GTR 71635741
Tenders Are Invited For Comprehensive Program For Improving Transport Accessibility Of The Areas Of The Western Housing Estate, Stage Iv - Demolition Of Banacha And Grechety Streets Task Of The Inv. Expansion Of Roads And Lighting In The Zachód Residential District In Słupsk.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
71635741
Tendering Authority
Subscribe to view
Tender No
ZP.261.40.2023.ZP3
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Comprehensive Program For Improving Transport Accessibility Of The Areas Of The Western Housing Estate, Stage Iv - Demolition Of Banacha And Grechety Streets Task Of The Inv. Expansion Of Roads And Lighting In The Zachód Residential District In Słupsk.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
06-11-2023
Closed
Work Detail
1. The Subject Of The Order Are Construction Works Covering The Expansion Of Two Municipal Roads, Including: 1) Stefana Banacha Street (Road No. 116005G) On The Section From Ul. Braileˊa To The Intersection With Ul. R. Riedel, In The Scope Of: A) Construction/Reconstruction Of A Road Structure With An Asphalt Concrete Surface, 5.50 M Wide, With Raised Intersections, B) Construction Of A One-Sided Sidewalk, C) Construction Of A Road For Pedestrians And Bicycles, D) Construction Of A Road Section For Bicycles With A Bituminous Surface, E) Reconstruction Of Exits, F) Construction Of Bus Stop Platforms, G) Construction/Reconstruction Of The Road Drainage System, Along With The Construction Of An Open Retention Reservoir On Plot No. 121/1 (Without A Separator), At The Intersection With Ul. Zauchy,H) Construction And Reconstruction Of Road Lighting, I) Construction Of A Service Channel,J) Reconstruction Of Conflicts Between Existing Networks And New Road Infrastructure,K) Cutting Down Trees And Bushes, Replanting Trees And Developing Greenery,L) Making And Installing Road Markings,M) Purchase And Installation Of Bus Shelters With Lighting, 2) Marek Grechuta Street (Road No. 116345G) Along The Entire Length, I.E. From Ul. S. Banacha To Ul. 3-Go Maja, In The Scope Of: A) Construction Of A Road Structure With An Asphalt Concrete Road Surface, B) Construction/Reconstruction Of The Intersection With Aleja 3 Maja, Into A Roundabout-Type Intersection, C) Construction Of A Sidewalk On Both Sides, D) Construction Of A Road For Bicycles With A Surface Bitumen, E) Reconstruction Of Exits, F) Reconstruction/Construction Of A Road Drainage System, G) Construction And Reconstruction Of Road Lighting, H) Reconstruction Of Collisions Of Existing Networks With New Road Infrastructure, I) Construction Of A Technological Canal, J) Cutting Down Trees And Bushes And Development Of Greenery ,K) Execution And Installation Of Road Markings.3) The Scope Of The Order Includes The Following Activities: A) Resulting From The Decision On Environmental Conditions For A Project That May Potentially Have A Significant Impact On The Environment Regarding Monitoring Of The Construction By A Naturalist (Herpetologist, Ornithologist Specialist), Documented By Appropriate Entries In The Construction Log, B) Developing A Traffic Organization Project For The Duration Of The Works, Obtaining The Required Opinions And Approval And Implementing It For The Duration Of The Works, C) Performing An As-Built Geodetic Inventory, D) Preparing A List Of The Lengths And Areas Of The Built And Reconstructed Individual Infrastructure Elements Road, E) Performance Of Any Other Accompanying Works Necessary To Implement The Subject Of The Order, In Particular Specified In The Design Documentation, Technical Specification For The Execution And Acceptance Of Works And In The Bills Of Quantities.2. Attention! The Following Should Be Included In The Valuation: 1) Retention Reservoir A) Reservoir At The Intersection Of Ul. Zauchy And Banacha Will Be Constructed Using The Technology Indicated In The Design Documentation (Land Development Project Entitled Construction Of A Rainwater Drainage System Under The Topic Entitled Expansion Of Banacha Street...) Without The Construction Of A Separator, Taking Into Account The Use Of Openwork Slabs, In The Range Of 0.6 M - 1, 0M Depth. The Remaining Part Of The Slope Will Be Lined With Openwork Slabs Placed Every Second Time, The Spaces Between The Slabs And In The Slabs Will Be Filled With Topsoil And Planted With Plants Listed In The Offer Cost Estimate, In Accordance With The Instructions Of The Inspector/Representative Of The Ordering Party. A Fence Should Be Built Around The Tank, Approximately 104.0 M Long, With A 1.0 M Wide Gate. B) The Following Should Be Planted Around The Fence: Vines, Shrubs And Perennials, Listed In The Offer Cost Estimate, In Accordance With The Instructions Of The Inspector/Representative Of The Ordering Party.2) Widening The Street Riedla: During The Demolition Of The Existing Surface Of The Street. Banacha Made Of Pozbet Boards, In Order To Minimize Difficulties And Increase The Safety Of Road And Pedestrian Communication, The Section Of The Street Should Be Widened. Riedel, 1.5 M Wide, Made Of Slabs Obtained From The Demolition Of Ul. Banach. The Remaining Boards, After Qualifying For Suitability, Should Be Placed In The Place Indicated By The Ordering Party. 3) Road Lighting: When Constructing Lighting, Luminaires Should Be Used Whose Control System Is Compatible With The Reva Siled - Siled Cms Control System Used By Zim In Słupsk. Before Acceptance, The Ordering Party Will Test The Functionality Of The Control Of The New Luminaires In The Scope Of Functions Specified In The Electrical Industry, 4) Bus Shelters: It Is Assumed That 6 Pieces Of Standard 3-Module Shelters Will Be Installed, Including 4 Standard Pieces And 2 Narrow Pieces, With The Following Characteristics: A) Height Total Usable Space Counted From The Ground To The Roof Structure 2.3 - 2.5 M, B) Width: 3 Modules From 4.00 M To 4.40 M, Depth: Standard Shelters From 1.40 M To 1.6 M, Narrow Shelter From 0.40 M To 0.55 M, C) Self-Supporting (Cantilever) Structure, Hot-Dip Galvanized, Without Front Posts, D) Roof Structure Based On Galvanized Steel Beams And, Depending On The Length Of The Shelter, Consisting Of Three Panels Made Of Tempered Milk Glass, Thickness: Min. 8 Mm, Flat Single-Pitch Roof With A Slope Towards The Rear Of The Shelter, E) Powder-Coated In Gray Aluminum (Ral 9007), F) Rear And Side Walls Of The Shelter Made Of Tempered Glass With A Thickness Of Min. 8 Mm, G) Seats With An Inclined Backrest Made Of Oak Wood With Air-Dry Humidity, Varnished Three Times With Waterproof Varnish, Min. Length 2/3 Of The Width Of The Shelter, Mounted At A Height Of 45 Cm From The Pavement (Including The Seat),H) The Shelter At The Front, On A Boom From The Roof, Equipped With A D-15 Reflective Road Sign With Type Ii Foil In Mini Size,I) The Shelter Must Be Connected To The Power Grid Built As Part Of The Lighting Task, Equipped With A Power Supply, D01 Protection And An Astronomical Clock, Led Backlighting Of The Shelter (Led Strip, Min. 120 Diodes/M, Smd 5050 Or Equivalent Luminous Flux) Ensuring Illumination Of The Entire Interior, Lighting And Power Supply Devices Should Be Protected Against Acts Of Vandalism And External Factors With Ip55 Tightness And Overvoltages,J) Shelter Powered By The Street Lighting Power Grid Or A Dedicated Connection, Lighting Switched On After Dark,K) Shelter Equipped With: Waste Bin With A Capacity Of 60 Liters Made Of Corrosion-Resistant Steel, Timetable Box: Illuminated From The Top And Bottom Over The Entire Width In Led Technology (Led Strip, Min. 60 Diodes/M, Smd 3528 Or Equivalent Luminous Flux), Closed With A Lock, Made Of Aluminum In The Color Of The Shelter, Ip54 Tightness, Glazed With Safety Or Tempered Glass, Thickness Min. 4 Mm With A Width Of The Shelter Span And A Height Of Approx. 1200 Mm, Mounted In The Leftmost Rear Module Of The Shelter, Front Panel Mounted On The Front Of The Shelter Roof, 220 Mm High And The Length Of The Shelter Roof, In The Form Of Edge-Lit Plexiglass From The Back With Foil To Scatter Light From The Front A Sticker In Accordance With The Ordering Partys Guidelines Containing The Name Of The Stop And Information About The Lines (Design Enabling The Exchange Of Both Information) L) Graphic Template Of The Passenger Information System Regarding The Name Of The Stop And Information About The Lines - In Accordance With Swzm) Illustrative Design Of A 4.0 M Wide Shelter (Three-Span) - In Accordance With Swz4) Environmental Supervision: As Part Of The Ongoing Expansion Of Banacha And Grechety Streets, The Contractor Will Be Obliged To Comply With And Implement Specific Rules, Activities/Works During The Performance Of Construction Works, In Accordance With The Conditions Specified In Decision No. 2/2022 Of February 15, 2022. On Environmental Conditions For A Project That May Potentially Have A Significant Impact On The Environment, In Particular: A) Monitoring The Construction Site For The Presence Of Animals (Especially Amphibians And Reptiles) And Supervising Their Relocation Outside The Work Site By An Experienced Naturalist With Knowledge And Skills In Identifying Species And Habitats, In In Particular Those Covered By Protection, Documented By Entries In The Construction Log, B) During Excavation, To Temporarily Secure The Work Site With A Herpetological Mesh Fence (Plastic Mesh With A Fine Mesh, 80 Cm High, Resistant To Weather Conditions).3. The Contractor Will Take Into Account That During The Works, Works Related To The Construction/Reconstruction Of The Water And Sewage Network In Banacha And Grechuta Streets Are Planned To Be Carried Out Simultaneously, To Be Carried Out By Wodociągi Słupsk Sp. Z O. O. For The Duration Of The Contract, The Contractor Will Be Responsible For Coordinating The Works Related To The Expansion Of The Streets In Question And Those Planned To Be Performed By Wodociągi Słupsk Sp. Z O. O. Works Will Be Obliged To Adapt The Work Schedule To The Implementation Of Works Related To The Reconstruction/Expansion Of The Road, However, The Schedule Should Include The Time For The Technological Works Of Network Construction After Dismantling The Pavement Layers, Taking Into Account The Continuity Of Operation Of The Water Supply And Sewage Network, So That Ensure The Supply Of Water With The Required Parameters To Recipients And Ensure The Continuity Of Sewage Collection.4. The Subject Of The Order Was Described In Detail In Accordance With Art. 103 Of The Act Using Design Documentation And Stwiorb, Which Constitute Annexes To The Swz. Pursuant To Art. 101 Section 4 Of The Public Procurement Law, The Ordering Party Allows Solutions Equivalent To Those Described In The Design Documentation, Stwior Using Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law. 5. The Ordering Party Requires The Contractor To Provide A Warranty For The Completed Subject Of The Order For A Period Of Not Less Than 36 Months, Counting From The Date Of Final Acceptance Of The Works. The Warranty Period For The Completed Subject Of The Order Is One Of The Criteria For Evaluating Offers And Will Be Assessed In Accordance With The Principles Specified In Swz.6. The Ordering Party Requires The Contractor To Provide A Warranty For The Completed Subject Of This Order For A Period Of 60 Months From The Date Of Final Acceptance Of The Works.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1120c667-9ec9-40dc-9b9a-495818a56683.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)