GTR 72295250

Tenders Are Invited For The Second Stage Of Construction Of The Social Activity Center In Babimost

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
72295250
Tendering Authority
Subscribe to view
Tender No
BUD.271.32.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For The Second Stage Of Construction Of The Social Activity Center In Babimost
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
21-11-2023 Closed
Work Detail
There Are Two Entrances On The Ground Floor Of The Building. Access Is Via Stairs And A Lift For Disabled People. The Contractor Will Be Obliged To Bear The Costs Of Utility Consumption, I.E. Water, Energy, Etc. During The Implementation Of The Works, As Well As Prepare Traffic Organization Documentation For The Duration Of Construction And Bear The Costs Of Occupying The Road Lane For Each Type Of Road Concerned. Construction Design, Replacement Construction Design, Expansion Drawings - Addition Of A Room In The Eastern Façade Of The Building - Construction Of The Building Cass Scope Includes The Execution Of All Finishing Works Along With All Industries, I.E. Architectural, Construction, General Construction, Sanitary, Electrical And Lightning Protection, Ventilation, Sound Systems, Pumps Heat, Gas, Central Heating, Internet, Elevator Installation And Land Development. By This Provision, The Ordering Party Establishes That The Procedure Covers The Execution Of All Finishing Works And Expansion Of The Above-Mentioned. Building - Closed Shell Has Already Been Completed. The Scope Of Works Covered By The Construction Design, Replacement Construction Design, Drawings Of The Extension Of The Room To The Eastern Part Of The Building, Bills Of Quantities, Descriptions Included In This Swz (Outside The Scope - Closed Shell Of The Building) Are Included In The Scope Of This Procedure. The Contractor Is Obliged To Evaluate The Construction Design, Replacement Construction Design, Drawings Of The Addition Of A Room To The Eastern Part Of The Building In Terms Of Finishing And Equipment - Apart From The Shell And Shell State, And The Offered Price Must Include All Costs Related To The Execution Of The Order, Including All Costs Associated With The Execution Of The Subject Of The Order. Described In This Swz And The Annexes To The Swz. Bills Of Quantities Are Only An Auxiliary Element For Cost Calculation. Works Related To The Finishing Of The Cas Building, Not Included In The Bill Of Quantities, Stwior And This Swz, And Necessary To Perform The Works Covered By The Construction Design, Replacement Construction Design, Drawings Of The Addition Of A Room To The Eastern Part Of The Building - Apart From The Closed Shell State, Which Has Already Been Completed, Are Not Will Constitute Additional Works. The Contractor Is Obliged To Evaluate The Construction Design, Replacement Construction Design, Drawings Of The Addition Of A Room To The Eastern Part Of The Buildings Façade, And The Offered Price Must Include All Costs Related To The Execution Of The Order, Including All Accompanying Costs Described In This Tor And The Annexes To Swz. Bills Of Quantities Are Only An Auxiliary Element For Cost Calculation. Works Not Included In The Bill Of Quantities, Stwior And This Swz, But Necessary To Perform The Works Covered By The Construction Design, Replacement Construction Design, Drawings For The Addition Of A Room To The Eastern Part Of The Building, Will Not Constitute Additional Works. Moreover, The Gross Price Of The Offer Should Include The Valuation Of Equipment In Accordance With The List Presented Below. The Detailed Description Of The Order Includes: - Construction Design, Replacement Construction Design, Drawings Of The Expansion Of The Building With A Room In The Eastern Façade Of The Building, A Room With An Area Of 32.01 M2 - Bill Of Quantities - Stwior. Contractors Are Recommended To Conduct A Local Inspection Of The Construction Site Before Submitting An Offer. Any Difficulties Resulting From The Conditions Of Execution Of The Subject Of The Order Should Be Included In The Price Given In The Offer. The Contractor Bears All Costs Related To The Preparation And Organization Of The Construction Site, Including Marking The Works, Securing The Sidewalk Or Excluding The Use Of Part Of The Sidewalk Adjacent To The Building, Traffic Organization, Costs Of Occupying The Road, Costs Of Utility Consumption, Etc. Design Documentation And Bills Of Quantities Of Works In Detail Describe The Subject Of The Order, And The Requirements Specified At Least In One Place Are Binding For The Contractor As If They Were Included In The Entire Documentation. The Contractor May Not Use Errors Or Omissions In The Documents, And Should Immediately Notify The Ordering Party Of Their Detection, Who Will Make Appropriate Changes And Corrections. All Formalities And Costs Related To The Execution Of The Subject Of The Order Are The Responsibility Of The Contractor And Are Included In The Price Of The Offer Submitted To The Ordering Party. The Contractor Will Have To Mark The Area Where Construction And Geological Works Will Be Carried Out. The Contractors Obligation Will Be To Ensure And Comply With Health And Safety Conditions, Protect The Interests Of Third Parties, Repair Any Damage Caused During Implementation, And Protect Property Related To The Construction (The Contractors Materials And Equipment And The Ordering Partys Property). After Completion Of The Works, But Before The Final Acceptance By The Ordering Party, The Contractor Is Obliged To Tidy Up The Construction Site And The Adjacent Area. Details Of The Works: - Install 100% Darkening Window Blinds On The First Floor And Attic - Vertical Blinds On The Ground Floor - Internal Window Sills - Made Of Conglomerate - External Window Sills Polished Granite - Stucco - Facade Cornices - Strips Around All Windows And Doors Made Of Extruded Polystyrene - External Facade - 20 Cm Mineral Wool, Thin-Layer Plaster - External Facade Lighting - 20 Led Fixtures To Illuminate The Facade - Internal Lighting - 6000 Lumen Led Fixtures 60X60 Mounted In The Suspended Ceiling - Foldable Mobile Sliding Wall - Room On The First Floor - Mobile Sliding Wall - First Floor Kitchen, Attic Kitchen - Ceilings In All Rooms - Suspended From 60X60 Panels, In The First Floor And Attic Room Filled With Ecofon Boards - Floors - All Utility Rooms - Welded Roll Carpet - Sanitary Facilities Walls And Floors - Tiles, Walls Up To Full Height - Corridors And Stairs - Polished Granite - Adjustable Door Frames - Underfloor To Radiator Heating On The Ground Floor - Central Heating Boiler - Power Conversion From 25Kw To 50Kw - Cloakroom Equipment - Standing Hangers For 60 People - Roof Covering Expansion - Thermal Weldable Felt - The Following Installations Should Be Installed In The Added Room: Electrical, Central Heating, Ventilation And Computer - Land Development Should Be Reduced By The Expansion Area (Edges, Curbs, Paving Stones) - Lightning Protection Installation - The Lightning Protection Installation Should Cover The Entire Building - Social Rooms - Catering Rooms Should Be Equipped With Furniture: Lower Cabinets (2.90 + 2.55 + 1.6) And Upper Cabinets (2.90 + 2.55 + 1.6), 2 Refrigerators, 3 Dishwashers, Single-Bowl Stainless Steel Sink 3 Pcs., Kitchen Table / Countertop 3 Pcs., Chairs / Stools 6 Pcs. - Furniture Equipment: - Conference Tables - 57 Pcs. - Conference Chairs - 122 Pcs. - Desks - 7 Pcs. - Desk Chairs - 7 Pcs. .- Office Cabinets, Width 90, Height 200 - 16 Pcs. - Office Cabinets, Width 60, Height 200 - 5 Pcs. - Office Cabinets, Width 90, Height 130 - 8 Pcs. - Standing Hanger - 4 Pcs. - Wall Hanger - For 40 People - Wall Hanger - For 60 People • Double Pel/Lan Sockets (Two Lan Connectors In One Socket) 6 Categories: - Ground Floor: 14 Wall Sockets (28 Lan Connectors) - First Floor: 10 Floor Sockets + 10 Sockets In The Wall (40 Lan Connectors) - Attic: 10 Sockets In The Wall (20 Lan Connectors)• Devices For Launching Lan And Wifi Networks:• 100 X Patch Cord Cable 6 Cat.• 3 X Access Point - Wifi 6 Standard - Supported Frequencies: 5Ghz (802.11 A/N/Ac Wave 2/Ax, 2X2:2) And 2.4Ghz (802.11 B/G/N/Ax, 2X2:2) - Rj45 1Gbe Interface - Security: Wpa3-Aes, Wpa3-Enterprise, Wpa2 (Ccmp, Aes, 802.11I), Wpa2 Enterprise (802.1X/Eap), Wep, Open- Antennas With Gain: For 5 Ghz Min. 6Dbi; For 2.4 Ghz Min. 5 Dbi - Guest Network Support With A Built-In Login Portal - Possibility To Limit Clients: Bitrate And Time - Poe Power Supply In The 802.3Af Standard • Switch - Min. 96 1Gbe Ports, Possibility Of Using Two Devices Connected Via The Sfp+ Uplink Port - Performance Min. 170 Gbps - Manageable, Supporting The Layer 2 And 3 - Poe Support - Management Via Cli, Cloud, Web Browser - Address Table Size Min. 15000 • 3 X Tvs (1 In The Attic + 2 In The Room On The First Floor) - 55-Inch Tvs - With Hangers Adjustable In Every Plane (Adjustable Distance From The Wall, Adjustable Angle Horizontally And Vertically) - Qled Technology - Uhd 4K Resolution - Smart Tv - Min. Wifi 5 (802.11Ac) - Bluetooth Min. Version 5.2- Min. 3 Hdmi Connectors- Min. 2 Usb Connectors- Ethernet Lan Rj45- Optical Digital Audio Output- Hdr10+- Refresh Rate Min. 120Hz• Fire Sensors In Each Room• 19-Inch Hanging Rack Cabinet:- With A Category 6 Patch Panel Min. 100 Ports - Min. 12U - Secured With A Lock - Removable Steel Panels - Glazed Steel Front Door - Cable Openings In The Top And Bottom Plate - Possibility To Install Fans • 3 Desktop Computers With Monitor And Multifunction Device - Processor Min. 6 Cores And 12 Threads, Min. 18Mb Cache, Compatible With Windows 11, Achieving At Least 19,000 Points In Cpu Mark - Ram Min. 16Gb Ddr4 Or Ddr5- Nvme Ssd Drive Min. 500Gb In The M.2 Pcie Connector - 64-Bit Operating System Not Older Than Windows 10 - Keyboard With Mouse - Minimum 23.5-Inch Monitor, Ips Or Va Matrix, Fullhd, With Built-In Speakers, Hdmi And Dsiplayport Inputs, 16X9 Format, Flat Screen Type , Reaction Time Min. 2Ms, Brightness Min. 250Cd/M2, Screen Refresh Rate Min. 100Hz, Static Contrast Min. 1000:1 - Microsoft Office Office Suite - Ups Power Supply - Multifunctional Device (Scanning, Copying, Printing): Color Inkjet Printing Technology, Ink Refilling System, Automatic Two-Sided Printing, Adf Feeder For Document Scanner, Usb And Wifi Connection• 2 X Projector - Ansi Brightness Min. 5000 Lumens - Image Format 16X9 And 4:3 - Hdr - Resolution Min. Full Hd (1920X1080) - Contrast Min. 10000:1- Hdmi And Vga Inputs- Lamp Life In Normal Mode Min. 5000H• 2 X Electric Projection Screen- Remote Control And Wall Controller- Possibility Of Mounting On The Wall And Ceiling- Projection Area Min. 150 Inch 16X9
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
bbc6325f-e867-43bc-ac3a-7be32c4e77ed.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you