GTR 70987160
Quotation Are Invited For Sand Blasting And Painting Of Ng System Pipings
NCB — National Competitive Bid
Closed
Asia
Tender Information
GTR Reference
70987160
Tendering Authority
Subscribe to view
Tender No
2332302244
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Sand Blasting And Painting Of Ng System Pipings
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
12-10-2023
Closed
Work Detail
Quotation Are Invited For Sand Blasting And Painting Of Ng System Pipings Sand Blasting And Painting Of 1032303649Rfx Description Sand Blasting And Painting Of Ng System Pipings At D-Station Phase-2 Interconnection Ngprs Contact [email protected] Tel: 043226031 / 0504069988 1 Item-00001 12 Of 12# Sand Blasting And Painting Of Ng System Pipings At D-Station Phase-2 Interconnection Ngprs 1.0#Scope Of Work A.#The Scope Includes Site Preparation, Surface Preparation, Application Of Protective Coatings Of Ng System Piping#S In D-Phase 2 Ng Syst Em Interconnection Ngprs, Associated Equipment, Vessels And Piping B.#Supply Of Blasting, Equipment, Tools And Consumables Including Tarpaulin To Cover The Entire Area To Protect The Environment C.#It Covers The General, Environmental, Quality Control And Safety R Equirements For The Surface Preparation And Application Of Coatings, Based On The Nature Of The Service Condition D.#Covering The En Tire Surface With Tarpaulin Or Green Mesh In Order To Protect The Entire Area From Spillover Of Blasting Grit Or Paint E.#Wash Down The Dust And Muck, Surface Preparation & Applying Coating System On The Entire External Surfaces Including Support, Platform And Han Drails F.#Total Removal Of The Existing Coating And Complete Cleaning Of The External Surfaces To Bare Metal By Abrasive Blast Clean Ing To Remove All The Contaminants And To Create Profile G.#Manual Cleaning Using Hand And Power Tools Wherever Necessary H.#Applica Tion Of Complete Coating System That Is Suggested By Bidder And Approved By Dewa And The Coating System Shall Be In Compliance With Existing Coating Systems For All The Components Under This Scope I.#Safety And Stage Wise Inspections And Quality Assurance At Compl Etion Of Each Activities J.#Preparation Of Check Lists And Reports K.#The Bidder Shall Provide Detailed Procedures With Activity Bre Akdown Including Method Statement And Risk Assessment For The Scope Of Work L.#Final Report With All Check Lists # 2.0#Physical Bou Ndary And Volume Of The Contract: A.#Approximate Volume Of Work Consists Of External Surfaces Of Piping As Per List Provided Below, Contractor Must Visit The Site To Understand The Scope Of Work Before Submitting Their Offer ·#10 Inch # 29 Meters ·#04 Inch # 06 M Eters ·#1-1/2 # 10 Meters ·#½ Inch # 16 Meters ·#Manual Valves # 05 Nos ·#Control Valves # 04 Nos ·#Shut-Off Valve # 02 Nos ·#Nrv # 02 Nos ·#Safety Valves # 02 Nos B.#The Contractor Shall Visit The Site Before Quote For Exact Volume Of Work Estimate 3.0#Contrac Tor#S General Responsibilities And Liabilities A.#Site Visit Can Be Made Any Working Day From Sunday To Thursday, Between 07:30 And 14:30 Hours With Prior Appointment From Concerned Department Sr. Manager Of Dewa B.#The Contractor Shall Specify Scaffoldings Requi Rements And Locations. C.#During Scaffolding Erection, Contractor Shall Deploy Their Safety Officer And Supervisor Along With Scaffo Lding Supervisor To Confirm The Required Scaffolding/Access Is In-Line With The Safety Requirements To Safely Carry Out Coating Work S. Scaffolding Shall Be Checked Every Day By The Contractor#S Qualified Inspector And Safety Officer Before Use. Any Observations Sh All Be Immediately Reported To The Dewa Interface Engineer/ Deputy Manager# Contractor Shall Take Responsibility To Obtain Gate Pass Es For The Staff Members, Materials, Vehicles In And Out From Dewa Premises And Permit To Work As Well As Formal Closure And Return The Permit To Work To Dewa.# # Contractor Shall Provide All Required Consumables Such As Abrasives Materials, Sealants, Coatings, Cl Eaning Agents, Application Tools, Inspection And Testing Tools, And All Other Consumable Or Tools Required To Carry Out The Complete Scope Of The Work.# D.#Contractor Shall Provide Appropriate Safety And Protection Equipment For All The Personnel Including First Aid Kit. Transportation Facilities And Site Office Container With Rest Room Shall Be Provided By Contractor As Well.# E.#Contractor Shall Take All Precautions To Avoid Any Damages To The Plant Equipment While Carrying Out The Works. For Any Damages Caused By Contractor To Dewa Property During The Coating Process, Contractor Shall Be Held Liable To Replace Damaged Equipment At His Own Cost.# # F.#Due To Plant Operational Emergencies, Dewa Reserves The Right To Change The Shutdown Schedule With Short Notice, In Such Case Co Ntractor Shall Promptly Clear The Work Area And Revise The Work Implementation Schedule In Consultation With Concerned Dewa Engineer . In This Occurrence Contractor Is Not Entitled To Claim Any Extra Payment From Dewa On Account Of Such Re-Scheduling, Waiting Time Or Delay.# G.#Contractor Shall Work In Accordance With International Codes And Standards At Each Stage Of Works. In All Circumstanc Es, Local Governing Rules Shall Be Adhered To.# # H.#Contractor Shall Complete All Activities Within The Mutually Agreed Outage Sche Dule.# I.#At All Times Contractors# Personnel Must Strictly Adhere To The Safety And Security Procedures Of Dewa During Their Prese Nce And While Working Inside Dewa Premises. # J.#Disposal Of All Kind Of Waste Created During Said Project Like Abrasives, Used Pain T Containers, Rags And All Other Materials By Contractor Shall Be According To Dubai Municipality Rules And Regulation Only. K.#Con Tractor Working On-Site, Mandatorily Have To Adhere To, But Not Limited To, The Following Environment Policies:#- ·#Support Our Int Egrated Management System Policy. ·#Help Us To Achieve Our Environmental Objectives And Targets By Conserving Resources, Energy And Water And By Minimizing Waste Whilst On-Site. ·#Prevent Pollution Wherever Possible. ·#Follow Any Procedure In The Environmental Man Agement System That Is Relevant To Your Activities In Accordance With The Site Managers Instructions. ·#Phase Out The Use Of Ozone Depleting Substances On Our Site. ·#To Comply With Legislative Requirements Of Dubai Municipality At All Times. L.#Contractor To Clear The Site On Daily Basis Before Leaving Site After Day#S Work And Leave The Site In As Is Condition.# M.#In Case The Contracto R#S Time Schedule For The Work Is Found Protracted, Dewa Has The Right To Split And Award The Contract To More Than One Contractor A T Its Discretion. N.#Contractor Have To Commence The Work Within 48 Hours Of Intimation And Shall Complete All The Related Formalit Ies Like Mobilization Of Staff, Tool & Plant Machineries, Gate Pass Etc., Well In Advance For The Work. O.#The Contractor Shall Be R Esponsible For Any Damage To The Equipment Due To Poor Workmanship. Any Damage To The Equipment By The Poor Workmanship, Wrong Handl Ing Etc., The Cost Will Be Recovered From The Contractor. P.#In Spite Of All The Care Taken By The Contractor And His Workmen, If A Ny Of The Plant Items Are Damaged Or Defaced Or Otherwise Made In-Operational By The Contractor#S Men, This Shall Be Forthwith Repor Ted To Dewa Engineer In-Charge Of The Job To Avert Further Damages, Breakdown Or Shutdown Of The Total Plant. 4.0#Qualification Of Bidder A.#The Bidder Shall Have Proven Experience In Abrasive Blast Cleaning, Application Of Protective Coating System, Inspection And Testing In Or Outside Uae In Similar Environment B.#The Bidder Shouldestablish His Previous Experience In Similar Activities E Ither In Dewa Or Outside Dewa C.#The Bidder Shall Have Specialists To Depute A Qualified Coating Inspector (Nace Certified Or Equiva Lent) Who Shall Conduct Inspections And Testing At Every Stage Of The Process At Dewa Premises And Release/Issue Required Clearance Certificates Of Acceptance/Clearance To Dewa. # 5.0#Terimination Of Contract: During The Contract, If The Performance Of The Consul Tant/Contractor Or The Quality Of His Work Is Found Unsatisfactory, Dewa Has The Right To Terminate The Contract 6.0#Site Pre-Requi Sites The Following Are, But Not Limited To, The Minimum Pre-Requisites To Carry Out The Work At Site. A.#Contractor Shall Obtain Entry Permits From Dewa As Per Security Policies For This Works. B.#The Contractor Shall Always Comply With Dewa Rules Regarding Sa Fety & Security Inside Dewa Premises. C.#The Presence Of Contractor#S Manpower Shall Be Restricted To The Worki 1 Job Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332302244
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
9e08be46-d06a-43ed-abe7-451eee243d99.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.