GTR 72008051

Tenders Are Invited For Reconstruction And Expansion Of Słowackiego And Adama Asnyka Streets In Dobiegniew - Stage I. Extension Of Dąbrowskiego Street In Dobiegniew.

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
72008051
Tendering Authority
Subscribe to view
Tender No
RKG.271.18.2023.ES
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction And Expansion Of Słowackiego And Adama Asnyka Streets In Dobiegniew - Stage I. Extension Of Dąbrowskiego Street In Dobiegniew.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
15-11-2023 Closed
Work Detail
1) Part 1 - Construction Works Consisting In The Reconstruction And Extension Of Part Of Adama Asnyka Street In Dobiegniew And The Extension Of Dąbrowskiego Street In Dobiegniew. A) The Scope Of The Investment Includes The Reconstruction And Extension Of Part Of Adama Asnyka Street - Stage I, Including: - Demolition Of The Road , Exits, Sidewalks, Fencing, - Securing The Infrastructure Network, - Leveling The Area, - Making New Surfaces Of Streets And Exits, - Construction Of Sidewalks, - Topsoil And Grassing Of Green Areas, - Construction Of Traffic Safety Devices, - Construction Of A Technological Canal, - Construction Of A Storm Sewage Network With A Pumping Station, Tanks, A Separator, A Sedimentation Tank, - Construction Of A Technological Road To Service Retention Reservoirs, - Road Marking In Accordance With The Documentation. - Construction And Reconstruction Of Road Lighting, - Construction Of A Rainwater Pumping Station Power Supply System. Attention! The Contractor Is Obliged To Remove Conflicts With The Energy Infrastructure. Due To The Fact That After Obtaining A Construction Permit (Zrid), Enea Operator Issued Conditions For Removing The Conflict (Collision No. 08/O/Kol/Rd-3/2023, Letter Of March 17 2023), The Ordering Party, In Consultation With Enea Operator, Established The Following Conditions For Eliminating The Conflict: - In The Scope Of The 110 Kv Line - A Replacement Construction Design Was Agreed, A Design For Non-Significant Changes - Annex No. 12E To The Swz; - In The Field Of 15 And 0.4 Kv Networks, The Contractor Is Obliged To Prepare Design Documentation And Perform The Work Necessary To Remove Conflicts In Accordance With The Requirements Set Out In The Letter Of March 17, 2023, Point Iii For Conflict No. 08/O/Kol/Rd-3 /2023 (Only In The Scope Of Point I, Point 2, Letter A And Point 3, Letter E And Point I, In Accordance With The Communes Letter Of May 8, 2023) It Is Assumed That A Decision On A Building Permit Or Notification Of Construction Works Will Not Be Necessary - For This Part Of The Order, And Only The Introduction Of An Insignificant Change To The Construction Design Approved By The Zrid Decision (Annex 12G). All Correspondence And Arrangements With Enea Operator Constitute Annexes No. 12E And 12G To The Swz And Include: - Conditions For Eliminating Conflicts No. 08/O/Kol/Rd-3/2023, Letter Of March 17, 2023. From Enea Operator Distribution Branch In Gorzów Wlkp. - Letter Ref. Rkg.701106.2020.Jm Of May 8, 2023. As A Response To The Conditions For Eliminating Conflicts - Graphic Attachment To The Conditions For Eliminating Conflicts - Letter Of October 6, 2023. Reference Number Od2/Zms/Su/Pm/121/2023 Enea Operator Distribution Branch In Gorzów Wielkopolski - Draft Of Non-Significant Changes To The Construction Project Regarding The Construction Of A Stormwater Sewage System Along With A Land Development Map. The Subject Of The Contract Is Specified In Detail In The Annex To The Swz - Description Of The Subject Of The Contract: Annex No. 12 To The Swz. B) Extension Of Dąbrowskiego Street In Dobiegniew The Subject Of The Order Is Detailed In Annex No. 13 To The Swz - Description Of The Subject Of The Order (Opz): Design Documentation - Construction Design - Architectural And Construction Design - Road Industry, Land Development Design, Architectural And Construction Design For The Industry Telecommunications) And Technical Specification For The Execution And Acceptance Of Construction Works, Opinions, Arrangements, Decisions, Executive Design. The Task Includes, Among Others: - Extension Of Dąbrowskiego Street For A Length Of Approx. 170 M, From The Intersection With Ul. Wileńska To The Intersection With Ul. Polna. - Reconstruction Of Ordinary Intersection Areas, - Reconstruction Of Entrances To The Property, - Construction And Reconstruction Of Pedestrian Routes, - Removal Of Trees And Shrubs Colliding With The Investment. - Removal Of Conflicts With The Existing Telecommunications Network (Reconstruction Of Technical Sewage, Telecommunications Wells, Duct Cables, Securing The Existing Telecommunications Infrastructure), - Making Markings In Accordance With The Documentation.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c4b429d6-b7c9-4db2-9be4-0e26c1f14954.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders