GTR 71635966
Tenders Are Invited For Roof Renovation Based On The Technical Design Titled Preparation Of Design Documentation For The Replacement Of The Roof Covering - Building No. 20 In The Military Complex At Ul. Ul. Trzeciaków 3 In Grudziądz
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
71635966
Tendering Authority
Subscribe to view
Tender No
91/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Roof Renovation Based On The Technical Design Titled Preparation Of Design Documentation For The Replacement Of The Roof Covering - Building No. 20 In The Military Complex At Ul. Ul. Trzeciaków 3 In Grudziądz
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
07-11-2023
Closed
Work Detail
The Subject Of The Order Is The Renovation Of The Roof Based On The Technical Design Entitled: Preparation Of Design Documentation For The Replacement Of The Roof Covering - Building No. 20 In The Military Complex At Ul. Thursdays 3 In Grudziądz, In Accordance With The Requirements Specified In The Contract And A Detailed Description Of The Subject Of The Order And Its Scope Included In The Technical Specification For The Execution And Acceptance Of Works (Stwiorb) And Design Documentation Including The Bill Of Quantities. Scope Of The Subject Of The Order: ►Construction Works: - Disassembly Of The Existing Roofing Roofing Made Of Roofing Felt And Onduline Corrugated Boards - Disassembly Of Formwork - Dismantling Of Gutters And Downpipes - Renovation Of External Wooden Elements In The Eaves As Well As In The Half-Timbered Wall - Maintenance Of The Existing Roof Truss With Mold And Fungicide Preparations - Strengthening The Existing Roof Truss - Gentle Dismantling Of Chimneys While Preserving The Existing Material That Needs To Be Rebuilt And The Chimneys Restored To Their Original Condition - Cleaning The Wooden Attic Ceiling Of Garbage And Debris - Laying A Vapor-Proof Foil On The Plaster Ceiling - Laying 25 Cm Thick Mineral Wool In Two Layers Of 20 Cm And 5 Cm On The Ceiling Between The Rafters With A Thickness 15 Cm - Laying A 1.0 M Wide Circulation Route Made Of Dismantled Boards - Verification Of The Technical Condition Of The Supporting Structure Of The Roof And Possible Strengthening - Laying A New Layer Of Roofing Felt Or Membrane On The Full Formwork - Laying Battens And Counter-Battens - Performing Sheet Metal Flashings In The Color Of The Roof Tiles - Laying A New Ceramic Plain Tile Roof Tiles In A Lace Pattern - Installation Of Wind Beams Made Of Boards On The Gable Walls - Installation Of New Gutters And Downpipes - Installation Of A New Roof Hatch - Installation Of Snow Ladders In The Color Of The Roof Tiles - Installation Of Steps And A Chimney Sweep Shelf - Renewal Of The Paint Coating On The Wooden Elements Of The Half-Timbered Wall - Inventory Existing Lightning Protection Installation - Disassembly Of The Existing Lightning Protection Installation - Implementation Of A New Instantization For The Above-Mentioned Scope In Accordance With The Applicable Pn-En 62305 Standard And The Nf C17 - 102 (09/2011) Standard, Including Collection Devices, Discharge Wires, Vertical Earthing Electrodes, Discharge Counter And Tester Interfaces - Immersion Of Additional Vertical Earthing Electrodes (2 Sets) - Protection Guidelines Overvoltage In Connection With The Adaptation Of Facilities To Comprehensive Lightning Protection Using The Applicable Standard Pn-En 62305 - Installation Of Apparatus, Devices And Installation Accessories In Accordance With The Documentation, Together With The Transport And Storage Of Materials, Preparation Of The Ground And Accompanying Works. - Removal And Disposal Of Waste.► The Scope Of The Works Also Includes The Execution Of Accompanying Works Consisting In Lighting The Work Area, Securing The Work Area With Warning Signs, Handrails, Bridges, Canopies And Protections On The Work Site, Fencing The Work Stages, Constructing And Maintaining Construction Facilities, Marking And Securing Installations And Devices On The Site Robot. The Above Is Carried Out By The Contractor With His Own Efforts And At The Price Of The Contract. The Area And Buildings Of The Military Complex At Ul. Thursdays 3 Are Included In The Register Of Immovable Monuments Of The Provincial Office For The Protection Of Monuments In Toruń As The Grudziądz Fortress. The Building In The Scope Of Which The Works Will Be Performed Will Be Open For The Duration Of Their Execution, With The Exception Of The Part Of The Building Where The Works Will Be Performed. All Construction Works Should Be Organized And Carried Out In Such A Way As To Ensure Safety For People Staying In The Complex And Building And Uninterrupted Use Of The Building And The Area Around It. ►The Contractors Remuneration For The Execution Of The Subject Of The Order Is Determined In A Cost Estimate, According To The Price Indicated In The Contractors Offer. ► The Contractor Provides All Materials And Equipment Necessary To Perform The Subject Of The Order On Its Own And At Its Own Expense And Is Obliged To Use Construction Products Consistent With The Technical Specification For The Execution And Acceptance Of Works And Permitted For Use By The Act Of July 7, 1994 Construction Law ( Journal Of Laws Of 2023, Item 682, Consolidated Text), With Current Approvals And Certificates Allowing Their Use. ► The Materials Used To Complete The Subject Of The Order May Not Reduce The Utility And Quality Value Of The Completed Order Elements Or Negatively Affect The Durability, Functionality, Aesthetics And Safety Of Use And Enjoyment Of The Work Area And Its Boundaries. If A Trademark, Patent, Origin Is Indicated In The Description Of The Subject Of The Order - It Should Be Assumed That The Indicated Trademarks, Patents, Origin Determine The Technical, Operational And Utility Parameters, Which Means That The Ordering Party Allows Solutions Equivalent To Those Described (Legal Basis: Art. 99 And 101 Of The Act) Provided That The Technical Parameters/Physical And Chemical Composition Of The Offered Equivalent Products Guarantee The Final Effect Required By The Ordering Party, Identical To The Original Product. In The Scope Of The Lightning Protection Installation, The Ordering Party Will Consider That The Offered Solutions Equivalent To The Products As Below Meet The Ordering Partys Requirements Indicated In The Description Of The Subject Of The Order ( Specified In Terms Of Type, Model, Manufacturers Name), If The Contractor Demonstrates In The Offer That They Will Meet The Following Technical Conditions: 1) Lightning Arrester Head• With Early Leader Emission (Pda)• Compliant With The Nf 617-102 (2011-09) Standards; Pn En 62561-1 (2017-07),• Time Advance 60 Μs,• Protection Level Iii,• Protection Radius Min. 39 M,• Height Of The Lightning Rod Above The Protected Elements (Required H≥ 2 M),• Equipped With A Testable System Enabling Checking The Technical Condition, Including Electrical Parameters, Without The Need To Dismantle It And Recording Discharges2) Connecting Equipment For The Lightning Protection System (Connectors, Holders)• Product Made Of Galvanized Steel3) Control Connector Housing• Control And Measurement Well, Sealed, To Be Embedded In Hardened Ground With A Control Connector (Set)4) Lightning Protection Warning Sign• Required Graphic Sign And Text Informing About The Need To Maintain A Distance Of 3 M From The Lightning Conductor During Storm. A Contractor Who Relies On Solutions Equivalent To Those Described By The Ordering Party Is Obliged To Demonstrate (At The Stage Of Submitting The Offer) That The Materials Or Products Offered By Him For The Execution Of The Subject Of The Order Meet The Requirements Specified By The Ordering Party (Legal Basis: Article 99 Of The Act) By Submitting Technical Description And Providing The Name Of The Product And Manufacturer. And The Standards Proposed To An Equivalent Extent Ensure The Requirements Specified In The Description Of The Subject Of The Order. Moreover, The Ordering Party Allows Equivalent Solutions In The Scope Of The Standards Referred To In The Description Of The Subject Of The Order, Provided That The Contractor Who Proposes Solutions Equivalent To Those Described By Means Of The Standards In The Offer Proves, In Particular By Means Of The Said Standards Means Of Proof (I.E. Indication Of An Equivalent Standard Or Submission Of A Document Showing The Proposed Equivalent Solution) That The Proposed Solutions Meet The Requirements Specified In The Description Of The Subject Of The Contract To An Equivalent Extent. If The Contractor Does Not Submit Information On The Use Of Equivalent Materials/Standards With The Offer It Is Assumed That The Price Calculation Includes The Materials Indicated In The Documentation Constituting Annex No. 1 To The Swz And Annex No. 2 To The Swz. ►The Contractor Is Obliged To Perform The Works In Accordance With Construction Practice And Construction Standards, Applicable Technical And Technological Regulations And Standards, While Maintaining The Applicable Occupational Health And Safety Regulations.► The Transport Of All Materials And Equipment To The Work Site And Their Operation Are The Responsibility Of The Contractor. ► The Contractor Is Obliged To Ensure The Removal And Disposal Of Waste (Garbage, Debris, Etc.) On Its Own In Accordance With Applicable Law, In Particular The Waste Act (Article 3(1)(32) Of The Waste Act Of December 14, 2012, Journal Of Laws Of 2023, Item 1587, As Amended) And Documenting These Activities. If The Contractor Uses A Subcontractor In The Above Scope, He Should Indicate The Subcontractor Along With The Offer. If The Contractor Does Not Indicate Entrusting The Removal And Disposal To A Subcontractor, The Ordering Party Will Assume That The Contractor Will Perform The Scope In Question Independently And Has All The Rights In This Respect In Accordance With Applicable Law. ► The Contractor Is Obliged To Collect And Dispose Of Scrap Obtained During Construction Works. Scrap Obtained From Ongoing Disassembly Should Be Immediately Weighed In The Presence Of The Ordering Partys Supervisory Inspector. Removal Of Scrap From The Construction Site Will Be Possible After Written Notification And Acceptance Of The Document By The Supervision Inspector. Each Removal And Reweighing Will Prepare A Quantitative Summary Of The Scrap Obtained From Dismantling, Indicating The Type Criterion (Steel, Cast Iron, Copper, Brass, Aluminum Scrap). The Value Of Scrap Will Be Determined As Follows: Quantity Of Kg Of Steel Scrap X Pln 0.90/Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship); Quantity Of Kg Of Iron Scrap X Pln 1.31/Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship); Quantity Kg Of Non-Ferrous Scrap (Brass) X Pln 16.83/Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship); Quantity Kg Of Non-Ferrous Scrap (Copper) X Pln 29.26/Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship); Quantity Kg Of Aluminum Scrap X Pln 5.53/Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship);►. The Ordering Party Requires The Contractor Or Subcontractor To Employ, Under An Employment Contract, Persons Carrying Out Roof Renovation - The Performance Of These Activities Involves Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2023, Item 1465). The Contractor Or Subcontractor Is Obliged To Employ People Under An Employment Contract At Least For The Duration Of The Contract Concluded Between The Contractor And The Ordering Party - Art. 95 Of The Public Procurement Law
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d75a45c2-39c4-453c-97ad-ffc0eb55e13d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.