Tenders Are Invited For Execution Of Construction Works As Part Of The Investment Project Entitled: Construction Of A Playground At Ul. 11 Listopada In Dzier oni w.

Tender Detail

70540275
ZI-1.271.64.2023
Self-Funded
Tenders Are Invited For Execution Of Construction Works As Part Of The Investment Project Entitled: Construction Of A Playground At Ul. 11 Listopada In Dzier oni w.
ICB
Central Europe
European Union
10-10-2023

Work Detail

1) The Subject Of The Order Is The Performance Of Construction Works Related To The Implementation Of The Investment Task Entitled: Construction Of A Playground At Ul. November 11 In Dzier oni w. 2) The Scope Of The Order Concerns The Construction Of A Playground, An Outdoor Gym, And A Football Playing Area At Ul. On November 11, On Surveying Plot No. 589/2, Centrum District, City Of Dzier oni w (Recreational Area At The Social Welfare Center), For Which A Certificate Of No Grounds For Objection No. Ba.6743.1.10.2022 Of February 3, 2022 Was Issued. Which Include In Particular: A) Demolition And Disposal Of The Existing Asphalt Surface (Volleyball Court) And All Old Equipment Such As Football Goals And Volleyball Posts; B) Dismantling Of All Existing Concrete Edges And Their Disposal; C) Removal Of Self-Seeded Trees Along With Their Disposal And Pruning As Indicated In The Study; D) Construction Of A Pedestrian Route Made Of Gray Concrete Cubes, Area 330 M2; E) Making A Surface Of Certified Sand, Area 301 M2; F) Construction Of A Surface For Mulching With Bark, Area 68 M2; G) Construction Of A Biologically Active Surface - Lawns - Recultivation Of The Area. 1,524 M2; H) Construction Of A Playground Equipped With Play Elements In Accordance With The Study And With A Board Containing The Regulations For Using The Facility. The Content On The Board Is Subject To Acceptance By The Ordering Party;I) Construction Of An Outdoor Gym Equipped With Equipment In Accordance With The Study;J) Equipping The Area With Small Architectural Objects (Waste Bins, Benches, Bicycle Racks;K) Equipping A Football Field With Elements Such As, Among Others, Aluminum Goals, Ball Catchers; L) Installation Of Two Entrance Gates And A Double-Leaf Entrance Gate; ) Spot Repair Of The Existing Fence, Including Cleaning And Painting With External Paints; M) Making A Sign With Information About Monitoring The Area; N) Installing Solar Lighting And Monitoring; O) Planting: - Forsythia Intermedia - 37 Pcs.; - Symphoricarpos Albus Variety Laevigatus - 30 Pcs.; - Tilia Cordata Greenspire - 8 Pcs.3) The Detailed Scope Of The Subject Of The Order Was Specified In: A) Development Plan For The Construction Of A Playground At Ul. 11 Listopada, Designer Agnieszka Kwa niak; B) Detailed Design For The Construction Of A Playground At Ul. November 11, Designer Agnieszka Kwa niak;C) Technical Specification For The Execution And Acceptance Of Works - January 2022;D) Bill Of Quantities Constituting Auxiliary Material For Estimating The Contractors Offer Price.4) The Contractor Is Obliged To Perform The Scope Of Works Indicated In The Design Documentation, Including The Development Design Site And Implementation, Which Is Specified In The Technical Description Or In The Drawings Or Simultaneously In The Description And In The Drawings. Both The Technical Description And The Drawings (Graphic Part) Of The Projects Are Equivalent And Describe The Subject Of The Order.5) The Contractor Is Obliged To Perform Construction Works In Accordance With The Construction Practices, Recommendations Of The Investors Supervision, And The Documentation Referred To In Section 3 Of This Paragraph, Taking Into Account The Elimination Of Architectural Barriers For Disabled People And A Certificate Of No Grounds For Objection No. Ba.6743.1.10.2022 Of February 3, 2022.6) In Addition, The Contractor Is Obliged To Perform Accompanying Works Related To The Construction Of The Playground And Their Connections With Existing Sidewalks, Buildings, Accesses To Buildings, Etc. In The Event Of Interference With Or Damage To Adjacent Structures, Their Repair, Addition, Height Adjustment, Etc. Should Be Taken Into Account.7) The Contractor, In Addition To The Obligations Arising From Points 1-6, Undertakes To: A) Protocol Takeover Of The Construction Site, Its Security And Proper Marking, And Request The Network Administrators To Hand Over The Devices In A Protocol For The Duration Of The Works, And After Completion Of The Works, Protocol Handover Of Them To The Owners, As Well As Making The Construction Site Available To Network Administrators For The Purpose Of Carrying Out Renovation Works On Their Resources If Necessary; B) Ensuring Access To Properties Located Within The Investment During The Works, Including Access For Rescue Services; C) Organization Of Construction Facilities, Social And Sanitary Rooms For Employees And A Place For Storing Materials; D) Ensuring The Supply Of Necessary Utilities To Carry Out The Works And Payment For Their Delivery. The Contractor Shall Provide The Necessary Utilities On Its Own To Ensure Proper Performance Of The Works; E) Bear All Costs Related To The Implementation, Supervision And Fulfillment Of All Obligations Arising From The Decision On The Building Permit/No Objection And Obligations Arising From The Arrangements And Opinions Obtained And Those Which The Contractor Is Obliged To Obtain During The Execution Of Construction Works; F) Perform Tests, Tests And Measurements During The Execution Of Construction Works And Acceptance Tests In Accordance With The Technical Specifications; G) Provide The Ordering Party With Declarations On The Assumption Of Duties By The Construction Manager On The Day Of Signing The Contract; H) Cleaning On Current Surfaces Of The Adjacent Area And Streets In The Case Of Spreading Mud From The Construction Site On The Wheels Of Machines, Cars And Other Technical Devices;I) Tidying Up The Construction Site And Restoring The Adjacent Area To Its Original Condition After Completion Of The Works;J) Removing Material And Debris From Demolition, Mineral Masses - Bituminous And Unnecessary Materials And Unnecessary Equipment To A Waste Landfill And Incurring The Costs Of Their Storage And Disposal; K) Geodetic Services During The Implementation Of Construction Works, As Well As To Perform Post-Construction Geodetic Measurements With A Title Page And Legend And In Electronic Form On A Cd; L) Protection Of Geodetic Control Points, And In The Event Of Their Destruction Or Damage Or The Need To Transfer The Order To An Authorized Geodetic Contracting Entity To Restore Them Or Establish New Ones; M) Submitting The Documents Resulting From The Swz To The Ordering Party Before Signing The Contract; N) Implementing The Safety And Health Protection Plan; O ) Participation Of The Construction Manager In Construction Councils Held At Least Once A Week; P) Ongoing Preparation Of Construction Settlements And Invoices According To The Ordering Partys Recommendations;Q) Other Necessary Activities Required By Law And Related To The Implementation Of The Subject Of The Order;R) Performing Coordination Functions In Relation To Works Carried Out By Subcontractors; S) Fulfillment Of Obligations, Including Those Of The Investor (Municipality), Resulting From The Arrangements, Permits And Decisions Contained In The Land Development Project, As Well As Those That Will Be Issued In The Course Of The Implementation Of The Works.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail