1. The Subject Of The Order Is Expansion Of The Volunteer Fire Department In Charzewice In Order To Integrate The Local Community, Including The Reconstruction, Expansion And Extension Of The Charzewice Volunteer Fire Department Station Building, Construction Of A Sanitary Sewage Connection Along With The Reconstruction Of The Network And The Lv Power Connection For Plot No. 1156/5 , 1157/2 W Stalowa Wola - The Task Is Co-Financed Under The Government Fund Polish Order: Strategic Investment Program.2. The Basic Scope Of Works Includes: 1) The Investment Includes The Reconstruction, Expansion And Superstructure Of The Fire Station Building Of The Charzewice Volunteer Fire Department In Stalowa Wola With Additional Rooms: Internal And External Staircases, Expansion Of The Existing Garage Room With Another 2 Parking Spaces For Combat Vehicles, Remaining Rooms On The First Floor Floor Of The Building, Such As A Toilet For The Disabled, A Public Toilet For Men And Women, A Social Room And A Common Room.2) Conflicting Connections And Elements Of The Low-Voltage Energy Network. Scheduled For Reconstruction. Due To The Inability To Expand The Existing Internal Sanitary Sewage System, A New Connection To The Building Must Be Made. The Scope Of Works Includes Works In The Existing Part Of The Building, Such As: A) Construction Of A Fire-Fighting Vestibule With Doors With Fire Resistance Ei30 (At The G Axis) B) Replacement Of The Window On The Ground Floor Between The E And F Axis With Non-Opening Ones With Ei 15 Resistance. C) Construction Of 2 Pieces Of Steel Openings And Lintels In The G Axis In The Existing Load-Bearing Wall Along With The Removal Of External Covering Layers (Removal Of Brick And Insulation And Leaving Only The Load-Bearing Layer) - Existing 3-Layer Load-Bearing Walld) Construction Of Additional Reinforced Concrete Columns With Foundations In Axis 3 At The Entrance To Room No. 0.3E) Replacement Of 2 Existing Garage Doors With New Ones (Ground Floor, Axis 8) F) Insulation Of The Existing Three-Layer Walls Of The Building With Wool. 8 Cm With A Layer Of Thin-Layer Silicone Plaster. 2Mmg) Replacement Of The Existing Roofing Made Of Metal Tiles With A Covering Made Of Coated Standing Seam Sheet Metal Along With Cladding, Wind Insulation And Necessary Sheet Metal Flashingsh) Demolition Of The Existing Wooden Shelter And Re-Assembly On The Investment Site In A Place Indicated By The Ordering Party, Maintaining A Distance From The Building Of 12 Mi) Reinforcement Of The Existing Foundationsj) Reinforcement Of Existing Ceilings Made Of Hollow-Core Slabs With Carbon Tapesk) Protection Of Existing Hollow-Core Slabs Made Of Fire-Resistant Plasterboards And Mineral Wool In Order To Meet The Rei120 Condition L) Installation Of An Exhaust Gas Discharge System For 4 Parking Spaces In The Garageum) Other Accompanying Works In Accordance With The Drawing Documentation, Bills Of Quantities And Technical Description3) The Scope Of Works For The Newly Designed Part Of The Building, Land Development And Other Industries Should Be Considered On The Basis Of Drawing Documentation, Technical Descriptions And Bills Of Quantities.3. The Contractor Will Perform The Construction Works Covered By This Order In A Comprehensive Manner, In Accordance With Applicable Technical Conditions, Standards, Norms, Instructions And Other Regulations Regarding Workmanship, Including Min. With: A) The Provisions Contained In The Construction Law Act Of July 7, 1994 (Consolidated Text: Journal Of Laws 2023, Item 682, As Amended); B) The Provisions Contained In The Regulation Of The Minister Of Infrastructure Of April 12, 2002. On The Technical Conditions To Be Met By Buildings And Their Location (Journal Of Laws Of 2022, Item 1225, As Amended); C) All Regulations And Standards Applicable And Affecting The Completeness And Correctness Of The Task Performance And The Target Safety Of Use, Together With With Durability. D) Modern Technical Knowledge And In A Way That Ensures The Proper Quality Of These Works.4. Under This Order, The Contractor Will Bear All Costs Necessary To Perform The Task And Obtain The Necessary Permits. Investment Location: 1) Plot No. 1156/5, 1157/2, District 0001 Charzewice, Stalowa Wola Commune.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.