Tenders Are Invited For Modernization Of The Village Hall In Lipowiec Kościelny.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
69831265
Tendering Authority
Subscribe to view
Tender No
BGP.271.1.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Village Hall In Lipowiec Kościelny.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
25-09-2023
Closed
Work Detail
1. The Scope Of The Order Includes: 1.1. Wind Catcher.1.1.1. Construction Works. - Carving Out Door Frames From The Wall, - Dismantling The Floor Made Of Ceramic Tiles, - Removal And Disposal Of Demolition Materials, - Priming The Subfloor For The Floors With Primers, - Making A Floor Of Ceramic Tiles With A Plinth 10 Cm High (Frost-Resistant Tiles, Anti-Slip, Colors To Be Agreed With The Investor), - Scraping And Washing The Walls And Ceiling And Removing The Wall Paneling, - Applying Gypsum Plasters On The Walls And Ceiling, - Painting The Walls And Ceiling Twice With Emulsion Paints (Colors To Be Agreed With The Investor), - Varnishing The Walls Water-Based Varnish Up To A Height Of 2.1 M, - Delivery And Assembly Of An Adjustable Door Frame And Door Leaf (Colors To Be Agreed With The Investor; Note: Change Of Door Opening Direction).1.1.2. Electrical Works. - Disassembly Of The Lighting Fixture, - Power Supply For An Additional Lighting Fixture Along With Cutting And Grouting Grooves, - Delivery And Installation Of Lighting Fixtures - Led Panels 30X60 Cm.1.2. Staircase.1.2.1. Construction Works. - Forging A Steel Grate (Attention: The Grate Needs To Be Re-Assembled), - Dismantling The Floor Made Of Ceramic Tiles, - Dismantling Steel Handrails, - Removal And Disposal Of Demolition Materials, - Delivery And Installation Of Acid-Resistant Steel Handrails (New Handrails Replacing The Old Ones Handrails), - Replacement Of Wooden Coverings Of The Walls Near The Stairs (On The Landing And Flight) Along With Varnishing, - Installation And Painting Of The Steel Grate (Grate From Disassembly), - Priming The Surface Under The Floors With Primers, - Covering The Stairs With Ceramic Tiles Along With A Plinth Height 10 Cm (Grooved Anti-Slip Tiles Or With Anti-Slip Strips, Colors To Be Agreed With The Investor), - Scraping And Washing The Walls And Ceiling And Removing The Wall Paneling, - Plastering The Walls And Ceiling, - Painting The Walls And Ceiling Twice With Emulsion Paints (Colors To Be Agreed With The Investor), - Painting Walls With Water-Based Varnish Up To A Height Of 2.1 M, 1.2.2. Electrical Works. - Disassembly Of A Wall Lighting Fixture, - Power Supply To Move The Fixture To The Ceiling, Along With Cutting And Grouting Grooves, - Delivery And Installation Of Lighting Fixtures - Led Panels 60X60 Cm.1.3. Corridor, 1St Floor.1.3.1. Construction Works. - Carving Out Door Frames From The Wall (3 Pieces), - Dismantling The Floor From Ceramic Tiles, - Removal And Disposal Of Demolition Materials, - Priming The Floor Surface With Primers, - Making A Floor From Ceramic Tiles (Anti-Slip Tiles, Colors To Match Arrangements With The Investor), - Making A 10 Cm High Pvc Plinth, - Scraping And Washing The Walls And Ceiling And Removing The Wall Paneling, - Applying Gypsum Plasters On The Walls And Ceiling, - Painting The Walls And Ceiling Twice With Emulsion Paints (Colors To Be Agreed With The Investor). ),- Painting Walls With Water-Based Varnish Up To A Height Of 2.1 M,- Delivery And Installation Of Adjustable Door Frames And Door Leaves (Colors To Be Agreed With The Investor).1.3.2. Electrical Works. - Dismantling Of Lighting Fixtures, - Delivery And Installation Of Lighting Fixtures - Led Panels 60X60 Cm.1.4. Common Room (1St Floor).1.4.1. Construction Works. - Dismantling The Floor Made Of Ceramic Tiles, - Tearing Up The Plastic Floor, - Removal And Disposal Of Demolition Materials, - Priming The Subfloor For The Floors With Primers, - Making A Floor With Ceramic Tiles (Anti-Slip Tiles, Colors To Be Agreed With The Investor), - Making A 10 Cm High Pvc Plinth, - Scraping And Washing The Walls And Ceiling, - Applying Gypsum Plasters On The Walls And Ceiling, - Painting The Walls And Ceiling Twice With Emulsion Paints (Colors To Be Agreed With The Investor), - Varnishing The Walls With Water-Based Varnish Up To A Height Of 2.1 M,1.4.2. Electrical Works. - Dismantling Of Lighting Fixtures, - Delivery And Installation Of Lighting Fixtures - Led Panels 60X60 Cm.1.5. Staff Bathroom And Room Economic.1.5.1. Construction Works. - Dismantling The Floor From Ceramic Tiles, - Dismantling The Tiles On The Walls, - Removal And Disposal Of Demolition Materials, - Priming The Subfloor For The Floors And Tiles With Primers, - Construction Of A Partition Wall From Waterproof Plasterboards On A Metal Grate With Ventilation Grilles Under Ceiling, - Construction Of A Casing For The Sewage Level And A Toilet Frame Made Of Waterproof Plasterboards On A Metal Grate, - Construction Of A Floor With Ceramic Tiles (Anti-Slip Tiles, Colors To Be Agreed With The Investor), - Execution Of Tiles On Walls Up To A Height Of 2.1 M (Colors To Match Arrangements With The Investor), - Scraping And Washing The Walls And Ceiling, - Plastering The Walls And Ceiling, - Painting The Walls And Ceiling Twice With Emulsion Paints (Colors To Be Agreed With The Investor), - Delivery And Installation Of 70 Sliding Doors. 1.5. 2. Sanitary Works. - Disassembly Of Sanitary Equipment (Washbasin, Toilet) Along With Approaches, - Dismantling Of The Water And Sewage Connection To The Washing Machine, - Dismantling Of The Water Pipeline, - Dismantling Of The Panel Radiator And Parts Of The Central Heating Installation Risers, - Construction Of Water And Sewage Installation For Sanitary Facilities ( Washbasin, Toilet) And Washing Machines, - Delivery And Installation Of A Washbasin With A Standing Tap And A Hanging Toilet, - Supplementation Of The Central Heating Installation Risers. Including Vent Valves, - Delivery And Installation Of A Ladder Radiator, Max. Width 50 Cm And Height 80 Cm, Along With A Thermostatic And Return Valve.1.5.3. Electrical Works. - Disassembly Of Lighting Fixtures, - Disassembly Of Flush-Mounted Sockets And A Switch, - Construction Of A Ydyp 3X2.5 Mm2 Power Line, - Delivery And Installation Of Hermetic Flush-Mounted Sockets For The Washing Machine And At The Washbasin, Including Connection, - Delivery And Installation Of Switches, Together With Connection, - Delivery And Installation Of Lighting Fixtures - Led Panels 30X60 Cm. - Testing And Measurements Of The Electrical Installation.1.6. Stretch Ceiling.1.6.1. Large Room - Ground Floor. - Dismantling The Suspended Ceiling, - Dismantling The Lighting Installation (Luminaires, Switches), - Removal And Disposal Of Demolition Materials, - Scraping And Washing The Walls (Above The Wainscoting), - Preparing The Walls For Painting With Undercoating, - Painting The Walls Twice Emulsion Paints (Colors To Be Agreed With The Investor), - Delivery And Installation Of A Stretch Ceiling With A Complete Lighting Installation In Accordance With The Attached Sketch And List, Including: • Profile Perimeter - 48 M; • Cover – 48 M;• Aluminum Profile Led Line – 160 M; • Diffuser – 160 M;• Pipe Installation + Revisions;• Junctions - 14 Pcs.;• Z Profile;• Foil With Cutout I – 137 M;• Foil Covering The Pipe Installation + Structural Elements;• Structure Reinforcement Elements;• Tape Cold White Led – 244 Mb;• Rgb Led Strip (Colors) – 72 Mb;• Power Supplies – 16 Pcs;• Mono Controllers – 10 Pcs;• Rgb Controllers – 4 Pcs;• Control Panel – 2 Pcs; • Box + Key;• Box For Power Supplies;• Cable 3X2.5 - 450 M;• Cable 3X1.5 - 200 M;• Connectors, Angles, Mounting Strips; - Testing And Measurements Of The Electrical Installation.1.7. Central Heating Installation In The Large Hall - Ground Floor. - Dismantling The Floor, Cement Base And A Fragment Of Thermal Insulation In The Places Where The Central Heating Levels Are Placed, - Supplementing The Subfloor Under The Floors And Ceramic Tiles After Installing The Central Heating Levels. (Colors To Be Agreed With The Investor), - Construction Of The Central Heating Riser Casing. Made Of Plasterboards On A Metal Grid Including Painting (Up To The Height Of The Wainscoting - Wainscoting, Above With Emulsion Paints), - Execution Of The Central Heating Installation. In Accordance With The Technical Design. Note. In The First Stage, 4 Radiators Will Be Installed On The Wall With The Main Entrance To The Room.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5b06fda5-2064-4946-9df5-53460aad5df3.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.