General Consultant Projecting Transmission Management Vävra-Marstrand. Since Marstrands Arv Is To Be Phased Out In The Long Term, New Transmission Lines Are Needed To Connect Marstrand With Kungälvs More Central Transmission Network, See Document 7.2 Appendix 1 Project Area, Overview. The Assignment Is A Detailed Design Of New Water And Sewer Lines For The Project Öfl Vävra Marstrand Stages 1, 2 And 3 See Document 7.3 Appendix 2 Stage Division. The Connection Point Of The Transmission Lines In Vävra Appears According To Document 7.6 Wsp Appendix 1 Incl. Comments. The Interconnection Lines Must Be Terminated According To Document 7.10 Mjölkekilen. Kungälvs Municipality Has Previously Done Two Feasibility Studies, See Document 7.7 Sweco Förstudie Marstrand Öfl And 7.9 Reijlers Overview Spill And Drinking Water Investigation. Wsp Has Also Done An Evaluation Study, See Document 7.5 Wsp Investigation, Which The Consultant Must Primarily Take Into Account. However, It Is The Responsibility Of The Consultant To Review The Proposed Wiring And Come Up With Suggestions For Improvement. The Consultant Must Also Take Into Account And Plan For The Other Areas Connections. See Document 7.4 Appendix 3 Plan Other Areas
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.