1. Location: Plot No. 2215/4 Ul. Ko ciuszki 41A, 38-300 Gorlice2. The Subject Of The Order Is To Perform The Following Works: - Laying Paving Stones Approx. 310 M , 80 M Of Edges And Digging, Leveling And Sowing A Lawn Of Approx. 200 M2, The Contractor Is Responsible For Providing All Necessary Raw Materials, Gravel, Ballast, Etc. The Ordering Party Has Paving Stones And Edges; - Execution Of Drainage Rainwater With Soil From The Downspouts From The Entire Building To The Drainage Well, Along With Its Reconstruction And Construction Of A Cover With A Manhole, Drainage Length Approx. 75 M; - Replacement Of Sheet Metal Fittings, Replacement Of Gutters And Repainting Of The Roof On The Existing Part Of The Building; - Installation Of Floor Insulation On The Ground Floor Of The Existing Building Along With Screed, Reconstruction Of Walls (Separation Of A Conference Room, Two Office Rooms And A Bathroom With A Toilet) - Construction Of Electrical And Heating Installations And A Bathroom With A Toilet Adapted To The Needs Of Disabled People (According To The Agreed Design), Along With Plastering And Painting Of Walls And Ceilings. - Renovation Of The Existing One Office Part, Replacement Of Floor Panels With Tiles In Office Rooms, Making A Leveling Screed And Laying Tiles In The Corridor, Cutting Down Stairs And Making A Ceiling, Replacing Internal Office Doors, Reconstruction Of Partition Walls, Renovation Of The Heating Installation With The Connection Of A New Central Heating Furnace, Renovation Of The Bathroom - (Replacement Tiles, Toilet Construction According To Agreed Design) Making Masonry Corrections And Repainting Walls And Ceilings - Making Sheet Metal Corrections And Painting The Roof In The Old Part Of The Building. The Trowels Include The Delivery And Installation Of 12 Internal Office Doors, Construction Of A Heating Installation With Radiators, Screeds With Insulation And Soundproofing. The Ordering Party Has A Central Heating Furnace. - The Contractor Bears The Costs Of Purchasing And Transporting All Construction Materials Needed To Complete The Task, As Well As Fittings And Radiators. - The Contractor Bears The Costs Of Purchasing And Installing Air Conditioning For All Office Rooms.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.