1. The Subject Of The Contract Are Construction Works Consisting In The Construction Of An Educational Shelter Located At The korz Forestry School In korz, Commune Biskupiec, Plot No. 3176. An Open Shed With A Wooden Structure, On A Hexagonal Plan With One Main Room, An Entrance Part With A Ramp For The Disabled In The Front Part And A Terrace In Its Rear Part. The Shelter Is Equipped With An Electrical And Lightning Protection System. The Shelter Has The Following Parameters: A) Volume: 532.21 M3b) Usable Area: 154.62 M2 Building Area: 166.36 M2 Total Area: 253.10 M2c) Length: 28.17 M Width : 15.60 M Width Of The Front Elevation: 8.02 M Height To The Eaves: 2.44 M Height To The Ridge: 5.82 Md) Number Of Storeys: 1 The Material Scope Of The Contract Includes, Among Others: - Earthworks - Construction Of Foundations - Execution Of The Floor From A Concrete Slab - Execution Of The Floor From A Granite Slab - Execution Of A Floor From A Concrete Terrace Slab - Execution Of The Canopys Load-Bearing Structure (Wooden Skeletal Structure Set On Foundations) - Execution Of External Walls With A Skeletal Structure Covered With Facade Board - Execution Of The Roof Structure - Execution Of The Roof Covering From Roof Panels (Seam Sheet) - Flashing And Guttering - Roofing Over The Terrace And Over The Entrance To The Building - Impregnation Of Wooden Elements - Construction Of A Brick Fireplace - Construction Of A Brick Chimney From Prefabricated Hollow Bricks - Construction Of External Concrete Stairs And A Ramp For The Disabled - Assembly Of Solid Wood Door Joinery - Execution Of A Rock Slate Plinth - Execution Of Steel And Wooden Balustrades - Execution Of Electrical Installation Place Of Implementation: The Investment Is Located On The Premises Of The korz Forest Nursery In The Town Of korz, Commune. Biskupiec, Plot No. 3176, Nowe Miasto District 3. The Detailed Scope Of Works Was Determined On The Basis Of: Design Documentation, Bill Of Quantities, Technical Specification Of Execution And Acceptance Of Works. 4. General Provisions Regarding The Subject Of The Contract: A) The Ordering Party Does Not Envisage Awarding Contracts Referred To In Art. 214 Section 1 Point 7 Of The Act On Public Procurement, B) The Ordering Party Does Not Allow Settlements In Foreign Currencies. C) The Ordering Party Does Not Provide For The Requirements Referred To In Art. 96 Sec. 2 Points 2 Of The Public Procurement Law. D) The Ordering Party Does Not Reserve The Possibility Of Applying For The Award Of The Contract Only By The Contractors Referred To In Art. 94 Of The Public Procurement Law.E) The Ordering Party Does Not Provide For Reimbursement Of The Costs Of Participation In The Proceedings, Except For The Situation Referred To In Art. 261 Pzp.F) Subcontracting - The Ordering Party Does Not Require The Contractor To Personally Perform Key Tasks Referred To In Art. 60 And Art. 121 Of The Public Procurement Law - The Contractor May Entrust The Execution Of Part Of The Order To A Subcontractor. In This Case, The Contractor Is Obliged To Indicate In His Offer The Part Of The Contract (Scope) Which He Intends To Entrust To Subcontractors, Along With The Names Of These Subcontractors. The Ordering Party Will Submit The Declaration Referred To In Art. 125 Sec. 1 Of The Public Procurement Law Or Subjective Evidence Regarding This Subcontractor. - If The Employer Finds That There Are Grounds For Exclusion With Respect To A Given Subcontractor, The Contractor Is Obliged To Replace This Subcontractor Within The Time Limit Indicated By The Employer, Otherwise This Subcontractor Will Not Be Allowed To Perform Part Of The Order. - If The Change Or Resignation From The Subcontractor Applies To The Entity Whose Resources The Contractor Relied On, In Accordance With The Principles Set Out In Art. 118 Sec. 1 Of The Public Procurement Law, In Order To Demonstrate Compliance With The Conditions For Participation In The Procedure, The Contractor Is Obliged To Demonstrate To The Employer That The Proposed Other Subcontractor Or Contractor Independently Meets Them To A Degree Not Less Than The Subcontractor Whose Resources The Contractor Referred To During The Procurement Procedure. Performance Of Part Of The Order To Subcontractors Does Not Release The Contractor From Responsibility For The Proper Performance Of This Order. - The Rules For Concluding Subcontracts And Direct Payment Of Remuneration To A Subcontractor Or Further Subcontractor Are Described In Detail In Art. 463-465 Of The Public Procurement Law. G) Ordering Party Pursuant To Art. 95 Of The Public Procurement Law, Requires The Contractor Or Subcontractor To Employ, On The Basis Of An Employment Relationship, Persons Performing Activities Related To The Performance Of The Contract, The Performance Of Which Consists In Performing Work In The Manner Specified In Art. 22 1 Of The Act Of June 26, 1974. Labor Code. This Requirement Applies To Persons Who Perform Activities Directly Related To The Performance Of The Order, I.E. Activities Involving Carpentry And Roofing Works. This Requirement Does Not Apply To Persons Supervising Construction Works, Work Managers, Persons Providing Surveying Services Or Material Suppliers. H) The Contractor Or Subcontractor Will Employ The Above-Mentioned Persons For The Period Of Execution Of The Order. In The Event Of Termination Of Employment Before The End Of This Period, He Undertakes To Immediately Hire Another Person To Replace It.I) The Method Of Verifying The Employment Of Persons Referred To In Point G): - Construction Works Will Be Performed By Persons Listed In The List Of Persons Participating In The Execution Of The Order, Which Constitutes Annex No. 7 To The Swz, - The Contractor, Within 5 Days From The Date Of Signing The Contract, Will Be Obliged To Provide The Ordering Party With Documents Confirming The Manner Of Employment Of The Above-Mentioned Persons. Persons (Anonymized Copies Of Employment Contracts), As Well As A Statement That The Above-Mentioned Persons Are Employed Under An Employment Contract Within The Meaning Of The Provisions Of The Act Of June 26, 1974. Labor Code, Taking Into Account The Minimum Wage Determined Pursuant To Art. 2 Section 3-5 Of The Act Of October 10, 2002. On The Minimum Remuneration For Work Throughout The Entire Period Of Implementation Of The Subject Of The Order, The Number Of People Employed, The Type Of Employment Contract And The Working Hours; - At Each Written Request Of The Ordering Party, The Contractor Will Submit To The Ordering Party A Report On The Status And Method Of Employment Of The Above-Mentioned Persons. Persons, Declarations Of The Employed Persons On Receipt Of Salaries, Proof Of Payment Of Zus Contributions, Throughout The Entire Order Execution Period.J) Sanctions For Failure To Meet The Requirements Regarding The Employment Of Persons Referred To In Point G): - In The Event Of Failure To Submit The Information Referred To In Point. I), The Contractor Will Each Time Pay The Ordering Party A Penalty In The Amount Of Pln 3,000.00 - In The Event Of Failure By The Contractor To Employ Persons Performing The Activities Described In The Bill Of Quantities Under An Employment Contract, The Contractor Will Be Obliged To Pay A Contractual Penalty To The Ordering Party In The Amount Of Pln 5,000. Pln .00 - In Justified Cases, Not For Reasons Attributable To The Contractor, It Is Possible To Replace The Above-Mentioned Person Or Persons Another Person Or Persons, Provided That All The Above Requirements Regarding The Method Of Employment For The Period Of The Order Specified By The Contractor In The Offer Are Met. K) On-Site Visit - The Ordering Party Does Not Provide For The Possibility For The Contractor To Inspect The Area Covered By Construction Works; - The Ordering Party Does Not Provide For The Possibility For The Contractor To Check The Documents Necessary For The Execution Of The Order; - Carrying Out An On-Site Visit Is Not Obligatory. L) Provided In The Documentation Referred To In Point 3.3. Swz Proper Names Are Not Intended To Violate Art. 16 And 99 Of The Public Procurement Law, And Are Only Intended To Specify The Quality And Technological Expectations Of The Ordering Party. The Ordering Party Allows Equivalent Solutions Provided That They Meet At Least The Same Technological And Performance Level. M) In Addition To The Scope Of Works Listed In The Design Documentation, The Following Should Also Be Provided For: Construction Management, Control And Measurement Works In Accordance With Applicable Standards, Securing The Construction Site With Water And Electricity, Supplying The Ordering Party With Required Protocols, Instructions, Certificates, Warranty Cards And Post-Construction Geodetic Inventory.N) The Choice Of The Place Of Possible Disposal Of Rubble And Other Waste And Their Disposal Is The Contractors Responsibility And Constitutes Its Cost, Regardless Of The Distance Of Such Disposal Suggested In The Bill Of Quantities.O) The Offer Must Cover The Entire Scope Of Work Provided For In The Swz And Annexes To The Swz.P) The Ordering Party Requires That The Payment Deadline Is Not Shorter Than 14 Days From The Date Of Receipt Of The Vat Invoice By The Ordering Party.Q) The Ordering Party Does Not Provide For The Possibility Of Exercising The Option Right.