1. The Subject Of The Order Is The Renovation Of The Complex Of Sports Fields And Sports Equipment Of The School Complex In Drawsko Pomorskie, At 7.2 Po czy ska Street. The Modernization Includes: A) Renovation Of The Football Pitch, B) Renovation Of The Volleyball And Basketball Pitch, C) Modernization And Installation Of Athletics Equipment, D) Modernization Of The Pitch Lighting, E) Drainage Of The Area In The Area Of The Pitches And Equipment Planned For Modernization Sports, F) Reconstruction Of The Surface Of Pedestrian Communication Routes To The Renovated Sports Fields And Equipment, G) Modernization Of The Locker Room And Sanitary Facilities, H) Construction Of Fencing Of The Sports Fields.3. The Subject Of The Order Must Be Performed In Accordance With The Descriptions Of The Subject Of The Order, Construction And Executive Designs, Technical Specifications For The Execution And Acceptance Of Works, Principles Of Construction Art And Applicable Regulations. Additionally (In Addition), Bills Of Quantities Are Attached.4. Modernization Works Will Be Carried Out On The Ground And Asphalt Surfaces And In The Single-Story Building. The Scope Of Works Was Specified In The Construction Design Consisting Of Parts I-Iv.5. The Scope Of Work Includes In Particular: A) Execution Of Earthworks Appropriate For The Entire Investment Project In Accordance With The Design Documentation B) Construction Of A Football Pitch With Overall Dimensions Along With Runs (62.50 X 30.50 M) With A Synthetic Grass Surface (Parameters Technical And Functional In Accordance With The Msit Guidelines For Orlik 2012 Pitches) And Installation Of Equipment, Including 2 Aluminum Goals With Dimensions Of 5.00 M X 2.00 M With Football Nets And Ball Catches With A Height Of 6 M And A Length Of 17.52 M With Knotless Polypropylene Nets ; C) Construction Of A Dual-Function Volleyball And Basketball Court With Dimensions Of 32.60 M X 19.60 M With A Water-Permeable Polyurethane Surface Along With Permanent Installation Of Basketball Equipment (2 Baskets) And The Possibility Of Assembly And Quick Disassembly Of Posts And A Volleyball Net, D) Execution Athletics Equipment, Including: - A Four-Track Track With A Total Length Of 80 M, Including 3 M Before The Starting Line + 60 M Running Distance + 17 M Runway (Braking Zone), Spray Type Running Track Surface With Lines Separating Fields/Tracks, - A Long Jump And Triple Jump Hill With The Use Of A Four-Track Spray Type Track For The Inrun At The End Of Which A Jump Must Be Installed, Marked In Figure A-1 With The Number 9, - A High Jump Hill Consisting Of A Runway And A Jump With A Polyurethane Surface, Marked In Drawing A-1, Number 7 - Shot Put Throwing Area Consisting Of An External Steel Circle Filled With Concrete With A Mounted Wooden Threshold And A Throwing Zone With A Brick Flour Surface And Rubberized Edges, E) Dismantling Of The Existing Field Gym With Assembly In A New Location In Accordance With Construction Design, F) Execution Of Lighting For The Sports Field Complex In Accordance With The Requirements For These Facilities, Along With The Expansion Of The Existing Area Lighting Into Park Light Points (Part Iv Of The Plan), G) Construction Of New Accesses And Sidewalks To The Renovated Fields And Facilities (Communication Routes), H) Construction Of A Panel Fence For The Pitches In Accordance With The Pb, I) Installation Of Two 10-Seat Bicycle Racks, J) Construction Of Drainage And Drainage Of The Pitches And Sports Equipment In Order To Standardize The Water Conditions In The Area Of The Investment Project Along With The Inclusion Of The Existing Rainwater Sewage System On The Plot (In Accordance With The Documentation Design - Part Iii) K) Renovation Of The Cloakroom And Sanitary Facilities In Accordance With Drawings B-3 And B-4, Including: - Demolition And Dismantling Works Inside The Building, - Repair Of Damaged Plasters, - Internal Finishing Works: Painting, Flooring In Sanitary And Cloakroom Rooms Made Of Anti-Slip Gress Ceramic Tiles, Repair Of Floors In Rooms, - Reconstruction Of The Entrance To The Building And Installation Of A Ramp For Disabled People From The Side Of The Sports Fields, - Removal And Disposal Of Demolition Materials. L) In Addition, The Contractor Will Deliver And Install The Necessary Equipment In Accordance With The Attached Specification Of Additional Equipment.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.