GTR 71308554

Tenders Are Invited For Construction Of A Sports And Recreation Center In Zabłudowo As Part Of The Government Fund Polish Order - Strategic Investment Program

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
71308554
Tendering Authority
Subscribe to view
Tender No
ZP.271.23.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Sports And Recreation Center In Zabłudowo As Part Of The Government Fund Polish Order - Strategic Investment Program
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
30-10-2023 Closed
Work Detail
Task 1 Will Be Implemented On Plots With Geod. No. 106/1, 106/2, 107/4, 113/5 Within The City Of Zabłudów, Commune. Zabłudów And On Plots With Geod. No. 220, 266, 267, 268, 269 Within Zabłudy Kolonia. The Subject Of The Order For Task 1 Includes: - Stage I: 1) Development Of Multi-Discipline Design Documentation Along With A Work Schedule In Accordance With The Ffu Constituting Annex No. 10 To Swz, Act Of July 7, 1994 - Construction Law (Journal Of Laws Of 2023, Item 682, As Amended), By Regulation Of The Minister Of Development And Technology Of December 20, 2021. On The Technical Conditions To Be Met By Buildings And Their Location (Journal Of Laws Of 2022, Item 1225), Regulation Of The Minister Of Infrastructure Of September 2, 2004 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Of 2021, Item 2454) And Polish Standards Relating To The Subject Of The Order. The Schedule Should Be Divided Into Stages. 2) The Contractor Is Obliged To Develop Multi-Discipline Design Documentation Consisting Of Plans, Drawings, Bills Of Quantities Or Other Documents Enabling A Clear Determination Of The Type And Scope Of Basic Construction Works As Well As The Conditions And Exact Location Of Their Implementation, Bill Of Quantities And Designs, Permits, Arrangements And Opinions Required By Separate Regulations. . 3) The Contractor Is Obliged To Submit For Approval Within 14 Days Of Signing The Contract With The Ordering Party A Material And Financial Schedule Specifying The Dates Of Completion Of Individual Stages Of Work. 4) In The Event Of Any Comments Indicated By The Ordering Party, The Contractor Undertakes To Include Them In The Design Documentation And Work Schedule And Submit Them Again To The Ordering Party, Pending Written Approval. The Deadline For The Contractor To Take Into Account The Comments Submitted By The Ordering Party Will Be Set In Consultation With The Contractor. 5) Written Approval Of The Design Documentation Along With The Work Schedule Begins The Second Stage, I.E. Implementation Of Construction Works. The Design Documentation Should Be Prepared In 4 Copies In Paper Version And 1 Copy In Electronic Version.6) The Contractor Is Obliged To Obtain All Legally Required Permits, Arrangements, Notifications, Permits And Others Required For The Proper Implementation Of The Subject Of The Order. 7) Design Documentation Should Be Prepared Taking Into Account The Requirements Regarding Accessibility For Disabled People Or Design For All Users. 8) Obtaining By The Contractor For The Ordering Party A Valid Decision On A Building Permit And Any Other Administrative Decisions, Arrangements And Opinions Necessary For The Proper Implementation Of The Task Investment, Including Agreeing The Design Documentation With The Polish Athletics Association And The Polish Football Association.9) Exercising Authors Supervision Over The Prepared Documentation By The Contractor From The Moment Of Obtaining The Construction Permit, Throughout The Entire Investment Implementation Period Until The Signing Of The Final Protocol On The Completion Of Construction Works. 10) The Above-Mentioned Scope Of The Designed Construction Works Is Not A Closed Catalog And May Be Changed Depending On The Design Solutions Adopted By The Contractor. Depending On Further Arrangements, The Administrative And Sports Building May Be Demolished Or Incorporated Into The Construction Of A New Facility And Existing Buildings.11) The Area Of ​​The Construction Project Is Under Conservation Protection. - Stage Ii: Execution Of Construction And Assembly Works, Together With The Necessary Accompanying Infrastructure Based On Design Documentation Consisting In Particular Of: 1) Demolition Works (Existing School Playground With An Asphalt Surface And Dimensions Of Approx. 60X30 M With A Mesh Fence Up To 4 M High, Wooden Fence Of The Plot On Which The Management Board Building Is Located, Seats (Bleachers) ) At The Football Stadium) And After Consultation, It Will Be Possible To Demolish The Existing Administrative And Sports Buildings; 2) Reconstruction Of The Football Stadium With A Natural Grass Surface, Drainage To Absorb Rainwater; 3) Construction Of Covered Stands At The Football Stadium; 4) Construction Of A Multi-Purpose Sports Field, I.E. For Volleyball, Basketball And Handball, With A Surface That Is Healthy And Safe For Users; 5) Construction Of A Straight Track With A Surface That Is Healthy And Safe For Users; 6) Construction Of Long Jump And Triple Jump Jumps;7) Construction Of Ball Catchers Multi-Purpose Pitch And Football Stadium;8) Construction Of A Fence For The Football Stadium And Multi-Purpose Pitch;9) Construction Of Access Roads And Access Roads;10) Construction Of Linear Drainage For The Multi-Purpose Pitch;11) Construction Of Irrigation For The Football Stadium With A Water Connection;12) Construction Of Lighting For The Stadium And Multi-Purpose Pitch With An Energy Connection;13) Construction Of A Skatepark With Equipment;14) Construction And Reconstruction Of An Existing Administration And Sports Building, I.E. Construction, Sanitary Works With Mechanical Ventilation And Air Conditioning, Electrical Works, Construction Of An External Sanitary Sewage System, Photovoltaic Installation And Heat Pump; The Building Would Contain The Following Rooms: A) A Training Room With A Kitchenette, B) A Gymnasium, E.G. For Pilates, Zumba Or Ballet Exercises, C) A Utility Room For Storing Sports Equipment, D) Cloakroom Complexes, E) Public Toilets And Toilets For A Disabled Person, F) Office Rooms, Including: Judges Room, Club Presidents Office, G) Auxiliary And Technical Rooms, 15) Delivery And Installation Of Sports Equipment For A Multi-Purpose Pitch And Football Stadium, Including Benches And Waste Bins; 16) Construction Of A Video Monitoring Network For The Area And In The Administration And Sports Building; 17 ) Low Plantings Next To The Administrative And Sports Building;18) Accompanying Works: A) Fencing And Securing The Construction Site; B) Creating Construction Facilities Necessary For The Proper Implementation Of Construction Works; C) Dismantling And Handing Over To The Ordering Party Sports Equipment Located On The Investment Site; D) Surveying Determination Of Height Elevations And Delineation Of Facilities; E) Removal Of Topsoil Layer/Non-Construction Embankments; F) Earthworks, Foundation Excavations, Etc. G) Tidying Up The Work Area, Waste Disposal. 19) Preparing As-Built Documentation And Obtaining All Permits For The Use Of The Facility On Behalf Of The Ordering Party.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
3c23ae26-3d7b-4747-855e-4ea2eb6427cf.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders