Installation Of Zpn Fences Around The Pegase Cascad Installations At The Cadarache Site. Ii.1.5)Short Description Of The Contract Or Purchase(S): The Purpose Of The Contract Is The Studies (Implantation, Sizing, Connection, Integration Into The Existing, Etc.) The Supply, Installation And Commissioning Of The Following Equipment: A Fence With Anti-Climbing Characteristics (Welded Mesh With Fine Mesh) And Equipped With Flaps; In Order To Optimize Implementation Times And Take Into Account Operating Constraints, The Method Of Installing The Zpn Fence Must Be Adapted According To The Area. As Such, The Fence Will Be Placed On: Gba Type Plots (Pegase Side (Red Color Layout)) Over A Length Estimated At Around 250 Meters. This Solution Facilitates The Processing Of All Networks Likely To Cross The Route Of The Fence; A Concrete Base Or Gba For The Remaining Portion Estimated At Around 230 Meters Less Impacted By The Presence Of Networks. Bidders Must Detail And Justify Their Choice On This Part Of The Route, Particularly In Terms Of Costs, Completion Times And Sustainability Of The Solution. Instrumentation On The Fence To Detect An Attempt To Cross The Zpn Limit; A Set Of Cameras Associated With Lighting Allowing The Entire Zpn To Be Monitored; Openings (Rotating Security Drums, Gates And Motorized Gate) Allowing The Crossing Of The Zpn Barrier For Authorized People And Vehicles; Access Control Equipment Associated With Openings. The Contract Is A Defense Or Security Contract (Mds) As Defined In Article L11131 Of The Public Procurement Code Paragraph 2: The Supply Of Equipment Intended For Security And Which Involves, Requires Or Includes Supports Or Information Protected Or Classified In The Interest Of National Security. Ii.1.5) Brief Description Of The Contract Or Acquisition(S): Short Description The Purpose Of The Contract Is The Studies (Implantation, Sizing, Connection, Integration Into The Existing, Etc.) The Supply, Installation And Commissioning Of The Following Equipment: A Fence With Anti-Climbing Characteristics (Welded Mesh With Fine Mesh) And Equipped With Flaps; In Order To Optimize Implementation Times And Take Into Account Operating Constraints, The Method Of Installing The Zpn Fence Must Be Adapted According To The Area. As Such, The Fence Will Be Placed On: Gba Type Plots (Pegase Side (Red Color Layout)) Over A Length Estimated At Around 250 Meters. This Solution Facilitates The Processing Of All Networks Likely To Cross The Route Of The Fence; A Concrete Base Or Gba For The Remaining Portion Estimated At Around 230 Meters Less Impacted By The Presence Of Networks. Bidders Must Detail And Justify Their Choice On This Part Of The Route, Particularly In Terms Of Costs, Completion Times And Sustainability Of The Solution. Instrumentation On The Fence To Detect An Attempt To Cross The Zpn Limit; A Set Of Cameras Associated With Lighting Allowing The Entire Zpn To Be Monitored; Openings (Rotating Security Drums, Gates And Motorized Gate) Allowing The Crossing Of The Zpn Barrier For Authorized People And Vehicles; Access Control Equipment Associated With Openings. The Contract Is A Defense Or Security Contract (Mds) As Defined In Article L11131 Of The Public Procurement Code Paragraph 2: The Supply Of Equipment Intended For Security And Which Involves, Requires Or Includes Supports Or Information Protected Or Classified In The Interest Of National Security. Description Of Services The Market Breaks Down As Follows: Firm And Fixed Share Estimated Share O Estimated Share On Unit Price Slip (Bpu) O Estimated Share Based On Prior Estimate (Fdmdp) The Firm Fixed Part Includes Implementation And Execution Studies As Well As Work For The Following Substations And Substations: 1. Living Base Installation 1.1. Living Area: Supply And Installation 1.2. Living Area: Removal 1.3. Storage Area: Supply And Installation 1.4. Storage Area: Drop-Off 2. Fence With Flap + Shock Cable 2.1. Gc/Vrd For Installation On Concrete Base 2.2. Gc/Vrd For Installation On Gba 2.3. Double Flaps 2.4. Anti-Climb Fence Panel (Installation On Gba) 2.5. Fence Posts (Installation On Gba) 2.6. Anti-Climb Fence Panel (Installation On Concrete Base) 2.7. Fence Posts (Installation On Concrete Base) 2.8. Supply And Installation Of Detection Equipment (Shock Cable) 2.9. Centralized Management Equipment For Detection 2.10. Setting Up The Boxes 2.11. Dry Networks 2.12. Wiring And Connection 3. Fence Intervention Lighting 3.1. Lamp 3.2. Setting Up The Boxes 3.3. Facade Installation 3.4. Installation On Mast 3.5. Dry Networks 3.6. Setting Up The Boxes 3.7. Wiring And Connection 4. Special Detector Crossing 4.1. Mechanical Protection 4.2. Detection 4.3. Centralized Management Equipment For Detection 4.4. Setting Up The Boxes 4.5. Dry Networks 4.6. Wiring And Connection 5. Passive Particular Crossing 5.1. Gc/Vrd 5.2. Mechanical Protection 6. Mat Video 6.1. Gc/Vrd 6.2. Mats 7. Video Surveillance Fence 7.1. Fixed Camera 7.2. Ptz Camera 7.3. Facade Installation 7.4. Installation On Mast 7.5. Housewarming 7.6. Setting Up The Boxes 7.7. Dry Networks 7.8. Wiring And Connection 8. Pedestrian Control Zone 8.1. Gc/Vrd 8.2. Trs 8.3. Gate 8.4. Phone 8.5. Carece Badge Readers 8.6. Access Control Management Equipment 8.7. Setting Up The Boxes 8.8. Dry Networks 8.9. Wiring And Connection 9. Pedestrian Zone Lighting 9.1. Lamp 9.2. Setting Up The Boxes 9.3. Dry Networks 9.4. Wiring And Connection 10. Video Surveillance Pedestrian Zone 10.1. Fixed Camera 10.2. Ptz Camera 10.3. Facade Installation 10.4. Installation On Mast 10.5. Housewarming 10.6. Setting Up The Boxes 10.7. Dry Networks 10.8. Wiring And Connection 11. Vehicle Control Zone 11.1. Gc/Vrd 11.2. Portal 11.3. Gate Motorization 11.4. Gate Control Box 11.5. Gate 11.6. Phone 11.7. Carece Badge Readers 11.8. Access Control Management Equipment 11.9. Setting Up The Boxes 11.10. Dry Networks 11.11. Wiring And Connection 12. Vehicle Area Lighting 12.1. Lamp 12.2. Setting Up The Boxes 12.3. Dry Networks 12.4. Wiring And Connection 13. Video Surveillance Vehicle Zone 13.1. Fixed Camera 13.2. Ptz Camera 13.3. Facade Installation 13.4. Installation On Mast 13.5. Housewarming 13.6. Setting Up The Boxes 13.7. Dry Networks 13.8. Wiring And Connection 14. Networks 14.1. Rainwater Treatment 14.2. Connection To Cfa Networks 14.3. Connection To Cfo Networks 15. Layout Of The Technical Room 15.1. Remote Alarm Infrastructure 15.2. Fencing Infrastructure 15.3. Video Infrastructure 15.4. Access Control Infrastructure 15.5. Power Supply And Distribution 16. Reporting Of Information And Systems In The Installation 16.1. Setting Up The Fence Post 16.2. Video Report 17. Documents 17.1. Appropriation Note Of The Technical Specification Of Need And Compliance Matrix 17.2. Hydrological Studies Of The Site Taking Into Account All The Modifications Made By The Operation 17.3. Definition Justification File (Djd) 17.4. Identification And Interface Management File (Digi) 17.5. Site Management File (Dmc) 17.6. Files Related To Construction Site Safety 17.7. Planning Note 17.8. Configuration Summary Report 17.9. Cost Estimate Note 17.10. Operating Cost Estimation Note 17.11. General Test Plan 17.12. Operator Training Plan 17.13. Set Of Deliverables For Closing 17.14. Set Of Deliverables For Fence Detection 17.15. All Deliverables For Access Control 17.16. All Deliverables For Video Surveillance 17.17. All Deliverables For Remote Alarm 17.18. All Deliverables For Electrical Distribution 17.19. All Deliverables For Fitting Out The Technical Room 18. Testing And Trials 19. Licenses Estimated Share On Bpu Additional Services On Unit Price Schedule (Bpu) Concern: The Openings In Subsection 4 In The Following Areas: In The Technical Rooms Of The Installations; On The Facade Of Buildings At The Level Of The Coatings (Asphalted Roads And Parking Lots) Adjustments To Quantities Linked To Fences, Power Supplies, Installation Of Masts Or Cameras, Network Equipment Estimated Share Based On Prior Estimate (Fdmdp) To Take Into Account Hazards; In The Circumstances Provided For In Article 7.2 Of The Contract.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.