GTR 70303144

Quotation Are Invited For Parcol Control Valves And Italvalv Isolation Valve Overhauling Works

NCB — National Competitive Bid Closed Asia
Tender Information
GTR Reference
70303144
Tendering Authority
Subscribe to view
Tender No
2332302115
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Parcol Control Valves And Italvalv Isolation Valve Overhauling Works
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
26-09-2023 Closed
Work Detail
Quotation Are Invited For Parcol Control Valves And Italvalv Isolation Valve Overhauling Works Parcol Control Valves And Ita 1032303353Rfx Description Parcol Control Valves And Italvalv Isolation Valve Overhauling Works; K2 Blending Plant 1 Item-00001 Overhauling Of Dn 250 Parcol Butterfly Valve At K Stn Phase 2 Blending Plant. Scope Of Work Under This Pr Is To Overhaul The Valve With Replacement Of Damaged Parts Including Fasteners, Transportation If Any, Material Handling, Blasting And Painting, Assembly Of Valve, Testing And Installation. Complete Works Associated With The Job Is In Contractors Scope. Job Completion Shall Be Only After Successful Testing Of Valve. Dismantling: (1) Removal Of Parcol Actuator Assembly. (2) Removal Of Valve Assembly From System. (3) Dismantling The Complete Valve. (4) Inspection Of Valve Individual Parts After The Removal, Like Disc/ Bush/ Bearing/ Shaft For Butt Erfly/Bearing/Seat Ring (5) Cleaning & Rust Removal Of All Parts After Dismantling. Repair, Reconditioning & Assembly: (1) Replac Ement Of Damaged/Deformed/Corroded Spare Parts. (2) Replacement Of Corroded Studs & Bolts Wherever Necessary. (3) Servicing Of Act Uator Assembly. (4) Assembling Back The Valve. (5) Valve Body Cleaning And Painting. (6) Mounting Of Actuator Assembly. (7) Carr Y Out The Testing Of The Valve # As Per Api 598 (8) Install Valve Back To System With New Gaskets. Warranty - 1 Year Completion T Ime: 8 Days Contractor Scope: All Spares The Contractor Shall Ensure Handling Of Valves Carefully To Avoid Any Damage To The Flang Es Of Valves During Maintenance. Crane, Fork-Lift And Scaffolding If Required, Will Be Arranged By Dewa. Manpower, Consumables, Fast Eners, Gaskets, Tools And Tackles Required For The Job Shall Be Arranged By The Contractor. Safety Of Personnel 1 Ea Working Against This Job Is The Responsibility Of Contractor. They Shall Strictly Adhere With Dewa Safety, Environment And Contract Labour Regulations For More Details And Site Visit, Please Contact: Mr. James Kumar Mobile - 0529126512 Email # [email protected] 2 Item-00002 Overhauling Of Dn400 Italvalv Butterfly Valve At K Stn Phase 2 Blending Plant. Scope Of Work Under This Pr Is To Overhaul The Valve With Replacement Of Damaged Parts Including Fasteners, Transportation If Any, Material Handling, Blasting And Painting, Assembly Of Valve, Testing And Installation. Complete Works Associated With The Job Is In Contractors Scope. Job Completion Shall Be Only Afte R Successful Testing Of Valve. Dismantling: (1) Removal Of Valve Assembly From System. (2) Dismantling The Complete Valve And Gearb Ox. (3) Inspection Of Valve Individual Parts After The Removal, Like Disc/ Bush/ Bearing/ Shaft For Butterfly/Bearing/Seat Ring (4) Cleaning & Rust Removal Of All Parts After Dismantling. Repair, Reconditioning & Assembly: (1) Replacement Of Damaged/ Deformed/ Corroded Spare Parts. (2) Replacement Of Corroded Studs & Bolts Wherever Necessary. (3) Servicing Of Gearbox. (4) Assembling Back The Valve. (5) Valve Body Cleaning And Painting. (6) Mounting Of Gearbox Assembly. (7) Carry Out The Testing Of The Valve # As P Er Api 598 (8) Install Valve Back To System With New Gaskets. Warranty - 1 Year Completion Time: 8 Days Contractor Scope: All Sp Ares The Contractor Shall Ensure Handling Of Valves Carefully To Avoid Any Damage To The Flanges Of Valves During Maintenance. Crane, Fork-Lift And Scaffolding If Required, Will Be Arranged By Dewa. Manpower, Consumables, Fasteners, Gaskets, Tools And Tackles Req Uired For The Job Shall Be Arranged By The Contractor. Safety Of Personnel Working Against This Job Is The Responsibility Of Contrac Tor. They Shall Strictly Adhere With Dewa Safety, Environment And Contract Labour Regulations For More Details And Site Visit, Plea Se Contact: Mr. James Kumar Mobile - 0529126512 Email # [email protected] 3 Item-00003 Overhauling Of Dn 50 Parcol Control Valve At K Stn Phase 2 Blending Plant. Scope Of Work Under This Pr Is To Overhaul The Valve Wit H Replacement Of Damaged Parts Including Fasteners, Transportation If Any, Material Handling, Blasting And Painting, Assembly Of Val Ve, Testing And Installation. Complete 1 Ea 1 Ea Works Associated With The Job Is In Contractors Scope. Job Completion Shall Be Only After Su Ccessful Testing Of Valve. Dismantling: (1) Removal Of Parcol Actuator Assembly. (2) Removal Of Valve Assembly From System. (3) Dis Mantling The Complete Valve. (4) Inspection Of Valve Individual Parts After The Removal, Like Seat/Plug/Stem. (5) Cleaning & Rust Re Moval Of All Parts After Dismantling. Repair, Reconditioning & Assembly: (1) Replacement Of Damaged/Deformed/Corroded Spare Parts . (2) Replacement Of Corroded Studs & Bolts Wherever Necessary. (3) Servicing Of Actuator Assembly. (4) Assembling Back The Valve . (5) Valve And Actuator Cleaning And Painting. (6) Mounting Of Actuator Assembly. (7) Carry Out The Testing Of The Valve # As Per Api 598 (8) Install Valve Back To System With New Gaskets. Warranty - 1 Year Completion Time: 8 Days Contractor Scope: All Spa Res The Contractor Shall Ensure Handling Of Valves Carefully To Avoid Any Damage To The Flanges Of Valves During Maintenance. Crane , Fork-Lift And Scaffolding If Required, Will Be Arranged By Dewa. Manpower, Consumables, Fasteners, Gaskets, Tools And Tackles Requ Ired For The Job Shall Be Arranged By The Contractor. Safety Of Personnel Working Against This Job Is The Responsibility Of Contract Or. They Shall Strictly Adhere With Dewa Safety, Environment And Contract Labour Regulations For More Details And Site Visit, Pleas E Contact: Mr. James Kumar Mobile - 0529126512 Email # [email protected] Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332302115
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6a2aabff-e274-4008-aac3-99d68a49a103.pdf
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders