Drilling And Geophysics. Examinations 1 - 6 E Ern Str. 5903 Pegnitztal. Drilling And Geophysics. Investigations 1 6 E Ern Str. 5903 Pegnitztal Subsoil Investigations Using Direct And Indirect Exploration Methods And Carrying Out Geophysical Measurements As Well As Expanding Groundwater Measuring Points Outside The Danger Area At The E s Km 38,321 / Km 41,467 / Km 42,151 / Km 42,671 / Km 50,029 And Km 50,375, Along The Railway Line 5309 Nuremberg - Schirnding. The Samples And Drill Cores Obtained Must Be Transported And Stored In The Sample Storage Provided. In Addition, Survey Work Of The Exploration Points, Explosive Ordnance Clearance Measurements At E Km 41,467 And E Km 50,029 And Sampling And Declaration Analysis Must Be Carried Out And A Construction Site Clearance Must Be Carried Out. The Following Direct Digestion Types Are Intended: Core Drilling With Continuous Collection Of Cored Samples (Bk / Bks)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.