For Construction Work On The Ceremonial Tower And Ceremonial Dome, A Facade Scaffolding With Two Stair Towers, Catwalks, Terrace, 2 Construction Elevators With A Load Capacity Of Up To 500 Kg, And A Printed Mesh Banner (Castle Garden Wing) Must Be Erected. Verifiable Execution Statics With Floor Plans, Sections, Views And Statics For The Scaffolding Construction Must Be Created In Advance, And The Execution Drawings Must Be Submitted For Review.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.