GTR 72057602

Tenders Are Invited For Renovation Of Rooms In The Building Of The Social Welfare Center At Ul. Wolności 1 In Pniewy

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
72057602
Tendering Authority
Subscribe to view
Tender No
D.262.TP.1.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of Rooms In The Building Of The Social Welfare Center At Ul. Wolności 1 In Pniewy
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
15-11-2023 Closed
Work Detail
The Subject Of The Order Is The Renovation Of Some Rooms Located On The Ground Floor Of The Building Of The Social Welfare Center In Pniewy At Ul. Wolności 1. The Scope Of Work Covered By This Procedure Is Specified In The Design Documentation, Technical Specification For The Execution And Acceptance Of Works, And The Bill Of Quantities. Note. The Scope Of Renovation Includes Façade Works, Window Replacement And Changes In Land Development. List Of Renovation Works: Wind Workdisassembly And Demolition Robots. 1. Disassembly Of The Interior Door With The Frame With The Symbol D4 (Door To Be Rebuilt), 2. Widening The Existing Opening - Carving Out Part Of The Wall, According To Drawing A-02. Note - A New Door Opening Is Planned To Be Carved In The External Wall Of The Vestibule, This Should Be Done According To Separate Documentation)3. Dismantling The Existing Ceramic Tile Floorconstruction And Finishing Works1. Before Forging The Hole, A New Steel Lintel Should Be Inserted, In Accordance With Drawings A-03, A-09. Note - The Final Bottom Of The Lintel And The Number Of Lintel Beams Should Be Finally Determined After Making The Openings.2. Filling The Gaps And Filling The Area Where The Door Was Dismantled And A New Lintel Was Installed, 3. Painting The Walls And Ceiling Of The Entire Room With Emulsion Paint, 4. Laying New Ash-Colored Stoneware Tiles On The Entire Floor Surface, With A 10 Cmkl Plinth. Stairway + Corridordisassembly And Demolition Works. 1. Disassembly Of The Interior Door With The Door Frame With The Symbol D5 (Door To Be Rebuilt), 2. Widening The Existing Opening - Carving Out Part Of The Wall, According To Drawings A-02, A-093. Removal Of Existing Radiator4. Removal Of Existing Floor Tiles5. Disassembly Of The Fire Extinguisher Cabinet And Alarm Cabinet (To Be Moved)6. Lighting Switches To Be Movedconstruction And Finishing Works1. Before Forging The Hole, A New Steel Lintel Should Be Inserted, In Accordance With Drawings A-03, A-09. Note - The Final Bottom Of The Lintel And The Number Of Lintel Beams Should Be Finally Determined After Making The Openings2. Filling The Gaps And Filling The Area Where The Door Was Dismantled And A New Lintel Was Installed3. Painting The Walls And Ceiling Of The Entire Room With Emulsion Paint 4. Laying New Ash-Colored Stoneware Tiles On The Entire Floor Surface (Except For The Wooden Stairs), With A Plinth 10 Cm5 High. Shifting The Existing Radiator, As Shown In Fig. A-06. Installation Of An Anti-Panic Gate, In Accordance With Fig. A-03 Or Construction Of Carpentry For The Descent To The Basement (According To The Investors Decision). Attention - When Making The Carpentry Construction Of The Entrance, The Radiator Should Not Be Moved (Heating The Corridor And Staircase)7. Installation Of The Fire Extinguisher And Alarm Cabinet In The Place Indicated In Drawing A-038. Moving 2 Light Switches, In Accordance With Fig. A-039. Installation Of An Additional Ceiling Light Point, In Accordance With Fig. A-3, Connect It To The Light Switch For The Corridor. Resident Service Office Disassembly And Demolition Works. 1. Dismantling The Existing Ceramic Tile Floor With The Plinth2. Forging A New Door Opening In The Partition Wall To The Room. No. 0.4 With Dimensions 100X210cm3. Light Switch And Ceiling Lighting To Be Movedconstruction And Finishing Works1. Installation Of New Doors (With Symbol D2), Specifications According To Drawing A-042. Construction Of A New Partition Wall Between Rooms 0.3 And 0.2, With A Lightweight Structure Of Plasterboards On A Steel Grid, Filling With Mineral Wool.3. Preparation Of The Door Opening In The Above-Mentioned Partition Wall For The Installation Of Doors, Doors With The Symbol D5 (Dismantled)4. Filling Gaps And Filling In The Place Where The New Door Opening Was Made And Where The New Partition Wall Was Made5. Painting The Walls And Ceiling Of The Entire Room With Emulsion Paint 6. Laying A Pvc Floor Covering With A 10 Cm High Plinth On A Previously Leveled Floor Surface7. Moving The Light Switch 1 Pc. And Ceiling Lighting 1 Pc., According To Drawing A-038. Carry Out Telecommunications Installation. Osl Office Disassembly And Demolition Works. 1. Disassembly Of The Existing Door With A Frame With The Symbol D7 (To Be Rebuilt) Between Rooms No. 0.4 And 0.5. Construction And Finishing Works1. Walling Up Part Of The Existing Doorway Between Rooms No. 0.4 And 0.5 (Aerated Concrete Blocks, Size 600, Plastered On Both Sides)2. In The Left Hole, A New Door With The Symbol D2 Should Be Installed, Specifications According To Fig. A-4 3. Filling The Gaps And Filling The Door Opening4. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room5. The Pvc Floor Covering Remains Unchanged (Must Be Secured During Work)6. Carry Out Telecommunications Installation. Senior Club Office Senior Club Disassembly And Demolition Works. 1. Separation Of Rooms Using A Mobile Wall - Installation Of A Steel Substructure With The Existing Ceiling, In Accordance With Drawings A-03, A-092. Steel Substructure Casing Using Gk3 Boards. Filling Gaps And Filling In The Place Of Mounting The Mobile Wall4. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room5. The Pvc Floor Covering Remains Unchanged (Must Be Secured During Work)6. Carry Out Telecommunication Installation Klub Seniorar Disassembly And Demolition Works. 1. Filling The Gaps And Filling The Area Where The Door Opening Was Enlarged2. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room3. The Pvc Floor Covering Remains Unchanged (Should Be Secured During The Work).Holdisassembly And Demolition Works. 1. Disassembly Of The Interior Door With The Frame With The Symbol D6 (Door To Be Rebuilt), 2. Widening The Existing Opening - Carving Out Part Of The Wall, In Accordance With Drawing A-02Construction And Finishing Works1. Before Forging The Hole, A New Steel Lintel Should Be Inserted, In Accordance With Drawings A-03, A-09. Note - The Final Bottom Of The Lintel And The Number Of Lintel Beams Should Be Finally Determined After Making The Openings2. Installation Of A New Door (With Symbol D7), Specification According To Fig. A-04 Note - Confirm The Size Of The Opening After Checking The Dimensions Of The Existing D73 Door. Filling The Gaps And Filling The Area Where The Door Was Dismantled And A New Lintel Was Installed4. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room. Corridor. Disassembly And Demolition Works. 1. Disassembly Of The Fire Extinguisher And Fire Blanket (To Be Moved)Construction And Finishing Works1. Construction Of A New Partition Wall In A Lightweight Structure Made Of Plasterboards Between Rooms No. 0.7A And 0.7B, With A Door Opening With The Symbol D6 (Removed)2. Installation Of Doors With The Symbol D6 Note - Confirm The Opening Size After Checking The Dimensions Of The Existing D63 Doors. Filling The Gaps And Filling The Area Where The Door Was Dismantled And A New Lintel Was Installed4. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room5. Installation Of A Lighting Switch, 1 Piece, In Accordance With Fig. A-03, For A Newly Separated Room Kitchendisassembly And Demolition Works. 1. Disassembly Of The Feeding Windowconstruction And Finishing Works1. Blocking Up The Window Opening2. Painting The Wall In Which The Opening Was Bricked Up With Emulsion Paint. Office Kipus, Ous Disassembly And Demolition Works. 1. Disassembly Of Existing Sanitary Equipment - Washbasins, Toilets, Hot Water Heater, Sewage Grate2. Disassembly Of All Partition Walls (Brick Walls 6 Cm Thick, Height 2.0 M)3. Disassembly Of Doors From Partition Walls - 2 Pcs. 4. Cutting Off The Ventilation Hole (Connecting It To Room No. 0.8B)5. Removal Of Tiles From The Floor And Walls6. Disassembly Of The Door Opening Between The Rooms. No. 0.9 And 0.2 Construction And Finishing Works1. Installation Of Doors With The Symbol D4 (Doors Dismantled - Before Installation, Check Their Dimensions And Confirm The Size Of The Existing Door Opening). If Necessary, Adjust The Size Of The Existing Opening To The Size Of The Door (Ex. Lintel Size).2. Filling The Gaps And Filling The Place Where The New Door Opening Was Made3. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room4. Laying A New Pvc Floor Covering With A 10 Cm High Plinth, After Leveling The Subfloor5. Rebuild The Ceiling Lighting - Distribute 2 Ceiling Lamps Evenly6. Add Plug Sockets – 4 Pcs. After Agreeing On The Location With The Investor7. Connect The Room To The Alarm8. Carry Out Telecommunication Installationcommunicationdisassembly And Demolition Works. 1. Dismantling Of Existing Partition Walls With A Thickness Of 6 And 12Cm2. Disassembly Of Existing Interior Doors – 3 Pcs.3. Dismantling Of Existing Sanitary Equipment - Washbasins, Toilet, Urinal4. Disassembly From The Radiator – 1 Pc. To Be Postponed5. Removal Of Ceramic Tiles From The Floor And Walls6. Disassembly And Reconstruction Of The Electrical Installation7. Dismantling And Reconstruction Of Sanitary Installationsconstruction And Finishing Works1. Construction Of A New Brick Partition Wall, Plastered On Both Sides, In Accordance With Drawing A-032. Painting The Walls And Ceiling With Emulsion Paint Of The Entire Room3. Construction Of A New Floor With Anti-Slip Ceramic Tiles, With A 10 Cm High Plinth. 4. Relocation Of Ceiling Lighting Womens Wc Disassembly And Demolition Works. 1. Dismantling Of Existing Partition Walls With A Thickness Of 6 And 12Cm2. Disassembly Of Existing Interior Doors – 3 Pcs.3. Dismantling Of Existing Sanitary Equipment - Washbasins, Toilet, Urinal4. Disassembly From The Radiator – 1 Pc. To Be Postponed5. Removal Of Ceramic Tiles From The Floor And Walls6. Disassembly And Reconstruction Of The Electrical Installation7. Dismantling And Reconstruction Of Sanitary Installationsconstruction And Finishing Works1. Construction Of New Brick Partition Walls, Plastered On Both Sides, In Accordance With Fig. A-03 2. Installation Of New Doors With The Symbol D3-3 Pcs., In Accordance With Fig. A-04 3. Installation Of New Sanitary Equipment (Washbasin And Toilets) Note - Washbasins ( 2 Pcs.) Should Be Installed With Point Water Heaters 4. Construction Of New Water And Sanitary Sewage Connections (Reconstruction Of Existing Ones) 5. Painting .... The Entire Description Of The Subject Of The Order Is Included In The Technical Documentation Constituting Annex No. 1 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
468b9588-c9c2-449a-9c40-a88bd246af90.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders