New Fire Station Keltern Ot Dietlingen. Timber Construction And Facades: Suspended, Rear-Ventilated Wooden Facade Including Thermal Insulation Wooden Construction Skylight Including Roof Surface And Emergency Sealing All Positions Must Be Calculated Including Delivery, Installation And Assembly. Gross Floor Area (Gfa): 2,401 M2 Gross Volume (Bri): 11,549 M2 Number Of Full Floors: 2 (Plus Training Tower With 3 Floors) Building Reference Heights: Level 0 / Ground Floor Ffb = + 0.00 = 216.50 M Above Sea Level
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.