The Subject Of The Order Are Construction Works Consisting In The Construction Of The So-Called Green Class And Development Of The Area Around Primary School No. 10 In Jelenia G ra, Including The Delivery And Installation Of Equipment. The Order Is Carried Out As Part Of The Jelenia G ra Citizens Budget For 2023 As A Task Called: Sports Ten. Construction Works Should Be Carried Out In Accordance With The Design Documentation Developed By Pro Plants Studio Projektowe Ewelina Fuszara Based In Gdynia In June 2023. The Scope Of The Order Includes, Among Others: 1) Construction Of A 6X9 M Gazebo With Tables, Benches And A Chalk Board, 2) Installation Of Anti-Burglary Blinds In The Gazebo, 3) Construction Of An Electrical Connection To The Gazebo, 4) Delivery And Installation Of An Outdoor Cinema - Roll-Up Ceiling Screen In The Gazebo, 5) Construction Of A Gaming Zone - Concrete Tables For Playing Chess/Checkers - 4 Pieces, 6) Construction Of Backyard Floor Games On A Paved Surface Such As: Hopscotch, Twister, Dart, Imitate Me, Hopla Dance, Boss,7) Construction Of A Place For Drawing With Chalk On A Hardened Surface,8) Construction Of A Place For Drawing With Chalk On Boards,9) Construction Of Pedestrian Communication Routes,10) Construction Planting Trees And Shrubs,11) Installation Of Small Architecture Such As: Waste Bins 3 Pcs., Semi-Circular Bench (Inside) - 2 Pcs., Semi-Circular Bench (Outside) - 2 Pcs., Table With Benches - 4 Pcs., Table With Chair - 1 Pc., Pot For Plantings - 5 Pcs., Pergola - 1 Pc., Shade Sail - 2 Pcs.12) Implementation Of External Monitoring In The Form Of A Fixed Camera On A Lighting Pole, Which Will Be Included In The Citys Radio Monitoring. Note :Due To The Fact That The Scope Of The Commissioned Works Is Smaller Than That Included In The Design Documentation, The Attached Documentation Is Binding To The Extent Resulting From Volume Iii Of The Swz Description Of The Subject Of The Order. The Design Documentation Excludes The Scope Regarding: - Reconstruction Of The School Yard Lighting, - Replacement Net Catchers At The Existing Pitch. The Description Of The Subject Of The Order Is Included In Volume Iii Of The Specification Of The Terms Of Procurement Together With The Annexes.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.