GTR 71424884

Tenders Are Invited For Mon. Construction Of A Sidewalk Along The Municipal Road No. 101929L In The Town Of Płudy, Construction Of A Sidewalk Along The Municipal Road No. 101901L In The Town Of Paszki Duże And Construction Of A Sidewalk Along The Municipal Road No. 101950L In The Town Of Stasinów

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
71424884
Tendering Authority
Subscribe to view
Tender No
I-ZP.271.12.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Mon. Construction Of A Sidewalk Along The Municipal Road No. 101929L In The Town Of Płudy, Construction Of A Sidewalk Along The Municipal Road No. 101901L In The Town Of Paszki Duże And Construction Of A Sidewalk Along The Municipal Road No. 101950L In The Town Of Stasinów
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
31-10-2023 Closed
Work Detail
Construction Of A Sidewalk Along Municipal Road No. 101929L In The Town Of Płudy From Km 0+000 To Km 0+3954.1.4 A Detailed Description Of The Subject Of The Order Can Be Found In Annex No. 7.1, 7.2 And 7.3 To Swz (Technical Documentation) - Regarding Parts I And /Or 2Nd And/Or 3Rd Order. It Consists Of The Following Documents: 1) Technical Design 2) Construction, Orientation 3) Area Development Plan 4) Bill Of Quantities Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Design Documentation About Referred To In Point 4.1.4. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence, During The Implementation Of The Contract, Of Works Not Included In The Bill Of Quantities Or Works In A Larger Quantity Than That Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation Referred To In Point 4.1.4 Regarding Part I And /Or 2Nd And/Or 3Rd Order. In Each Case Of Using Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent Regarding Parts I And/Or Ii And/Or Iii Of The Order.4.1.4 Basic Requirements Regarding The Order: Regarding Parts I And/Or Ii And/Or Iii Order.A) The Warranty Period For The Completed Subject Of The Order Must Be At Least 36 Months, Counted From The Date Of Final Acceptance. Note: Extending The Warranty Period Is One Of The Offer Evaluation Criteria Described In Chapter Xvii Of This Tor B) The Contractor May Not Take Advantage Of Any Obvious Errors Or Omissions In The Design Documentation. If The Contractor Detects Such Errors Or Omissions, It Will Immediately Notify The Ordering Party, Who Will Make The Necessary Changes Or Additions. C) Failure To Report Errors Referred To In Point B) Means That The Contractor Accepts The Bills Of Quantities And Technical Documentation And, By Submitting The Offer, Undertakes To Achieve The Effect Of Implementing The Public Procurement Contract Which Is The Subject Of This Documentation, Expected By The Ordering Party. In Such A Situation, The Contractor Cannot Make Any Claims To The Ordering Party In This Respect. D) The Bill Of Quantities Is An Auxiliary Material For Preparing The Calculation Of The Offer Price And Is Attached To The Swz Solely To Facilitate The Contractors Calculation Of The Offer Price. The Employer Acknowledges That The Contractor Has Taken Into Account All Requirements And Obligations, Whether Specified Or Implied, Contained In All Parts Of The Design Documentation. The Offer Price Must Include All Expenses And Risks Related To The Need To Complete The Subject Of The Order. E) The Ordering Party Requests The Presentation Of A Cost Estimate When Signing The Contract. F) All Materials Used To Complete The Order Must Have The Certificates, Technical Approvals And Permits Required By Law And Must Be In Accordance With Applicable Regulations. In This Respect, Legal Regulations, In Particular The Act Of April 16, 2004 On Construction Products (Consolidated Text: Journal Of Laws Of 2020, Item 215). The Execution Of The Order Must Be Carried Out In Accordance With The Requirements, Including Those Resulting From Applicable Regulations And The Principles Of Construction Art. G) The Contractor, After Completing The Task, Will Submit To The Ordering Party Appropriate Acceptance Protocols, Certificates, Approvals For Built-In Materials, Etc.; H) The Contractor, As Part Of The Implementation, Order Is Obliged To Install An Information Board Regarding The Scope Of Works In Accordance With The Regulation Of The Council Of Ministers Of May 7, 2021. Regarding The Determination Of Information Activities Undertaken By Entities Implementing Tasks Financed Or Co-Financed From The Budget Or State Earmarked Funds (Journal Of Laws Of 2021, Item 953, As Amended). The Contractor Should Consult The Board Template With The Ordering Party Before Making The Board. ) Art. 100 Section 1 Of The Public Procurement Law, Due To The Fact That The Subject Of The Order Will Be Used, Among Others, By: Natural Persons, The Contractor Will Be Obliged To Perform The Contract Concluded In Such A Way As To Enable Persons With Disabilities To Use The Subject Of The Order On An Equal Basis With Other Persons.4.2 Third Party Liability Policy (Concerning Parts I And/Or Ii And/Or Iii Of The Order) The Contractor Undertakes To Be Held Throughout The Entire Period Of Performance Of The Contract, Third Party Liability Insurance For A Guaranteed Sum Not Less Than The Remuneration Resulting From This Contract.4.2.1 Before Handing Over The Construction Site, The Contractor Is Obliged To Submit To The Ordering Party Certified Copies Of The Insurance Policies Referred To In Section 4.24.2.2 In The Event Of Failure By The Contractor To Fulfill The Obligations Referred To In Section 4.2.1, The Ordering Party Will Not Hand Over The Construction Site To The Contractor. 4.2.3 Any Delay In Carrying Out The Works Due To The Reason Referred To In Section 4.2.2, Will Be Charged In Full To The Contractor.4.2.4 The Scope And Conditions Of Insurance Are Subject To Acceptance By The Ordering Party.4.2.5 If The Validity Of The Submitted Third Party Liability Insurance Policy Expires Before The Completion Of The Contract, The Contractor Shall Submit Another One No Later Than 5 Days Before The End Of Validity Of The Policy. Insurance For The Further Period Of The Contract. The Provisions Of Section 4.2.4 Shall Apply Accordingly. 4.2.6 Failure To Submit To The Ordering Party A Copy Of The Insurance Policy Referred To In Section 4.2.1 Or 4.2.5 May Constitute The Basis For The Ordering Party To Withdraw From The Contract Due To The Fault Of The Contractor - Within 30 Days From The Date Of Conclusion Of The Contract. The Subject Of The Order Is The Construction Of A Sidewalk Along A Municipal Road In The Town Of Płudy, Commune. Radzyń Podlaski On Plot No. 70/11, Płudy District, 395 Meters Long. The Task In Question Is Located In The Right-Of-Way Of A Municipal Road Managed By The Radzyń Podlaski Commune. The Sidewalk Under Construction Runs Through The Administrative Areas Of The Radzyń Podlaski Commune, Radzyń County, Lublin Voivodeship And Covers The Right-Of-Way Of Municipal Road No. 101929L. Material Scope: A) Construction Of A Bed For The Layers Construction B) Construction Of The Sidewalks Structural Layers C) Construction Of Horizontal And Vertical Markings
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
232278c3-7479-409c-8358-0a475e28b496.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders