Fabr ges Low Flow Valve Supply And Installation (Phase 2). The Phase 2 Project Consists Of: Supplying And Installing The Overspeed Vane, The Valve, The Hollow Jet And The Piping (In Grp (Plastic Material) Or Steel) For The New Low Flow Line At Fabr ges. The Hollow Jet Will Be Installed In A Room (Gc Part). The Phase 1 Project Consisted Of: Supplying And Installing The Dn700 Connection And The Dn700 Valve (And Solid Bottom + Hydraulic Power Plant)