Drilling And Geophysics. Examinations 1 - 6 E Ern Str. 5903 Pegnitztal. Drilling And Geophysics. Investigations 1 6 E Ern Str. 5903 Pegnitztal Subsoil Investigations Using Direct And Indirect Exploration Methods And Carrying Out Geophysical Measurements As Well As The Expansion Of Groundwater Measuring Points Outside The Danger Area At The E s Km 38,321 / Km 41,467 / Km 42,151 / Km 42,671 / Km 50,029 And Km 50,375, Along The Railway Line 5309 Nuremberg - Schirnding. The Samples And Drill Cores Obtained Must Be Transported And Stored In The Sample Storage Provided. In Addition, Survey Work Of The Exploration Points, Explosive Ordnance Clearance Measurements At E Km 41.467 And E Km 50.029 And Sampling And Declaration Analysis Must Be Carried Out And A Construction Site Clearance Must Be Carried Out. The Following Direct Digestion Types Are Intended: Core Drilling With Continuous Collection Of Cored Samples (Bk / Bks)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.