Ebs - New Daycare Building, Erasmustrasse, Nuremberg - Drywall Work. Drywall Work: Gk Walls With Wall Thickness 100 Mm: Approx. 310 M² Gkw Walls With Wall Thickness 125 Mm: Approx. 414 M² Gk Walls With Wall Thickness 150 Mm: Approx. 61 M² Making Door Openings: Approx. 52 Pieces Gk Installation Walls And Facing Shells: Approx. 330 M² Reinforcement Of Sanitary Support Stands With Ua75 Profiles: Approx. 195 M Reinforcement With Osb/3 Panels: Approx. 25 M² Suspended Ceiling Made Of Acoustic Panels Made Of Magnesite-Bonded Wood Wool, Panel Thickness 25Mm, Chamfered: Approx. 1,500 M² Acoustic Layer, Raw Density At Least 50 Kg/M³: Approx. 103 M² Pe Film Bags As Trickle Protection: Approx. 103 M² Substructure Made Of Cd Profiles: Approx. 1,425 M² Substructure For Ceiling Lights Etc.: Approx. 164 Pieces Creation Of Shadow Gaps: Approx. 1,184 M Cable Routing, Ceiling Cutouts, Inspection Panels Curtain Rails, Aluminum, Two-Track: Approx. 117 M Ceiling Sails As Wall Absorbers: Diameter 800 1200 Mm: Approx. 22 Pieces
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.