Modernization Of The Steam Turbine Controller Of The Ec2 Gas And Steam Unit To Increase The Units Availability. 1. The Subject Of The Order Are Modernization Works Involving The Replacement Of The Deh (Digital Electrohydraulic) Controller Of The Marc4c10 Steam Turbine Installed In The Ec2 Gas-Fired Heat And Power Plant, Including The Control System And Delivery Of Operator Stations, A Redundant Controller, Power Supplies, Vibration Sensors, I/O Modules And Communication Modules, Replacement Speed Monitor With Dops Overspeed Protection System, Digital Overspeed Protection System, Replacement Of The Generators Power Automation Protection System (Eaz), And Replacement Of The Redundant Steam Turbine Protection System And Replacement Of The Vibration Measurement System For The Steam Turbine, Gearbox And Generator. 2. The Order Is Of A Mixed Nature And Includes Elements Of Supplies, Services And Construction Works, However, The Main Subject Of The Order Are Supplies. 3. A Detailed Description Of The Subject Of The Order Is Attached As Annex No. 1 To The Swz - Description Of The Subject Of The Order.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.