GTR 70696129
Corrigendum - Quotation Are Invited For Supply And Installation Of Compressor In Chiller
NCB — National Competitive Bid
Closed
Asia
Tender Information
GTR Reference
70696129
Tendering Authority
Subscribe to view
Tender No
2412301236
Financer Name
Self-Funded
Work Title
Corrigendum - Quotation Are Invited For Supply And Installation Of Compressor In Chiller
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
03-10-2023
Closed
Work Detail
Quotation Are Invited For Supply And Installation Of Compressor In Chiller Supply And Installation 1032303056Rfx Description Supply And Installation Of Compresor In Chiller-2 @ Mrkd 400 Kv Contact Details For Arranging The Site Visit Are: 1 Item-00001 Overhauling Of Compressor In Accu-4@Ksta Substation Name # Ksta 132Kv Nod Ref: 420426220 Sap Equipment - 30346586 Air Cooled Condens Ing Units Acu (Accu-4) Carrier; Model - 38Ah-104--C900 Accus (Cr) Defects Rectification Works. Circuit-B, Compressor B2 Overhauling ; Defects Rectification Works To Be Performed By The Contractor. Associated Defects Shall Be Rectified By The Contractor. For Ptw Ap Plication, Please Send Mail To: [email protected] For Site Visit, Please Contact: Mr. Thomas (Landline: 04-32 21470 / Mob- 050-161 5464) [email protected] Mr Abdul Rahman ( Landline: 04-32-28322/ Mob0502166717) [email protected] Payment Term S And Conditions: Penalty: The Contractor Shall Complete This Work Within 1 Year Of Po Release Date, If The Work Is Delayed Beyond T Hat Then; Dewa Is Entitled To A Reduction In The Po Value By 1.25% Per Week Of Delay And Subject To Maximum 10% Of Po Value. Retenti On Amount: 5% Of The Total Value Of The Po Will Be Kept As A Retention Amount For 1 Year After The Completion Certificate Is Issued, It Will Be Released To The Contractor Upon Clearing All Related Nods. B. Upon Issue Of Po Whenever Required, Contractor Shall Obtai N The Entry Permit (Permit To Work- Ptw) Approval From Dewa-Tcm Department Separately For Each Of The Substations In The Prescribed Format Prior To Start Any Pm Work. C. All Maintenance Works Shall Be Done In Presence Of Dewa Supervision Staff. D. All Loading, Unl Oading And Shifting Of Materials Related To This Scope Shall Be Under Contractors Scope. E. After Completing The Works Each Time, C Ontractor Shall Perform Necessary Testing In Presence Of Dewa Supervisor/Engineer. F. Contractor Shall Submit Monthly Maintenance Re Port To Dewa-Tam. The Delivery Note, Testing & Commissioning Report, Warranty Certificate, Work Completion Report Along With Po Copy Shall Be Submitted To Dewa-Tam After Successful Completion Of The Work In Every Six Months. Contact Person For Documents Submissio N And For Any Ptw Templates In Dewa-Tam: Mr. Mohammed Azeemuddin (Ph: 04-3221689/ 055-7728480) 2 Item-00001 Defects Parts To Be Replaced @Ksta Substation Name # Ksta 132Kv Nod Ref: 420426220 Sap Equipment - 30346586 Air Cooled Condensing Un Its Acu (Accu-4) Carrier; Model - 38Ah-104--C900 Accus (Cr) Defects 1 Ea 1 Ea Rectification Works. Replacement Of Defective Electrical & Mech Anical Components. Associated Defects Shall Be Rectified By The Contractor. For Ptw Application, Please Send Mail To: [email protected] Ov.Ae For Site Visit, Please Contact: Mr. Thomas (Landline: 04-32 21470 / Mob050-1615464) [email protected] Mr Abdul Rahma N ( Landline: 04-32-28322/ Mob- 0502166717) [email protected] Payment Terms And Conditions: Penalty: The Contractor Shal L Complete This Work Within 1 Year Of Po Release Date, If The Work Is Delayed Beyond That Then; Dewa Is Entitled To A Reduction In T He Po Value By 1.25% Per Week Of Delay And Subject To Maximum 10% Of Po Value. Retention Amount: 5% Of The Total Value Of The Po Wil L Be Kept As A Retention Amount For 1 Year After The Completion Certificate Is Issued, It Will Be Released To The Contractor Upon Cl Earing All Related Nods. B. Upon Issue Of Po Whenever Required, Contractor Shall Obtain The Entry Permit (Permit To Workptw) Appro Val From Dewa-Tcm Department Separately For Each Of The Substations In The Prescribed Format Prior To Start Any Pm Work. C. All Main Tenance Works Shall Be Done In Presence Of Dewa Supervision Staff. D. All Loading, Unloading And Shifting Of Materials Related To Th Is Scope Shall Be Under Contractors Scope. E. After Completing The Works Each Time, Contractor Shall Perform Necessary Testing In P Resence Of Dewa Supervisor/Engineer. F. Contractor Shall Submit Monthly Maintenance Report To Dewa-Tam. The Delivery Note, Testing & Commissioning Report, Warranty Certificate, Work Completion Report Along With Po Copy Shall Be Submitted To Dewa-Tam After Successf Ul Completion Of The Work In Every Six Months. Contact Person For Documents Submission And For Any Ptw Templates In Dewa-Tam: Mr. M Ohammed Azeemuddin (Ph: 04-3221689/ 055-7728480) 3 Item-00001 Rectification Of Ahu4-1 Defects @ Tcgy Brief Scope: Details Of Unit: Air Handling Unit- Dx Type Manufacturer # York Model - Ydm 3 0X40 Serial Number - A 0908 116 Airflow Rate - 2085 Lps Esp - 500 Pa R407c - Replacement Of Defective Bearings Of Blower Assembly. - Associated Defects Shall Be Rectified By The Vendor. Warranty # 1 Year For Workmanship And New Materials Supplied. For Ptw Applic Ation, Please Send Mail To: [email protected] For Site Visit, Please Contact: Mr. Thomas (Landline: 04-32 21470 / Mob- 050-1615464 ) [email protected] Mr Abdul Rahman ( Landline: 04-32-28322/ Mob0502166717) [email protected] Payment Terms An D Conditions: Penalty: The Contractor Shall Complete This Work Within 1 Year Of Po Release Date, If The Work Is Delayed Beyond That Then; Dewa Is Entitled To A Reduction In The Po Value By 1.25% Per Week Of Delay And Subject To Maximum 10% Of Po Value. Retention A Mount: 5% Of The Total Value Of The Po Will Be Kept As A Retention Amount For 1 Year After The Completion Certificate Is Issued, It Will Be Released To The Contractor Upon Clearing All Related Nods. B. Upon Issue Of Po Whenever Required, Contractor Shall Obtain The Entry Permit (Permit To Work- Ptw) Approval From Dewa-Tcm Department Separately For Each Of The Substations In The Prescribed Form At Prior To Start Any Pm Work. C. All Maintenance Works Shall Be Done In Presence Of Dewa Supervision Staff. D. All Loading, Unloadi Ng And Shifting Of Materials Related To This Scope Shall Be Under Contractors Scope. E. After Completing The Works Each Time, Contr Actor Shall Perform Necessary Testing In Presence Of Dewa Supervisor/Engineer. F. Contractor Shall Submit Monthly Maintenance Report To Dewa-Tam. The Delivery Note, Testing & Commissioning Report, Warranty Certificate, Work Completion Report Along With Po Copy Sha Ll Be Submitted To Dewa-Tam After Successful Completion Of The Work In Every Six Months. Contact Person For Documents Submission An D For Any Ptw Templates In Dewa-Tam: Mr. Mohammed Azeemuddin (Ph: 04-3221689/ 055-7728480) 1 Ea Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2412301236
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b33544ea-1847-4ce8-906d-3b7236605bb6.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.