limit: - The Operation Of All Pools O The Pools Operates At Least 2 Pools With Medicinal Water. O Continuous Operation Of 1 Finnish Sauna O Continuous Operation Of 1 Infrared Sauna O Continuous Operation Of 1 Steam Cabin O Continuous Operation Of 1 Aroma Cabin O Continuous Operation Of 1 Salt Room O 1 Pc Continuous Operation Of Kneipp Pool O Continuous Operation Of 1 Slide O 2 Pcs Continuous Operation Of A Buffet O Continuous Operation Of 1 Restaurant O Operation Of 2 Wells Under The Conditions Stipulated In This Contract. O 1 Playground Excluding Operation From: Medical Department. Detailed In The Operation Chapter Of The Draft Contract And In The Related Annexes. The Bidders Role Is The Spa Licensee And Its Design, Construction, Operation, Maintenance And Upkeep Performing Related Tasks. The Detailed Technical Description Of Other Public Procurement Documents Contain. Assurances: A) Implementation: At Commitment Statement Is Obliged To Attach To Its Offer, According To Which, In Case Of Winning: The Entry Into Force Of The Contract After, At The Latest Until The Handover Of The 1St Work Area, The Subject Of This Contract For Construction Investment, At Least Huf 500,000,000/Year For Its Entire Duration And An Amount Of At Least Huf 250,000,000 Per Damage Event, All Risk Type Comprehensive, With Contractors Total Risk (Car) Construction And Installation Insurance Without Exclusions. (Details In The Draft Contract). The Referred Liability Insurance For Subcontractors It Is Also Necessary To Extend (Clause). B) Planning: On The Basis Of 11 Of The 322 Cr., The Planning And In The Case Of Engineering Services (Preparation Of Licensed And Construction Plans), At Is Obliged - No Later Than The 5Th Working Day After The Entry Into Force Of The Contract - Designers Professional Liability Insurance Contract Or Existing Liability Insurance For The Subject Of This Public Procurement Together Extend In Case Of Winnings: Min. Huf 50,000,000/Year And Min. Huf 25,000,000/Loss Amount For The Activity Under The Contract. C) Operation: Operator Is Obliged Take Out Professional Liability Insurance, With A Combined Limit Of At Least Huf 50M/Claim/Year, General, Tenant, Service Provider, Subcontractor, Environmental Polluter, Product Liability Extension Minimally. More Details In The Draft Contract.