1) The Subject Of The Order Is The Adaptation Of The Premises Of The Boiler Room Of The Pedagogical Provincial Library In Krakow For Storage Purposes, Including: A) Freight Crane - General Construction Works, Construction Works Related To The Construction Of An Elevator Core For The Installation Of A Small Three-Station Goods Lift (Puncture In The Ceilings Above The Basement And First Floor, Construction Of A Shaft , Fire And Acoustic Insulation, Elevator Installation, Finishing Works; Supplying Electricity To Run The Lift). Construction Of A New Structural Core Of The Freight Elevator, Elevator Walls Made Of 19 Cm Wide Grouting Blocks With Horizontal Reinforcement; Construction Of A 25 Cm Thick Pit Slab After Chipping Away The Existing Floor Finishing Layers; Construction Of A 20 Cm Thick Head Slab With Elevator Hooks Arranged According To The Elevator Operating Instructions; Stamping The Ceiling Above The Basement - Steel Beams After Removing The Casing And Stamping The Monolithic Ceiling Within 1 M Beyond The Outline Of The Planned Elevator; - Making A Pit Slab And Masonry Walls From Poured Blocks Approx. 20-25 Cm Under The Ceiling Above The Basement; - Making Technological Drillings In The Ceiling And Making Wreaths Reinforced Concrete Under The Slab With Protrusions From #16Mm Rods To The Walls Above; Repeating The Diagram For The Ceiling Above; Construction Of The Walls Of The First Floor And The Slab Above The Shaft; Execution Of Thermal And Anti-Sound Insulation Using 10 Cm Thick Polystyrene Boards; Execution Of Internal Plasters; Execution Of The Floor - Additions; Painting Works Delivery Of An Electric Goods Crane 400V 50Hz, Lifting Capacity 100Kg, Lifting Height 10M, 3 Stops Along With Udt Acceptance (Manufacturers Warranty Of 24 Months For The Device - Goods Crane).B) External Works - External Stairs And Wall Insulation Construction Of A Full Fence With A Height Of 1.8 M, For The Duration Of Works On Wall Insulation, From The Boundary Of The Building Wall 2.5 M To The Boundary Of The Library Area 2.5 M (Neighbors Area); - Disassembly And Reassembly Of The Existing Roof Over The Stairs; - Demolition Works - Dismantling Balustrades, Cutting Off Concrete, Paving Tiles And Concrete Cubes; Insulation; Construction Of A Reinforced Concrete Slab And Stairs; Lining Of The Stairs With Terrazzo 13.21 M2; Hydrophobization Of The Area. Concrete; - Execution And Installation Of A Balustrade With A Powder-Coated Steel Handrail; - Execution Of Linear Excavations With Vertical Walls, Earthworks, Formwork Of The Trenches; - Removal Of External Plasters From The Wall, Fungicide Removal, Grouting, Preparation Of The Substrate For Plasters, Execution Of 1 Cm Thick Plasters, Execution Of Coves Sealing At The Junction Of The Foundation And The Wall; - Highly Flexible Insulation Of Vertical Walls; - Insulation Of Vertical Foundation Walls Made Of 15 Cm Thick Xps Polystyrene Boards Fastened With Glue; - Installation Of Dimpled Foil With A Fastening List; - Backfilling Of Excavations, Construction Of Foundations, Laying The Surface With Paving Stones And Slabs (Recycled Material); - Recultivation Of Green Areas, Construction Of A Lawn, Restoration Of The Area To Its Original Condition. - Work On The Facade Near The Stairs: Reflecting Zen Plasters, Pointing Of Walls, - Preparing The Ground For Plasters, Making Plasters, Removing Efflorescence, - Dirt, Painting Plasters. - Removal Of Rubble, Storage In Containers. C) Reading Room - Disassembly Of Equipment For The Duration Of Renovation; - Packing The Book Collection Into Hard Boxes And Taking Out The Book Collection Of Approximately 3,000 Volumes From The Reading Room - To The Warehouse And After The Renovation, Unpacking, Maintaining The Previous Order Of Arrangement Of The Book Collection ; Replacement Of Ceiling Lighting - Fixtures Made By The Investor. Renovation Of Evacuation Lighting, Measurement Of Electrical Installations, Modification Of Electrical Installations To Meet New Requirements, Renovation Of Parquet Floors, Painting Of Walls And Ceiling, Installation Of Equipment After Renovation, Removal Of Debris, Etc.2) Additional Information: A) Building At Al. Marsza ka F. Focha 39 In Krakow Is Listed In The Municipal Register Of Monuments And Is Subject To Conservation Protection. The Contractor, In Accordance With The Provisions In The Decision Of The Municipal Conservator Of Monuments, Will Carry Out Works Under The Supervision Of An Authorized Conservator Of Works Of Art And, If Necessary, Organize Conservation Commissions. B) The Ordering Party Has Carried Out Works In The Rooms From -1.0 To -1.4.