1) The Subject Of The Order Is: Reconstruction Of The Monitoring System In The Addiction Treatment Department I.2) Common Procurement Vocabulary: 34971000-4 - Direct Monitoring Devices. 45311000-0 - Works In The Field Of Cabling And Electrical Installations 35125300-2 - Security Cameras 45314000-1 - Installing Telecommunications Equipment 3) A Detailed Description Of The Subject Of The Order And A Description Of The Ordering Partys Requirements Regarding Implementation And Acceptance Are Specified In: 1. Reconstruction Of The Monitoring System Includes The Delivery Of System Devices And Their Installation.2. The Scope Of Work Is Annex No. 1 And Annex No. 2, Which Details The Parameters And Required Conditions For Adapting The Rooms. 3. Installation Plan For Internal Cameras On The Ground Floor - Annex No. 3.4. Installation Plan For Internal Cameras In The Basement - Annex No. 4.5. Outdoor Camera Installation Plan – Annex No. 5.6. Photos No. 1,2,3 Constituting Attachment No. 6 Show Existing Rack Cabinets.7. Photos No. 4,5,6,7 Constituting Attachment No. 7 Show The Current Condition Of The It Room.8. The Contractor Regularly Sets The Work Schedule With The Ward Nurse.9. The Contractor Is Obliged To Complete The Order On The Terms And Conditions Described In The Contract Template Constituting Annex No. 13.10. If The Description Of The Subject Of The Order Indicates The Manufacturers Name, Trademark, Patent Or Origin In Relation To Specific Solutions, The Ordering Party Requires That Such A Solution Be Treated As An Example And Allows The Use Of Equivalent Solutions With Parameters Not Worse Than Those Indicated Or Higher In The Execution Of The Order. In This Case, The Contractor Will Have To Demonstrate That The Subject Of The Contract Offered By Him Meets The Requirements Specified By The Ordering Party.11. The Work Will Be Performed On The Premises Of The Active Greater Poland Neuropsychiatric Center. Due To The Above, Any Interruptions In The Supply Of Utilities Must Be Consulted In Advance With The Ordering Party. These Should Be Kept To A Minimum By Ensuring Supplies From Other Alternative Sources At The Contractors Expense.12. After Completing The Work On A Given Day, The Contractor Is Obliged To Clean The Rooms Where The Work Took Place.13. The Work Area Must Be Properly Secured Against Unauthorized Persons.14. The Minimum Warranty Period Required By The Ordering Party For The Completion Of The Task Is 36 Months. 15. The Maximum Time Required By The Ordering Party To Remove Defects Is 48 Hours.16. The Ordering Party Does Not Allow The Submission Of Partial Offers. 17. The Ordering Party Does Not Allow The Possibility Of Submitting Variant Offers.18. The Employer Does Not Require The Contractor Or Subcontractor To Employ Persons Performing Activities Related To The Performance Of The Contract Under An Employment Contract.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.