Tenders Are Invited For Purchase Of Works For The Investment Objective High Efficiency Cogeneration Production Unit To Replace The Existing Block 1, Unique Code 4230487/2023/47

Tender Detail

70389038
570866-2023
Self-Funded
Tenders Are Invited For Purchase Of Works For The Investment Objective High Efficiency Cogeneration Production Unit To Replace The Existing Block 1, Unique Code 4230487/2023/47
NCB
Eastern Europe
Balkans,European Union
18-10-2023

Work Detail

Purchase Of Works For The Investment Objective High Efficiency Cogeneration Production Unit To Replace The Existing Block 1, Unique Code 4230487/2023/47. High Efficiency Cogeneration Production Unit To Replace The Existing Unit 1 Purchase Of The Energy Production Unit Composed Of: The Assembly Consisting Of 2 Caf Hot Water Boilers, Switchboards With Installations And Electrical Equipment, Pumping Station (Sp), Electrical Station (Se), Thermal Energy Measurement And Metering System, With Natural Gas Operation Having A Capacity Nominal Capacity Of At Least 50 Mwt, Representing Object 1 Of The Investment. The Assembly Consisting Of 4 Thermal Engines (Chp) For High-Efficiency Cogeneration Energy Production, Panels With Electrical Installations And Equipment, Electrical Station (Se), Electrical And Thermal Energy Measurement And Metering System, With Natural Gas Operation Having A Capacity Total Electrical Capacity Of 25 Mwe (10%/+25%) Mwe And Minimum Thermal Capacity Of 21 Mwt, Representing Object 2 Of The Investment. Demolition Of Cooling Tower No. 2, Representing Object 3 Of The Investment. The Design, The Execution Of The Works, The Supply, The Installation, The Training Of The Operating Personnel Of The Beneficiary And The Commissioning Of The Investment, Including Its Integration Into The Existing Installation In Accordance With Art. 160 Para. (2) From Law 98/2016 With Subsequent Amendments And Additions, The Contracting Authority Establishes Two Deadlines In Which Economic Operators Can Address Requests For Clarification, Respectively In Which It Will Respond To All Requests For Clarification/Additional Information, As Follows: 1. The First Term Until Which Any Interested Economic Operator Has The Right To Request Clarifications Or Additional Information Regarding The Award Documentation Is 35 Days Before The Deadline For Submission Of Offers. The Contracting Authority Will Respond Clearly And Completely To All Clarification Requests On The 30Th Day Before The Deadline For Submission Of Offers. 2. The Second Term Until Which Any Interested Economic Operator Has The Right To Request Clarifications Or Additional Information Regarding The Award Documentation Is 20 Days Before The Deadline For Submission Of Offers. The Contracting Authority Will Respond Clearly And Completely To All Clarification Requests On The 11Th Day Before The Deadline For Submission Of Offers. Depending On The Complexity Of The Clarification Requests Addressed By The Economic Operators, For Which The Answers Should Be Published At The First Deadline Indicated Above, The Contracting Authority Reserves The Right To Publish The Answers To The Respective Clarifications At The Second Deadline Established In The Award Documentation. The Deadlines For Answering The Clarifications Were Established So That The Economic Operators Have An Adequate Period To Analyze The Award Documentation And, Subsequently, To Prepare The Offers Through The Prism Of The Answers Provided By The Contracting Authority. Clarification Requests Will Be Transmitted In Editable Format. The Estimated Total Value 158,732,996.21 Lei Without Vat, Broken Down As Follows: 154,087,279.21 Lei (Without Vat) Representing The Execution Component Of The Design And Execution Contract (All Objects), Supply, Installation, Training Of The Beneficiarys Operating Staff And Putting The Investment Into Operation, Including Its Integration Into The Existing Installation + Organization Of Construction Site And Technological Tests 4,645,717.01 Lei (Without Vat) Representing The Design Component Of The Design And Execution Contract According To Hg 1/2018 The Budget Line Dedicated To Implementation Reserves Provides A Value Of 3,968,324.91 Lei Without Vat. This Is Not Included In The Estimated Value Above. Bidders Will Not Have Any Obligation In Relation To The Values Of The Components, These Being Indicative, The Offer Being Compared As A Whole With The Estimated Value Of The Contract. The Provisions Of This Section Are Supplemented With The Provisions Of The Task Book.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail