Tenders Are Invited For Construction Of A Playground In Podlesie D bowe On Plot No. 41/20

Tender Detail

70431861
RG.271.41.23
Self-Funded
Tenders Are Invited For Construction Of A Playground In Podlesie D bowe On Plot No. 41/20
NCB
Central Europe
European Union
09-10-2023

Work Detail

1) The Subject Of The Order Is The Construction Of A Playground In Podlesie D bowe On Plot No. 41/20.2) The Scope Of The Order Includes: A) Preparatory Works B) Construction Of Communication Routes - Sidewalks Made Of Concrete Cubes C) Construction Of A Safe Surface With A 30 Cm Layer Of Sandd ) Construction Of A Grass Surface On The Football Pitche) Land Development With Plantingsf) Delivery And Installation Of Playground Equipmentg) Delivery And Installation Of Playground Equipmenth) Land Development With Plantingsi) As-Built Inventory.3) In Addition, A Detailed Description And Scope Of The Subject Of The Order Are Determined By: Documentation Design Annex No. 5 To The Swz, Stwiorb Annex No. 6 To The Swz, Bill Of Quantities (Which Is Part Of The Design Documentation) Annex No. 4 To The Swz And Designed Provisions Of The Contract Annex No. 7 To The Swz4) The Principle Adopted In The Draft Contractual Provisions Is Lump Sum Remuneration, So The Bill Of Quantities Included In The Design Documentation Is Also Intended To Enable The Valuation Of Individual Elements Of The Works5) The Ordering Party Expects The Contractor To Provide The Price For The Implementation Of The Entire Subject Of The Contract As A Lump Sum Price, Which Includes The Execution Of All Elements Of The Contract That Are The Subject Of The Drawing And Text Of The Documents Order, Including Vat Applicable On The Date Of Submission Of The Offer. In Order To Determine The Price For The Implementation Of The Task, The Contractor Is Obliged To Determine Its Scope Based On The Design Documentation.6) Before Signing The Contract With The Selected Contractor, The Ordering Party Requests That He Present A Simplified Offer Cost Estimate, Prepared On The Basis Of The Design Documentation, Bill Of Quantities, Stwiorb And A Possible On-Site Visit Carried Out By The Contractor.7) The Ordering Party Reserves The Right To Accept The Elements Of Small Architecture Selected By The Contractor.8) Moreover, As Part Of The Subject Of The Order, The Contractor Is Obliged To: A) Apply To The Managers Of Networks Colliding With The Scope Of Works To Agree On The Scope Of Works In The Road Right-Of-Way And Paying For The Supervision Of The Operators Of The Underground And Above-Ground Utilities Network (If Necessary), B) Ensuring That The Works Are Managed By Persons With Qualifications In The Specialties Necessary For The Proper Performance Of The Entrusted Task And Keeping A Construction Log During The Implementation Period In Cooperation With The Supervision Inspector Appointed By Employer, Final Remarks: - The Contractor Will Perform Construction Works Based On The Design Documentation, In Accordance With The Conditions Of Execution And Acceptance Of Works Specified In Stwiorb, With Due Care, In Accordance With Currently Applicable Regulations, Technical Norms, Standards, Principles Of Construction Practice, Professional Ethics And Conditions Draft Provisions Of The Contract /Appendix No. 7/ - To Perform The Works, The Contractor Will Use Only Its Own Materials, Having The Required Approvals And Certificates, Which Will Be Required At The Final Acceptance Of The Works. When Selecting Materials, The Requirements Specified In The Technical Documentation And The Technical Specification For The Execution And Acceptance Of The Works Should Be Taken Into Account, - During The Implementation Of The Works, The Contractor Will Remove And Store All Auxiliary Equipment On Its Own And At Its Own Expense, - All Other Costs Of Implementing The Subject Of The Order (Utility Costs Electricity, Water, Fees, And Others) Necessary To Be Incurred For The Proper Performance Of The Order, Until Its Fault-Free, Protocol Acceptance By The Ordering Party, Will Be Borne By The Contractor. During The Implementation Period, The Contractor Will Keep An Investment Implementation Log (If Necessary) In Cooperation With The Supervision Inspector (If Appointed), Particular Caution Should Be Exercised And The Nuisance Related To The Work Carried Out Should Be Minimized, As The Contractor Will Be Fully Liable For Any Damages And Consequences Of Accidents. Accidents Of Employees And Third Parties Arising In Connection With Construction Works Carried Out In The Period From The Date Of The Protocol Takeover Of The Construction Site By The Contractor To The Date Of Final Acceptance Of The Works, - The Contractor Is Responsible For Carefully Reading The Order Documents. It Is Recommended To Make An On-Site Visit To The Place Of Implementation Of The Subject Of The Order In Order To Estimate, On Your Own Responsibility, The Costs And Risk Of Execution Of The Order And To Obtain All Data That May Be Necessary For The Reliable Preparation Of The Offer, - If The Order Documents Indicate Trademarks, Patents In Relation To Any Materials Or Devices Or Origin, The Ordering Party Allows The Offer Of Equivalent Materials Or Devices With Parameters Not Worse Than Those Described In The Procurement Documents, Which Should Be Treated As Minimum. Due To The Above, Materials Or Devices From Specific Manufacturers Determine The Minimum Quality Parameters And Functional Features That The Materials Or Devices Offered By The Contractor Must Meet In Order To Meet The Requirements Set By The Ordering Party. Such Parameters Will Be Considered As Criteria Used To Assess Equivalence, In Accordance With Article 99 Section 6 Of The Public Procurement Law. Materials Or Devices From Specific Manufacturers Constitute Only A Quality Standard Of The Subject Of The Order. The Term Minimum Quality Parameters And Functional Features Means That The Ordering Party Understands The Requirements For Materials Or Devices Contained In Publicly Available Sources, Catalogs And Manufacturers Websites. The Use Of Exemplary Manufacturers Names Is Only Intended To Clarify The Level Of Expectations Of The Ordering Party In Relation To A Specific Solution. The Use Of Manufacturer/Product Names Is For Example Purposes Only. By Indicating The Designation Of A Specific Manufacturer (Supplier) Or A Specific Product In The Description Of The Subject Of The Order, The Ordering Party Also Allows Equivalent Products With Quality Parameters And Functional Features At Least At The Level Of The Parameters Of The Indicated Product, Thus Accepting Every Product With The Indicated Or Better Parameters. In Such A Situation, The Ordering Party Requires The Submission Of Appropriate Documents Authenticating These Materials Or Devices. The Ordering Party Reserves The Right To Ask The Author Of The Design Documentation For An Opinion On The Offered Materials Or Devices. This Opinion May Constitute The Basis For The Ordering Party To Decide To Accept Equivalent Materials Or Devices Or To Reject The Offer Due To Lack Of Equivalence - All Requirements Specified In The Procurement Documents Are Minimum Requirements And Their Fulfillment Is Obligatory. Failure To Meet The Above-Mentioned Minimum Requirements Will Result In Rejection Of The Offer As Inconsistent With The Terms Of The Contract Pursuant To Art. 226 Section 1 Point 5 Of The Public Procurement Law.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail