GTR 70638706

Tenders Are Invited For Renovation Of The Road Surface Along With The Loading Ramp At Building No. 1 In The Military Complex At Ul. Jagiełły 11-23 In Grudziądz - Case No. 81/2023

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
70638706
Tendering Authority
Subscribe to view
Tender No
81/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Road Surface Along With The Loading Ramp At Building No. 1 In The Military Complex At Ul. Jagiełły 11-23 In Grudziądz - Case No. 81/2023
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
16-10-2023 Closed
Work Detail
The Subject Of The Order Is The Renovation Of The Road Surface Along With The Loading Ramp At Building No. 1 In The Military Complex At Ul. Jagiełły 11-23 In Grudziądz Along With Surveying Services, In Accordance With The Requirements Specified In The Contract And A Detailed Description Of The Subject Of The Order And Its Scope Included In The Technical Specification For The Execution And Acceptance Of Works (Stwiorb) And Design Documentation In This Bill Of Quantities (Appendix No. 1 To Swz) The Scope Of The Order Includes Construction Works Relating To: Renovation Of Road Surfaces, Renovation Of The Loading Ramp Surface; Renovation Of The Retaining Structure; Renovation Of Storm Sewage Systems; Renovation Of Street Lighting; Waste Collection And Disposal; Surveying Services For The Completed Task. The Scope Of Works Also Includes The Performance Of Accompanying Works Consisting In Securing The Work Area With Warning Signs, Constructing And Maintaining Construction Facilities, Marking And Securing Installations And Devices On The Work Site. The Contractor Shall Carry Out The Above With His Own Efforts And At The Price Of The Contract. The Area In Which The Works Will Be Performed Will Be Open For The Duration Of Their Execution, Excluding The Part Of The Area Where The Works Will Be Performed. All Construction Works Should Be Organized And Carried Out In Such A Way As To Ensure Safety For People Staying In The Complex And Uninterrupted Use Of The Area Of ​​The Military Complex. When Commencing The Execution Of The Order, The Contractor Submits To Rzi Bydgoszcz, Through The Surveyor Indicated In The Contract, A Report Of Surveying Work In Accordance With Annex No. 3 To The Regulations Of The Military Center For Geodetic And Cartographic Documentation And The Design Documentation Coordination Team At Rzi Bydgoszcz - Registration Of Geodetic Work - Regulations Available At Rzibydgoszcz.Wp.Mil.Pl / Other / For Download. Once The Construction Works Are Completed, The Contractor Will Commence Comprehensive Execution And Completion Of Measurement/Surveying Works And Preparation Of A Surveying Report Enabling Changes To Be Made To The Basic Map And To The Land And Building Records. The Surveying Report Should Be Performed By An Authorized Surveyor In This Respect, In Accordance With Annex No. 8 To The Regulations Of The Military Center For Geodetic And Cartographic Documentation And The Design Documentation Coordination Team At Rzi Bydgoszcz - Regulations Available At Rzibydgoszcz.Wp.Mil.Pl / Other / For Download. The Contractor Submits The Prepared Survey Report To Rzi Bydgoszcz For Approval. Rzi Bydgoszcz Analyzes The Received Documents And Then Sends Back To The Contractor A Document Constituting The Approval Of The Survey Report. The Document Constituting Approval Of The Survey Report Will Be Presented By The Contractor To The Ordering Party For Final Acceptance, Together With Other Documents Specified In The Contract. ►The Contractor Is Obliged To: 1) Ensure The Safety Of Employees Performing The Works (In Particular, To Train The Employees And Equip Them With The Necessary Equipment); 2) Secure The Area Against Entry Of Unauthorized Persons; 3) Carry Out Works On The Work Site In A Way That Does Not Cause Any Inconvenience To Users Military Complex; 4) To Enable Employees, Soldiers And Visitors Of A Given Military Unit To Use The Complex Area In A Safe And Undisturbed Manner During The Execution Of The Works; 5) To Ensure, On Their Own And At Their Own Expense, Appropriate Occupational Health And Safety Conditions, Clothing And Clothing For Persons Performing The Subject Of The Order And Protective Accessories In Accordance With Applicable Regulations, As Well As Equipment, Measures (Including Personal Protective Equipment And Disinfectants) And Devices Necessary To Perform The Activities Covered By The Contract. If The Conditions As Above Are Not Met, The Contractor Shall Be Liable For Damages And Situations Arising As A Result Of His Actions Or Their Omission.►The Contractors Remuneration For The Execution Of The Subject Of The Order Is Determined In A Cost Estimate, According To The Price Indicated In The Contractors Offer. ►The Contractor Provides All Materials And Equipment Necessary To Perform The Subject Of The Order On Its Own And At Its Own Expense And Is Obliged To Use Construction Products Consistent With The Technical Specification For The Execution And Acceptance Of The Works And Approved For Use By The Act Of July 7, 1994 Construction Law ( Journal Of Laws Of 2023, Item 682, Consolidated Text), With Current Approvals And Certificates Allowing Their Use. ►The Materials Used To Complete The Subject Of The Order Cannot Reduce The Utility And Quality Value Of The Completed Order Elements Or Negatively Affect The Durability, Functionality, Aesthetics And Safety Of Use And Enjoyment Of The Work Area And Its Boundaries.► The Contractor Is Obliged To Perform The Works In Accordance With Construction Practice And Construction Standards, Applicable Technical And Technological Regulations And Standards, While Maintaining Applicable Health And Safety Regulations.► Transport Of All Materials And Equipment To The Site Implementation Of The Works And Their Operation Are Borne By The Contractor. ►The Contractor Is Obliged To Ensure Its Own Removal And Disposal Of Waste (Garbage, Rubble, Etc.) In Accordance With Applicable Law, In Particular The Waste Act (Article 3(1)(32) Of The Waste Act Of December 14, 2012, Journal Of Laws Of 2023, Item 1587, As Amended) And Documenting These Activities. The Contractor (Or His Subcontractor) Should Have Authorizations Regarding Permits Arising From The Waste Act And Compliance With The Requirements Of The Act Of December 14, 2012 On Waste (Journal Of Laws Of 2023, Item 1587). If The Contractor Uses A Subcontractor In The Above Scope, He Should Indicate The Subcontractor Along With The Offer. If The Contractor Does Not Indicate Entrusting The Removal And Disposal To A Subcontractor, The Ordering Party Will Assume That The Contractor Will Perform The Scope In Question Independently And Has All The Rights In This Respect In Accordance With Applicable Law. ► The Contractor Is Obliged To Collect And Dispose Of Scrap Obtained During Construction Works. Scrap Obtained From Ongoing Disassembly Should Be Immediately Weighed In The Presence Of The Ordering Partys Supervisory Inspector. Removal Of Scrap From The Construction Site Will Be Possible After Written Notification And Acceptance Of The Document By The Supervision Inspector. Each Removal And Reweighing Will Result In A Quantitative Summary Of The Scrap Obtained From Dismantling, Indicating The Type Criterion (Steel Scrap). Each Time, Based On The Prepared List Obtained From The Dismantling Of Scrap, The Ordering Party Will Issue A Vat Invoice In Accordance With The Currently Applicable Provisions Of The Act And Thus Authorize The Contractor To Sell Or Manage The Scrap Obtained From The Dismantling. The Value Of The Scrap Will Be Determined As Follows: Number Of Kg Of Steel Scrap X Pln 0.85/ Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship); Quantity Kg Of Cast Iron Scrap X Pln 1.20/Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship); Quantity Kg Of Non-Ferrous Scrap (Brass) X Pln 18.57/Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship); Number Of Kg Of Non-Ferrous Scrap (Copper) X Pln 28.83/Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship); Number Of Kg Of Non-Ferrous Scrap (Aluminum - Cables) X Pln 8.10/Kg (Average Wholesale Price In The Kuyavian-Pomeranian Voivodeship);►The Ordering Party Requires The Contractor Or Subcontractor To Employ, Under An Employment Contract, Persons Performing Pavement Renovation - The Performance Of These Activities Involves Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2023, Item 1465). The Contractor Or Subcontractor Is Obliged To Employ People Under An Employment Contract At Least For The Duration Of The Contract Concluded Between The Contractor And The Ordering Party - Art. 95 Of The Public Procurement Law
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
dd733861-49a7-4797-99b0-0148cae8bf73.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders