Demolition Work Necessary For The Construction Of The New Ppke Campus. Contract For Carrying Out The Demolition Work Required For The Realization Of The New Campus Of P zm ny P ter Catholic University. Due To The Character Limitation, Additional Regulations Belonging To Point Vi.3) Further Information: Of The Rf, Which Appear In This Point Of The Rf: Ak Records That 322/2015 On The Detailed Rules For The Public Procurement Of Construction Projects And Design And Engineering Services Related To Construction Projects. (X. 30.) According To Section 24 (1) Of The Government Decree, The Offers Made On The Reading Sheet For The 18Th Evaluation Criteria In The Bidding Stage Of The Procedure Are Considered Professional Offers. Additional Documents And Information To Support The Recommendations According To The Individual Evaluation Criteria, Considered By The Ak As A Professional Offer: 1St Evaluation Criterion: Fully Priced Budget (In Pdf And Excel Format Signed By The Company), 2Nd Evaluation Criterion: Demolition Technology And Demolition Organization Project Plan, Evaluation Criterion 3: Technical Offer Evaluation Criterion 4: Demolition Waste Control And Management Plan 57. Evaluation Criteria: Environmental Protection And Sustainability Management Plan, Within This Framework Noise And Vibration Protection Measures Plan, Which Includes, Among Other Things, The Measures Planned To Reduce Noise And Vibration Emissions, Their Expected Results, And The Time Required For The Technical And Administrative Implementation Of The Measures. Noisy Vibration Load And Load Measurement Plan Air Protection Action Plan Air Load And Air Load Measurement Plan Evaluation Criterion 8: The Personality Of The Professional. The Documents Detailed Below Must Be Provided Only To The Winning Tenderer And At The Latest At The Same Time As The Contract Is Signed Or After The Contract Has Been Concluded: Utility Abandonment Plan (After Conclusion Of Contract) Quality Assurance And Sampling Plan (After Signing The Contract) Occupational Safety, Fire Safety And Health Plan (At The Same Time As Signing The Contract) Public Space Reservation And Traffic Engineering Plan (After Signing A Contract) Asbestos Removal Work Plan (At The Same Time As The Contract Is Signed) Plan Of Methodological Solutions For Risk Assessment And Risk Management (At The Same Time As Signing The Contract) Human Resources Plan (After Signing A Contract) Asset Resource Plan (After Signing A Contract) Financial Schedule (At The Same Time As The Contract Is Signed). Tenderer Is The Kbt. Taking Into Account The Legal Regulations Contained In 71, Paragraph (8), Point B), The Applicants Are Strongly Reminded That In Connection With The Complete Lack Of Any Document And/Or Information That Is Part Of The Professional Offer, They Cannot Order To Make Up For The Deficiency! The Detailed Procurement Documents For The Bidding Stage Of The Procedure Contain The Detailed Requirements Of The Contracting Authority For Certain Content Elements Of The Professional Offer. 16. The Bidder Must Also Attach The Detailed Technical Schedule (Gantt Diagram) As Part Of His Bid, Only For Indicative Purposes, Which Ak Does Not Otherwise Consider As Part Of The Professional Bid.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.