Earthworks Angergries_02. The Deggendorf Water Management Office Is Carrying Out Structural Improvement Measures On The Lower Isar Between Plattling And The Mouth Of The Danube. The Aim Of These Measures Is To Renaturate The Floodplain Landscape And Improve The Stability Of The River Bed. The “Angergries” Measure Will Be Carried Out In Two Construction Phases: The First Construction Phase Was Completed In February/March 2023. The Second Construction Phase Must Be Carried Out By The Deadlines Specified In Form L 214. For This Purpose, Landfills (Flood Sediments) And Raised Bank Edges Are Removed On The Right Side Of The Isar. A River Profile Is Then Excavated And Modeled. The Existing Riverside Path Will Be Prepared As A Construction Road In Advance. It Will Be Gradually Dismantled And Removed As Part Of The Removal Work.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.