GTR 71123574
Tenders Are Invited For Reconstruction Of The Municipal Road In Solec
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
71123574
Tendering Authority
Subscribe to view
Tender No
ZAP.271.29.2023.ASK
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Municipal Road In Solec
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
26-10-2023
Closed
Work Detail
The Subject Of The Order Is The Implementation Of An Investment Project Called Reconstruction Of The Municipal Road In Solec. The Task In Question Includes Works On A Section With A Length Of L = 1370 M From Ul. Zaleśna [Km 0+000] To The Vicinity Of Ul. Chabrowa [Km 1+370] With A Road Width Of 5.50 M, Including: 1) Preparatory Works: A) Mowing The Roadsides (5493.68 M2) B) Cutting The Roadsides (5493.68 M2); 2) Demolition Works: A) Cutting The Surface ( 22.5 M);B) Demolition Of Curbs (131.5 M) C) Demolition Of Edges (20.0 M)3) Replacement Of The Substructure: A) Cutting The Surface (452 M); B) Milling Of The Bituminous Surface (1824.5 M2); C) Execution Troughs With A Depth Of 40 Cm (1824.5 M2) D) Soil Stabilization With C1.5/2 Cement (1824.5 M2); E) Construction Of The Lower Foundation Layer Of Aggregate (1824.5 M2) F) Construction Of The Upper Foundation Layer (1824.5 M2); 4) Benches, Curbs: A) Making C12/15 Concrete Benches With Resistance (206 M3) B) Setting 15X30 Curbs In The Clear View (1382.84 M) C) Setting 12X24 Resistors (1364 M) 5) Surface: A) Adjusting Sewer Manhole Covers (39 Pcs.)B) Milling Of The Bituminous Surface (1717.794M2)C) Leveling The Existing Surface With A Mixture Of Min. - Bit. In The Amount Of 0.1Mg/M2 (264.267Mg);D) Laying The Binding Layer Ac11w50/70 With An Average Thickness Of 5Cm (7550.48M2);E) Laying A Mesh Of Glass-Carbon Fibers Pre-Filtered With Asphalt (7550.48M2);F) Laying The Ac11s50/70 Wearing Course With A Thickness Of 5 Cm (7550.48 M2);6) Finishing Works: A) Paving The Roadsides (3616.26 M2); B) Strengthening The Roadsides With Aggregate (3012.13 M2); C) Moving Small-Sized Elements On The Exits - Regulation Height (512M2). The Contractor Will Organize The Construction Site On His Own, Organize Waste Collection And Disposal, And Clean The Area After The Works Are Completed. Work On Private Plots Will Be Carried Out With Particular Respect For The Property. After Completion Of Construction, The Area Will Be Restored To Its Original Condition, Reclaimed And Sown With Grass. In The Event Of Any Damage To Fences, Entrances Or Any Other Elements, The Damage Will Be Removed Before The Task Is Completed. During Construction, Access To The Property Will Be Guaranteed, And Existing Trees And Shrubs That Are Not Scheduled For Cutting Will Be Properly Protected Against Damage. The Scope Includes The Development Of A Temporary Traffic Organization Project, Comprehensive Geodetic Services, Development Of Complete As-Built Documentation Along With An As-Built Geodetic Inventory In 2 Copies (And, If Necessary, With Prior Changes To The Zud). The Bill Of Quantities Constitutes Auxiliary Material. The Contractors Offer Should Include All Costs Associated With Performing The Task. Common Procurement Vocabulary: 45.23.30.00 - 945.23.32.23 - 8 A Detailed Description Of The Subject Of The Order, As Well As A Description Of The Ordering Partys Requirements In Relation To The Implementation Of The Subject Of The Order And Its Acceptance, Are Specified In The Technical Documentation (Annex No. 10 To The Swz) And The Draft Provisions Of The Contract (Annex No. 6 To Swz). A. Due To The Entry Into Force Of The Act Of April 16, 2004 On Construction Products (Consolidated Text: Journal Of Laws Of 2020, Item 215, As Amended), Changes In The Provisions Of The Construction Law Act (Consolidated Text: Journal Of Laws Of 2020, Item 215, As Amended). Of 2020, Item 1333, As Amended) And Regulation (Eu) No. 305/2011 Of The European Parliament And Of The Council Of 9 March 2011 Laying Down Harmonized Conditions For The Placing On The Market Of Construction Products And Repealing Council Directive 89/106/Eec (As Amended). Of 21 December 1988 On The Approximation Of The Laws, Regulations And Administrative Provisions Of The Member States Relating To Construction Products) In Full Force From 1 July 2013 And Determining The Conditions For The Placing On The Market And Making Available On The Market Of Construction Products, By Establishing Harmonized Rules For Implementing The Performance Properties Of Construction Products And The Ce Marking On These Products. The Ordering Party Requires That The Products/Materials Used To Perform The Order: A) Have The Mandatory Ce Marking, Falling Within The Scope Of The Harmonized Technical Specification (I.E. Harmonized Standards - Hen, And European Edo Assessment Documents) - So Far Optional, B) Had A Declaration Of Product Performance, Which Binds The Manufacturer In The Scope Of The Product Performance Properties Selected By Him From The Standard, Related To Its Specific Use, Which Is Declared By This Manufacturer, Obligation To Prepare A Declaration Of Product Properties For Ce Marked Products And To Provide It With Each Product Made Available On The Market (Together With The Product/Material For The Construction Site), C) For Materials Not Covered By Harmonization, They Should Be Marked With The B Sign. B. The Order Will Be Implemented In Accordance With Polish Law, In Particular The Act Of July 7, 1994 - Construction Law (Consolidated Text: Journal Of Laws Of 2020, Item 1333, As Amended). The Contractor Must Ensure That The Works Are Performed In Accordance With The Law, In Particular With Technical And Construction Regulations, Regulations Regarding Independent Technical Functions In Construction And Regulations Regarding Products And Materials Used In Construction. C. The Contract That Will Be Concluded For The Purpose Of Implementing The Order In Question Provides For A Lump Sum Remuneration Based On The Selection Of The Most Advantageous Offer, The Price Of Which Results From The Offer Presented By The Contractor. D. The Ordering Party Allows The Execution Of The Subject Of The Order With The Participation Of Subcontractors. E. The Ordering Party Requests That The Offer Indicate The Parts Of The Order Whose Performance The Contractor Intends To Entrust To Subcontractors. F. The Required Warranty Period For The Works And Materials Of The Device Will Be At Least 36 Months From The Date Of Signing (Without Comments) Of The Final Acceptance Protocol. G. After Completing The Works, The Contractor Is Obliged To Tidy Up The Construction Site And Hand It Over To The Ordering Party Before The Deadline For Completing The Works. H. The Ordering Party Specifies The Provisions And Requirements For Subcontracting Agreements In The Draft Agreement - Annex No. 6 To The Swz. I. Settlements Between The Ordering Party And The Contractor Will Be Made In Polish Zlotys (Pln). J. The Contractor Is Fully Liable - Both Towards The Ordering Party And Towards Third Parties - For Damages And Other Events Arising In Connection With The Performance Of Works Falling Within The Scope Of The Subject Matter Of The Contract, In Particular For The Loss Of Material Goods, Bodily Injury Or Death Of Persons. If The Technical Documentation Would Indicate Trademarks, Patents Or Origin In Relation To Certain Materials Or Devices - The Ordering Party, In Accordance With Art. 99 Section 5 Of The Public Procurement Law, Allows Offering Equivalent Solutions. Materials Or Devices From Specific Manufacturers Determine The Minimum Quality Parameters And Functional Features That The Materials Or Devices Offered By The Contractor Must Meet In Order To Meet The Requirements Set By The Ordering Party. Materials Or Devices From Specific Manufacturers Constitute Only A Quality Standard Of The Subject Of The Order. The Use Of Exemplary Manufacturers Names Is Therefore Not Intended To Violate Art. 99 Section 4 Of The Public Procurement Law, But Specifying The Level Of Expectations Of The Employer In Relation To A Specific Solution. The Use Of Manufacturer Or Product Names Is For Example Purposes Only. By Indicating The Designation Of A Specific Manufacturer (Supplier) Or A Specific Product In The Description Of The Subject Of The Order, The Ordering Party Also Allows Equivalent Products With Quality Parameters And Functional Features At Least At The Level Of The Indicated Product, Thus Accepting Every Product With The Indicated Or Better Quality Parameters And Functional Features. All Requirements Specified In The Documents Indicated Above Are Minimum Requirements And Their Fulfillment Is Obligatory. Failure To Meet The Above-Mentioned Minimum Requirements Will Result In Rejection Of The Offer As Inconsistent With The Terms Of The Contract Pursuant To Art. 226 Section 1 Point 5 Of The Public Procurement Law.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d53c1204-5833-49ec-a61f-d45a0996daa3.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.