GTR 70782234

Quotation Are Invited For Whrb 53 Tubes And Headers Borescope Inspection

NCB — National Competitive Bid Closed Asia
Tender Information
GTR Reference
70782234
Tendering Authority
Subscribe to view
Tender No
2332302197
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Whrb 53 Tubes And Headers Borescope Inspection
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
06-10-2023 Closed
Work Detail
Quotation Are Invited For Whrb 53 Tubes And Headers Borescope Inspection. Technical And General Specification Of Work At K Stn, Jebel Ali Power Station. 1.#Title: Whrb 53 Tubes And Headers Borescope Insp Ection. 2.#Quantity: Inspection Cap Will Be Cut On Headers By Dewa For Access. Maximum Number Of Accessible Tubes And Headers Sectio N Shall Be Inspected. Refer Below Location Details S.No#Unit#Location#Material.#Qty# 1#Whrb 51#Hp Evaporator#A 106 Gr.B#,12# 2#Whrb 51#Hp Economizer 1&2#A 106 Gr.B#12# 3#Whrb 52#Hp Economizer 1&2#A 106 Gr.B#12# 4#Whrb 52#Hpltsh#A 335 P22#2# 5#Whrb 53#Hphtsh#A 335 P91#1# ##### 3.#Duration: 01 Day 4.#Scope Of Work: 4.1.#Mobilize Team/Equipment Within 02 Days Of Advance Notice. 4.2.#Submit Foll Owing Documents To Obtain Ptw, 4.2.1.#Method Statement 4.2.2.#Risk Assessment Of The Work 4.2.3.#Toolbox Talk Report. 4.3.#Obtain Ptw (Permit To Work), Lc (Line Clearance) & Confine Space Entry Permit From Dewa. 4.4.#Conduct Site Survey And Safety Inspection, To A Ssess The Working Environment. 4.5.#Ensure Site Area Is Correctly Secured And Safe To Work On In All Respects. 4.6.#If The Working E Nvironment Is Safe, Proceed With The Borescope Inspection. 4.7.#Assess The Internal Conditions Of Tubes & Headers. Articulating Bore Scope Shall Be Used To Identify Any Scabbing, Pitting, Scale Build Up, Corrosion, Layer Formation, Overheating And Any Other Signifi Cant Findings. Maximum Number Of Accessible Tubes To Be Inspected On Each Header Check De-Super Heater Nozzle Condition By Borescop E. 4.8.#In Case Of Any Significant Inspection Finding, Same Shall Be Brought To The Notice Of Dewa. 4.9.#Upon Work Completion, Detai Led Inspection Report Shall Submit. Report Shall Include Header/Tube Identification Details, Photos, Videos, Findings, Recommendatio Ns And All Supporting Documents. 4.10.#Digital Copies Of The Photos, Videos, Inspection Findings And Report Shall Submit Through Clo Ud/Cd 4.11.#Dewa Scope Is Only Scaffolding If Required 5.#Borescope Equipment Details: 5.1.#The Borescope Should Be Equipped With Articulation And High-End Industrial Video Systems With Proper Monitors. The Borescope Should Have The Facility / Systems To Get Exc Ellent Quality Image, Detailed Information About A Non-Conformity Like Indications, Discolorations, Pitting, Scabbing, Scale Build U P And Oxygen Corrosion Etc. The Probe Should Be Water Proof, Flexible Which Should Turn Up To 360°, Suitable To Access To Headers & Tubes, Length Of Cable Should Be 30 M, Results Recordable, Dual Or Extra Monitor, And High Quality Of Recording. 6.#General Terms & Conditions: 6.1.#The Contractor Shall Visit The Site And Be Fully Familiar With The Work Scope, Plant Access, Material Requirement, Facilities, Complexities, Safety Measures Etc., Before Submitting The Bid. 6.2.#The Contractor Shall Have The Previous Experience F Or Hrsg Tubes & Headers Borescope Inspection In Dewa Or With Well-Known Company In Uae. 6.3.#The Contractor Shall Submit The Schedul E Of Work And The Period For Work So That The Work Shall Come Well Within The Allotted Outage Period. The Schedule Shall Be Approved By Dewa Before Commencement Of Work 6.4.#The Contractor Shall Ensure Housekeeping On A Daily Basis And The Contractor Shall Be Resp Onsible For All Waste Material Disposals To Designated Places As Per Dewa Environmental Policy Of Hazardous Waste Disposal. 6.5.#All Dewa Safety & Environment Policy, Rules And Regulation Shall Be Followed At Work Site During The Execution Of The Work. The Contrac Tor#S Engineer Should Be Familiar With Safety Regulations While Working In A Hazardous Area. 6.6.#The Work Shall Be Executed Under D Ewa Supervision And As Per Quality / Schedule Requirement. Contractor#S Supervisor Shall Be Available At Site Throughout The Period Of Work. Qty: 1 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332302197
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
88974e03-8c3f-465d-8ca6-1d3bebc6627d.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders