GTR 69418131

Notice Of Information (Advance Notice) (Noi) For Sh26 Onetai Stream Bridge Replacement

NCB — National Competitive Bid Closed Australia and New Zealand
Tender Information
GTR Reference
69418131
Tendering Authority
Subscribe to view
Tender No
8646
Financer Name
Self-Funded
Work Title
Notice Of Information (Advance Notice) (Noi) For Sh26 Onetai Stream Bridge Replacement
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Australia and New Zealand
Political Region
Asia Pacific Economic Cooperation APEC,APAC Asia Pacific
Last Date of Bid Submission
20-09-2023 Closed
Work Detail
Notice Of Information (Advance Notice) (Noi) For Sh26 Onetai Stream Bridge Replacement - Noi. Open Date: Thursday, 31 August 2023 1:00 Pm (Pacific/Auckland Utc+12:00) Close Date: Wednesday, 20 September 2023 5:00 Pm (Pacific/Auckland Utc+12:00) Tender Type: Notice Of Information (Advance Notice) (Noi) Tender Coverage: Sole Agency Regions: Waikato Required Pre-Qualifications: None Overview: This Notice Of Information (Noi) Is To Advise That The Request For Tender Which Was Intended To Be Advertised In Late August 2023 Has Been Deferred To Mid-Late September In Order To Comply With Resource Consent Conditions. The Contract Period Is Anticipated To Take 60 Working Days, With The Possession Of Site Date To Be Nominated By The Contractor And A Due Date For Completion By The End Of April 2024. This Noi Is Provided As An Early Indication Only Of The Project Scope And Will Not Form Part Of Any Future Tender Documents Or Contract Documents. Onetai Stream Bridge (Bsn841) Is Located Approximately 14Km North Of Paeroa And Carries Sh26 Over Onetai Stream. The Contract Is For The Replacement Of The Existing 9M Long Bridge Comprising Of A Steel Girder And Nail Laminated Timber Deck. The New Bridge Will Be A Single-Span Timber Superstructure Comprising Glulam Girders And A Plywood Bridge Deck, And Supported On New Precast Concrete Shallow Foundations And Mechanically Stabilised Embankments. New Instream Scour Protection Works Are Required Together With Ancillary Works. The New Timber Superstructure Is Viewed By Waka Kotahi As A Prototype Solution For Sustainable Replacement Of Short-Span Vehicle Bridges. Key Points Are - 1. The Sh26 Onetai Stream Bridge Replacement Is Anticipated To Cost In The Order Of $2,300,000. 2. Contractors Must Be Pre-Qualified To Bridge Construction Level A (3A). 3. Waka Kotahi Have Mandated Timber For The Superstructure. 4. The Works Are Intended To Utilise A Full Bridge Closure. This Is Not The Commencement Of A Tender Process Or A Registration Of Interest To Tender. Tender Link : Https://Www.Gets.Govt.Nz/Nztahno/Externaltenderdetails.Htm?Id=27996048
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
25cec490-505e-490f-8418-7656806df84a.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders