Quotation Are Invited For G Station Boiler Circulation Pump (Cwp) Overhaul

Tender Detail

70596240
2332302177
Self-Funded
Quotation Are Invited For G Station Boiler Circulation Pump (Cwp) Overhaul
NCB
Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
03-10-2023

Work Detail

Quotation Are Invited For G Station Boiler Circulation Pump (Cwp) Overhaul G Station Boiler Circulation 1032303555Rfx Description G Station Boiler Circulation Pump (Cwp) Overhaul; Contact: For Technical Clarification, Please Contact: Ezazul -0503493353/0555090835, E-Mail- Md.E@Dewa.Gov.Ae Mr. Abdul Razzak-0555567949, E-Mail- Abdulrazzaq.Alkhaja@Dewa.Gov.Ae Mr. Najeeb-0502838591, E-Mail-Najeeb.Kunju@Dewa.Gov.Ae, Mr. Salmin-0545549595, E-Mail-Mohammad.Salmin@Dewa.Gov.Ae 1 Item-00001 1 | Cwp-Scope Of Work Overhauling Of Boiler Circulation Water Pump(Cwp) Of G Station # 2023-24 Pump Details: Model: Hpkeym-350-4 00, Sl. No: 3-N22-576-510-1~4; 3-N22-576-525-1~4 Flow: 1511.3 Ton/Hr, Temp. Max-225 C, Press. Max-40 Bar, Dp-2.6 Bar Rpm-1480, Year Of Manufacture-1992, Make-Ksb Quantity: 3 Nos. Scope Of Work-Vendor: 1.#Mobilization/Demobilization Of People And Materials. Vend Or Need To Apply For Entry Permit In Advance 2.#Risk Assessment And Work Method Statement To Be Submitted. 3.#Tool Box Talk To Be Gi Ven To The Contractor People On Daily Basis. 4.#Pre Dismantling Alignment Readings To Be Recorded If Required. 5.#Disassembly Of Pum P Suction And Discharge Flange And Pipelines. Removal Of Auxiliary Connections/Pipelines. Decoupling Of Motor. 6.#Removal Of Insulation And Refixing Id Required 7.#Removal Of The Pump From Pump Base, Dismantle And Transporting The Parts To Vendor Workshop. 8.#Keep Record/Photographs Of Each Parts At The Time Of Dismantling. 9.#Grit Blasting Of Major Components With Proper Masking (If Necessary ). 10.#Ndt Of Parts. 11.#Run Out Protocol, Clearance Protocol To Be Submitted 12.#Submission Of Detailed Photograph, Inspection Repo Rt With Spare Parts Requirement. 13.#Balancing Of Complete Rotor Assembly/Individual Parts To Iso Grade. 14.#Machining/Skim Machine/ Buffing Of Wear Rings, Impeller Wear Ring Etc. (If Required). 15.#Fixing Of Wear Rings (If Required) 16.#Assembly Of Pump With New P Arts-Provided By Dewa Based On Inspection Report. 17.#Paint Similar Color As Received And Blind All Opening Properly. Idual Parts To Be Transported To Dewa With Proper Packing. 19.#Assembly/Fixing Of The Pump In Location And Connecting Discharge And Suction Pipelines And Auxiliary Connections. 20.#Alignment With Motor 21.#Commissioning Of The Pump. 22.#Return The Old Material Mat Ching With The Spares Used. 23.#Duration Of Work 7 Days. 24.#Submission Of Overhaul Report Which Comply With Dewa Check List. Vendo R#S General Responsibility And Liabilities: 1.#Contractor Shall Provide Supervisory, Skilled, Semi-Skilled Work Forces 2.#Contractor Has To Do The Complete Work By Engaging Competent And Reliable Workforces. 3.#One Supervisor Must Be At Site During The Work. 4.#Al L Required Tools, Special Tools & Equipment Etc. Required To Complete The Job With Valid Certificate 5.#All Consumables And Any Othe R Material Required To Complete The Work 6.#Contractor Shall Provide All Personal Protective Equipment, First Aid Kit Available, Cov Id-19 Precautionary Kit At Site During The Course Of Works. 7.#Contractor Shall Complete The Work Within Specified Duration. Duratio N Will Be Count From Signing Of Ptw To Return Of Ptw. 8.#Contractor Has To Complete The Work Within The Schedule Provided By Dewa Ei Ther By Increasing His Work Force Or By Round The Clock Work. 9.#Work Will Be Carried Out As Per Dewa Work Schedule. Different Sched Ule Will Be Followed For Individual Work. Vendor Shall Be Ready To Work Any Time Of The Week Including Weekend And Holidays To Meet The Plant Requirement. 10.#If Any Damage Full Or Partial, Loss/Missing Of Material/Spares Or Such Kind Of Any Miss Happening Of The Pump During The Work Will Be Repaired/Replaced That Full By The Vendor With Their Own Cost. 11.#Any Damage Of The Adjacent Equipment , Lines, Instruments Etc During The Work By The Vendor That Has To Be Repaired/Rectified/Replaced Including Material 12.#Whole Work Including Transit To Be Insured And A Copy Of The Policy To Be Submitted Before Commencing The Work. 13.#Contractor Shall Follow Th E Dewa Safety Policy 14.#Daily Progress/Review Meeting Along With Dewa 15.#Upon Completion Of All Works, A Formal Work Completion Re Port Shall Be Submitted. Mandatory For Bidding: 1.#Need To Check The Drawing Attached, But Work Will Be Completed As Per Site Condi Tion 2.#Visit Site Before Submitting Offer Scope Of Dewa: 1.#All Connected I&C And Electrical Instruments Shall Be Removed By Dewa . 2.#Dewa Will Supply Required Mutually Agreed Upon Spares Parts Based On The Inspection Report And Dewa Engineers Inspection. 3.#De Wa Will Provide Forklift, Electricity And Service Air As Available At Site 4.#Dewa Will Provide Entry Permit For The Work Team. War Ranty: 1.#The Warranty Period For The Works Shall Be One Year From The Date Of Commissioning 2.#In Case Of Any Damage/Defect Of The Work Carried Out Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repair/Replacement Work Of The Defect Up To Normal Operation Condition Within Shortest Period Without Considering Holiday/Weekend. The Contractor Shall Provide 24 Hrs. Emergency Contact. Contact: For Technical Clarification, Please Contact: Ezazul -0503493353/0555090835, E-Mailmd.E@Dewa.Gov .Ae Mr. Abdul Razzak-0555567949, E-Mailabdulrazzaq.Alkhaja@Dewa.Gov.Ae Mr. Najeeb-0502838591, E-Mail-Najeeb.Kunju@Dewa.Gov.Ae, Mr. Salmin-0545549595, E-Mail-Mohammad.Salmin@Dewa.Gov.Ae 18.#Pump/Indiv 3 G01 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332302177

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail