Lmu Munich, Campus Of Veterinary Faculty Oberschlei heim New Anatomy Pathology Building Earthworks: Loosen The Floor, Load To The Storage Area: 3,575 M Steel In-Situ Concrete Work Floor Slabs: 3,875 M External Walls: 1,500 M Internal Walls: 3623 M Internal Supports: 131 M Covers And Bases: 256M Ceilings: 2933M Steel And Steel Composite Work Steel Composite Beam Control Range, R 15.50M: 10 Pieces Sealing Work Fresh Concrete Composite Sealing Floor Slab: 4244 M Fresh Concrete Composite Sealing Walls: 1558 M Insulation Work Insulation, Foam Glass Under Floor Panels: 4114 M Perimeter Insulation Xps External Walls: 1584 M Masonry Work Mw Interior Wall Ks: 375 M2 Empty Pipe Insertion Work Electrical Installation Pipe: 6800 M Sealing Systems Double Sealing Packing With Fixed/Loose Flange: 18 Pieces
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.