GTR 70690673
Tenders Are Invited For Construction Of A Community Center Building With The Necessary Technical Infrastructure In Masłowice
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
70690673
Tendering Authority
Subscribe to view
Tender No
UG. IOS.271.14.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Community Center Building With The Necessary Technical Infrastructure In Masłowice
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
16-10-2023
Closed
Work Detail
4.1. The Subject Of The Order Are Construction Works As Part Of The Investment Project Titled: Construction Of A Community Center Building With The Necessary Technical Infrastructure In Masłowice For Plot No. 0014 Masłowice. Comprehensive Construction Of A New Building For A Community Center In Masłowice On Part Of The Plot With Registration Number 538/4 Area. 0014 Masłowice. The Designed Building Is A Single-Story Building With A Hipped Roof. The Facility Will Function As An Environmental Community Center. The Construction Of Technical Infrastructure Will Include The Expansion Of The External Water Supply System, Construction Of An Electrical Installation, Construction Of An External Sanitary Sewage System With A Septic Tank For Liquid Waste, Hardening Of The Area, Accesses And A Hardened Area For Solid Waste Containers. For The Investment Project, 10 Parking Spaces For Passenger Cars And Two Parking Spaces For Disabled People Are Planned On The Plot. Characteristic Parameters Of The Facility: - Building Area: 111.88 M2 - Usable Area: 87.12 M2 - Gross Cubic Capacity: 589, 20 M3 - Number Of Above-Ground Floors: 1 - Number Of Underground Floors: 0 - Height Of The Building Above Ground Level: 6.885 M - Height Of Above-Ground Floors (Clear): 3.00 M/2.50 M - Number Of Staircases: 0 - Number Of Entrances To The Building : 1 Main Entrancesthe Expected Scope Of Works Includes: Preparatory Works, Including: Marking The Area Of Works Being Carried Out By Placing Information And Warning Boards On The Property, Preparing The Property Area For Setting Up The Construction Site, If Necessary, Hardening The Green Area For The Installation Of Construction Site Containers, Delivery And Installation Of Construction Facilities On The Property, Connection Of Electricity Supply To Construction Facilities From The Buildings Internal Installation, Connection Of The Water Supply System To Construction Facilities From The Buildings Internal Installation, Separation, Marking And Fencing Of Hazardous Zones, Designation Of A Place For Storing Construction Materials. Earthworks Including; Linear Excavations For The Purpose Of Making Connections, Linear Excavations For Strip Foundations, Spatial Excavations For Foundation Footings, Backfilling Of Excavations, Compaction, Leveling Of The Area. Concrete Works - Execution Of Base And Leveling Layers, Setting Up Formwork, Laying Reinforcement, Laying The Concrete Mixture, Care Concrete, Disassembly Of Formwork, Repair Of Cankers Insulation Works, Including Installation Of Layers Of Thermal And Waterproof Insulation Of Foundation Walls, Installation Of Layers Of Thermal Insulation And Waterproofing Of The Floor On The Ground. Masonry Works - Construction Of Foundation Walls, Construction Of Load-Bearing Walls, Construction Of Partition Walls. Assembly Works - Assembly Of Supporting Steel Structures, Laying Of Hollow Core Slabs. Cladding, Flooring And Plastering Works - Making Base And Leveling Layers, Making Gypsum Studs, Laying Wall Tiles, Laying Floor Tiles. Roofing And Covering Works, Laying Thermally Weldable Felt, Installing Gutters. And Downpipes, Installation Of Sheet Metal Flashings. Painting Works, Painting Of Internal Walls. Glass Works, Installation Of Window Joinery. Facade Works - Building Insulation, Installation Of Steel Consoles For The Ventilated Facade, Installation Of External Window Sills, Execution Of Plastering. Carpentry Works, Installation Of Door Joinery. Installation Of Internal Electrical Installations; Installation Of Telecommunication And Logical Installations, Installation Of A Photovoltaic Installation, Execution Of Wlz, Execution Of Lightning Protection Installations. Accompanying Works And Temporary Works Not Covered By The Design Documentation And Bill Of Quantities Necessary To Include: 1) Full Surveying Services During The Implementation Of The Task, 2) Obtaining Appropriate Decisions Along With Fees And Implementing These Decisions At The Contractors Expense: A) Related To The Implementation Of Works Near Devices Requiring Appropriate Decisions, B) Traffic Organization Project And Occupation Of The Road, C) Other - Necessary For The Implementation Of The Task, 3) Organization And Security Of The Construction Site, 4) Tidying Up The Area After Construction, 5) Preparing An Energy Performance Certificate For The Entire Building Of The Community Center, 6) Obtaining A Non-Final Occupancy Permit Decision On Behalf Of The Ordering Party. 7) Any Other Works Not Covered By The Swz, But Necessary Due To The Art Of Construction.4.4. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 1 To Swz. It Consists Of The Following Documents: 1) Design Documentation, Including: Construction And Technical Designs With Attachments, 2) Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb), 3) Bill Of Quantities Works, 4) Construction Permit, Decision No. 493/2022 Of September 7, 2023. Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Design Documentation Referred To In Point 4.4 Subpoint. 1 Swz And Stwiorb. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence Of Works Not Included In The Bill Of Quantities Or Works In Larger Quantities Than Those Accepted In The Bill Of Quantities During The Implementation Of The Contract Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation Referred To In Point 4.4. 1, Swz Or Stwiorb.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c91c18fe-a89e-43b5-8965-38d24071db41.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.