GTR 70354350
Quotation Are Invited For Refurbishment Of Diverter Damper Hydraulic Cylinder
NCB — National Competitive Bid
Closed
Asia
Tender Information
GTR Reference
70354350
Tendering Authority
Subscribe to view
Tender No
2412301264
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Refurbishment Of Diverter Damper Hydraulic Cylinder
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
27-09-2023
Closed
Work Detail
Quotation Are Invited For Refurbishment Of Diverter Damper Hydraulic Cylinder Service Pr For Refurbishment 1032302180Rfx Description Service Pr For Refurbishment Of Diverter Damper Hydraulic Cylinder, Piston Dia 200Mm X Rod Dia 140Mm, Stroke Length 1620Mm, At M Station, Jable Ali. Anton Jacob Mob: 0554607122/04-3225881 1 Item-00001 Technical And General Specification Of Outsourcing Work M Station, Jabel Ali Power Station Title: Refurbishment Of Diverter Damper Hydraulic Cylinder, Piston Dia 200Mm X Rod Dia 140Mm, Stroke Length 1620Mm Hydraulic Cylinder - Qty 1 No. Only (Inside Cylinder) Co Ntact Person: Anton Jacob Mob: 0554607122/04-3225881 A.#Pre-Bid Site Inspection: ·#The Contractor Shall Visit The Site And Make The Mselves Fully Familiar With The Work Scope, Plant Access, Facilities, Complexities, Etc., Before Submitting The Bid. Dewa Will Not A Ccept Any Claim For Extras Beyond The Order Rates / Prices During And After The Execution Of Work Ordered. B.#Scope Of Work: ·#Mob Ilize Men/Equipment Within 01 Day Of Advance Notice. ·#Get Ptw (Permit To Work) And Lc (Line Clearance) Document From Dewa. ·#The Following Documents To Be Submitted To Get Ptw, O#A.#Method Statement O#B.#Risk Assessment Of The Work O#C.#Tool Box Talk Report. ·#En Sure Area Is Correctly Secured And Safe To Work On In All Respects ·#Conduct Site Survey And Safety Inspection To Assess The Working Environment. ·#If The Working Environment Safe, You Can Proceed With The Following Steps. ·#Mechanically Lock The Diverter Damper, As Both Hydraulic Cylinders Are To Be Removed. ·#Disconnect The Hoses From The Hydraulic Cylinders (Inside & Outside) ·#Remove The O Utside Hydraulic Cylinder From The Location For Accessing The Inside Cylinder (Rigging Tools & Belts Are Under Contractor Scope) ·#R Emove The Inside Hydraulic Cylinder From Location For Replacement ·#Replace The Second Hydraulic Cylinder With The Tested Hydraulic Cylinder (Provided By Dewa). ·#Install The Outside Hydraulic Cylinder. ·#Connect The Hydraulic Hoses To The Cylinders. Ensure That H Oses Are Connected Correctly. ·#Remove The Mechanical Lock From The Diverter Damper. ·#Removal & Installation Of The Cylinders, Hose S (All Site Work) To Be Completed In One Day. ·#Transport The Hydraulic Cylinder (1 No.) From Dewa M Station To Contractor Workshop ·#Dismantling, Cleaning, Inspection Of Hydraulic Cylinder Components ·#Inform Dewa For Any Damage Noticed ·#Polishing/Chroming/Honin G Of Cylinder Piston Rod/Tube, Seals Replacement. (Consumable Supplied By Dewa) ·#Assembling Of Cylinder Using Seal Kit Supplied By Dewa ·#Testing Of Cylinder In Presence Of Dewa Representative As Per Oem Recommendation Pressure Drop 2 Bar Maximum For 10 Minutes · #Providing Test Certificate With One Year Warranty ·#Delivery Back To Dewa M Within One Week ·#Submit Full Repairing Report To Dewa Representative (Work Completion Report Along With Photos). ·#Warranty For One Year ·#Note: Pressure Chart Required With Completion R Eport Without Pressure Drop. (As Per Standard) C.#Warranty ·#The Warranty Period For The Work Shall Be One Year From The Date Of Co Mpletion Of Work Certified By Dewa. ·#In Case Of Any Damage/Defect Of The Work Carried Out Under This Contract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repair Work And Rectify The Defect Within Short Period. D.#General Terms & Conditions ·#Contractor Shall Have Previous Work Experience For The Same Job ·#Contractor Shall Submit Method Of Statement And Schedule Upon Receipt Of Po. ·#All Rigging And Transporting Equipment Should Be Arranged By The Contractor. These Equipment Shou Ld Be Duly Tested And Certified By The 3Rd Party Inspection Agency And The Certificates Should Be Produced On Demand. Qualified Rigg Er, Mechanics Should Be Provided. ·#The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant A Ccess, Facilities, Complexities, Safety Measures Etc., Before He Submit His Bid. ·#The Contractor Shall Ensure Housekeeping On A Dai Ly Basis And The Contractor Shall Be Responsible For All Waste Material Disposals To Designated Places. ·#All Dewa Safety & Environment Policy, Rules And Regulation Shall Be Followed At Work Site During The Execution Of The Work. The Contractor#S Engineer Should B E Familiar With Safety Regulations While Working In A Hazardous Area. ·#Scaffolding If Required Shall Be Arranged By Dewa. ·#The Wor K Shall Be Executed Under Dewa Supervision And As Per Quality/Schedule Requirement. ·#Contractor#S Supervisor Shall Be Available At Site Throughout The Period Of Work. ·#Dewa Will Arrange Necessary Ptw / Lc / Hwp From Operation, Chemical Lab / Fire Department Clea Rances To Carry Out The Scope Of Work Under This Contract. ·#The Contractor Upon Receiving The Work Permit Shall First Ensure A Safe Working Condition. ·#All The Persons Should Wear All The Required Ppe While At Work. ·#All Material And Tools Brought In Shall Be D Eclared At Power Station Security Gate And The List Of These Items Shall Be Signed By Dewa Security. The Copies Of These Documents S Hall Be Lodged With Dewa Engineer In-Charge On Daily Basis. This Document Will Be The Basis For The Clearance (Gate Pass) To Take Th Em Out On Completion Of The Job. ·#Service Air, Electricity And Water For Work At Dewa Site. It Is The Responsibility Of The Contra Ctor To Have His Own Arrangement In Extending The Electricity And Water Utility To His Places Of Work Including Lighting. E.#Covid -19 Precaution Safety Access To Japs For Contractors, Suppliers, Consultants And Visitors Are Allowed Only If, ·#They Are Vaccinated And Vaccination Records Are Attached Along With Gate Pass Request. ·#All Company Staff Holding Dewa Gd Security Gate Pass Shall Be Checked At Accommodation And Them On Board In Bus/Vehicle Is Free From Cough, Sneezing & High Body Temperature Below 38.1. ·#Contrac Tor Shall Submit Undertaking Letter & Travel Declaration Of All Staff As Per Prescribed Form. 1 Ls Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2412301264
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e71e651f-4711-4ac3-bf55-e086f93d2d3b.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.