The Subject Of The Order Is The Execution Of Tasks In The Design And Build System Called Construction Of The Cycling Tourism Center, Including Design Work And Construction Works Consisting In The Construction/Assembly/Creation Of: - A Bicycle Center Building (Housing Bicycle Equipment Rentals, A Shop And Sanitary Facilities) Along With With Partial Rental Equipment, Including The Purchase Of 20 Mtb Bicycles, 30 Electric Mtb Bicycles, - Asphalt Peripheral Path With A Length Of 291 M; The Path Is Intended For Children And Beginner Cyclists And Disabled People (Strollers, Rickshaws, Etc.) - A Pedestrian Path With A Wooden Surface, 83 M Long, - Accompanying Squares With A Mineral Surface With A Total Area Of 899 M2, - An Educational Playground For Children And Teenagers With An Area Of 1,719 M2 - Parking Lot For 30 Passenger Cars With Min. Two Stations For Charging Electric Cars, Reconstruction And Construction Of A Fragment Of A Public Road And Purchase Of Vehicles: O A 30/32-Seat Combustion Cyclobus With A Trailer For Approx. 30 Bicycles - 1 Pc. O A Quad Bike With A Rescue Trailer - 2 Pcs - Necessary Networks, Connections And Installations, Taking Into Account At Least Energy-Saving Technology, - And A Visual Identification Design. The Aim Of The Investment Is To Create A Recreational And Tourist Space By Implementing A Peripheral Path Adapted To Traffic Using Equipment (Bicycles, Roller Skates, Rickshaws, Etc.) Along With Attractions: An Entrance Building Housing A Bicycle Center With Equipment Rental, A Shop And Sanitary Facilities, As Well As Land Development In The Form Of An Adventure Park And A Historic Cherry Orchard. This Study Contains Guidelines For Contractors For The Proper Execution Of The Design And Implementation Of Construction Works. The Contractors Offer Should Include All Construction Works, Supplies And Services Needed To Carry Out The Project Until The Entire Project Is Handed Over To The Ordering Party. The Offer Should Be Consistent With This Program And The Terms Of Reference. The Contractors Scope Should Also Include Works And Elements Of The Development Concept That Have Not Been Specified, But Are Important Or Necessary For The Proper Functioning Of The Area, As Well As For Obtaining A Guarantee. The Contractor Bears Full Responsibility For Achieving The Assumed Objectives Of The Project.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.