Tenders Are Invited For Modernization Of The School Canteen At The Primary School In G sawa

Tender Detail

70586928
IRG.271.36.2023
Self-Funded
Tenders Are Invited For Modernization Of The School Canteen At The Primary School In G sawa
NCB
Central Europe
European Union
12-10-2023

Work Detail

The Order Includes Construction Works Consisting In The Reconstruction Of The Kitchen Rooms In Connection With The Modernization Of The School Canteen At The Primary School In G sawa. Scope Of Work: - Existing Oil Or Emulsion Paint On Walls And Ceilings To Be Scraped, - Demolition Of Wall And Floor Coverings Made Of Stoneware/Ceramic Tiles, - Demolition Of Existing Partition Walls (Non-Load-Bearing), - Widening Of Existing Door Openings With The Installation Of New Pre-Stressed Concrete Lintels, - Making Plaster Additions And Floors In Places Where The Holes Were Drilled, - Making Rei120 System Ceiling Cladding, - Dismantling Existing Sanitary And Kitchen Equipment, Including Plugging The Entrances, - Execution New Sewage Approaches And Sewage Risers Made Of Pvc And Water Risers Made Of Pex Pipes, Connection To The Existing Installation And Risers, Dismantling Of Existing Radiators Along With Hammering In Central Heating Installation Pipes. In Building Partitions, Pex Installation Pipes, Installation Of New Radiators With Thermostatic Heads Connected To The Existing Installation, Floor Covering In Kitchen Rooms With Anti-Slip Stoneware Tiles, Implementation Of Waterproof Insulation (Liquid Foil) On The Walls And Floor In Place Installation Of Tiles, - Wall Cladding In Kitchen Rooms Up To A Height Of Min. 2.0 M Made Of Easily Washable Materials (Tiles), - Plastering And Painting With Priming On The Walls And Ceilings Above The Tiles, - Replacement Of Existing Internal Window Sills With Sills Made Of Conglomerate, - Installation Of New Sinks, Washbasins, Hose Connectors, Floor Grates And Gullies, Faucets And Necessary Accessories, Housing For Sanitary Sewage And Central Heating Risers. From Gypsum Boards In The Manufacturers System Solution, - Installation Of Door Frames And Doors To Rooms, Doors With Ventilation Undercuts In Accordance With Applicable Regulations, - Replacement Of Existing Switches And Sockets Of The Electrical Installation Along With Replacement Of Cabling In The Area Of The Rebuilt Kitchen Rooms, - Disassembly And Installation Of New Lighting Lamps Led Type, Installation Of Spiro Type Ventilation Ducts With Ventilation Grilles, Automatic Fan And Gypsum Board Casing, Installation Of Ventilation Grilles, Installation Of Kitchen Equipment In Accordance With Kitchen Technology, Installation Of Wall Vents Under The Windows In Kitchen Rooms To Ensure Air Inflow For The Rooms. In Addition To The Above-Mentioned Scope Of Work, The Contractor Will Also Be Obliged To Replace Pvc Window Joinery With Wooden One In The Rebuilt Rooms (In Accordance With Fig. 10 List Of Joinery). Three Windows Marked As O1 Windows Should Be Replaced (2 Windows In The Kitchen, 1 Window In The Washing Room) And The O2 Window In The Social Room/Cloakroom. The Windows Must Be Equipped With Pressure, Automatic Window Vents With The Possibility Of Manual Closing. The Size Of The Openings And The Existing Arrangement Of Window Divisions Should Be Maintained. In The Case Of A Window Marked O2 Located In A Social Room/Cloakroom, The Contractor Will Be Obliged To Enlarge The Window Opening And Install An O2 Window In The Size Indicated In The Annex. Fig. 10. Joinery List. Single-Frame Window Structure With A Frame And Sash Cross-Section Of 92X81 Mm, Made Of Three-Layer Scantlings. Glued, Homogeneous Or Joined In Length, Made Of Pine Wood. Glazing: Three-Pane, Two-Chamber Set (4-18Kr-4-18Kr-4), 48 Mm Package. Heat Transfer Coefficient Ug=0.5 W/M2k (En-Pn 674, Inter-Pane Space Filled With Krypton, Safe Glass. Fittings Hinged, Tilt-And-Turn Or Turnable (According To The Diagrams In The Drawings) With Anti-Burglary Catches. Painting In A 4-Coat System - Impregnation, Primer, Interlayer, Topcoat. Ral 8016 Color From The Outside And Inside. The Contractor In Connection With The Replacement Of The Indicated Windows, Will Also Install External Window Sills Made Of Titanium-Zinc Sheet, Color Ral 8016. Note: The Above Description Is Only A Specification Of The Scope Of Work. The Detailed Scope Of Work To Be Performed Is Specified In The Design Documentation And Detailed Technical Specifications For The Execution And Acceptance Of The Works, Constituting Annexes To This Swz. Subject Matter Of The Order Is Described In Detail In The Following Documents Constituting Attachments To The Swz: 1) Appendix No. 1 Architectural And Construction Design Reconstruction Of Kitchen Rooms As Part Of The Task Modernization Of The School Canteen At The Primary School In G sawa; 2) Appendix No. 2 Technical Design Reconstruction Of Kitchen Rooms As Part Of The Task Modernization Of The School Canteen At The Primary School In G sawa;3) Appendix No. 3 Window Joinery - Drawing Part; 4) Annex No. 4 Technical Specification For The Execution And Acceptance Of Works - Electrical Installations; 5) Annex No. 5 Technical Specification For The Execution And Acceptance Of Works - Sanitary Installations; 6) Annex No. 6 Technical Specification For The Execution And Acceptance Of Works - General Construction Works; 7) Annex No. 7 Technical Specification For The Execution And Acceptance Of Works - General Construction Works: Improvement Of The Condition With Partial Thermal Modernization Of The Historic Building Of The Old School In G sawa (In The Part Regarding Window Joinery); 8) Annex No. 8 Bills Of Quantities. Due To The Fact That In The Design Documentation (In The Bill Of Quantities) Certain Equipment And Materials May Be Marked With Trademarks Or Designations Of Origin, It Should Be Assumed That Each Marking Is Accompanied By The Words Or Equivalent That Is, With Parameters, Features, Technical Values, Qualitative Aesthetic Values Not Worse Than Those Specified In The Design, Guaranteeing The Implementation Of Works In Accordance With The Construction Design. All Proper Names Used In The Design Documentation And Bills Of Quantities Should Be Interpreted As Definitions Of Standards, And Not As Names Of Specific Solutions Applicable In The Implementation Of The Task, Are Not Binding On The Contractors And Should Be Understood As The Minimum Expected Quality, Technical, Functional And Utility Parameters And Required Standard. The Use Of Equivalent Solutions Cannot Lead To A Deterioration Of The Properties Of The Subject Of The Contract In Relation To Those Expected In The Design Documentation. Equivalent Products And Devices Must Have All Legally Required Certificates, Approvals And Certificates Allowing Them To Be Traded And Used. The Obligation To Prove Equivalence Rests With The Contractor.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail