GTR 69223898
Tenders Are Invited For Renovation Of Rooms And Bathrooms In The Dormitory Of The School Complex Of The Maciej Rataj Agricultural Education Center In Mieczysławów
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
69223898
Tendering Authority
Subscribe to view
Tender No
ZP.271.6.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of Rooms And Bathrooms In The Dormitory Of The School Complex Of The Maciej Rataj Agricultural Education Center In Mieczysławów
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-09-2023
Closed
Work Detail
3.1. The Subject Of The Contract Is The Performance Of Construction Works On The Task Entitled: Renovation Of Rooms And Bathrooms In The Dormitory Of The School Complex Of The Agricultural Education Center For Them. Maciej Rataj In Mieczysławów”, Including In Particular:3.1.1. Moving The Internal Door - Forging The Opening, Installing The Door Lintel And Bricking Up The Opening Of The Old Door, 3.1.2. Building New Partition Walls In The Building In Order To Separate The Bathroom From The Room (Adjustment Of The Rooms To A Better Standard),3.1.3. Installation Of New Internal Doors,3.1.4. Execution Of New Plasters And Finishing Coats On New Walls, 3.1.5. Painting Rooms,3.1.6. Installation Of Tiles On The Walls Of The Bathroom, 3.1.7. Laying Terracotta Tiles On The Floor In The Bathrooms And Panels In The Rooms,3.1.8. Installation Of New Internal Window Sills,3.1.9. Assembly (Renovation) Of Water And Sewage Systems. In The Building,3.1.10. Assembly (Renovation) Of The Electrical System In The Building.3.1. The Planned Investment Is Located On Plot No. 258/1 In Mieczysławów 2.3.2. The Works Will Be Carried Out In Particular In Accordance With The Design Documentation For The Task In Question. 3.3. The Scope Of The Tasks Work Is Included In: Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works, Which Are Attached To The Swz. The Shared Bill Of Quantities Is An Auxiliary Material For The Contractors. The Works Should Be Performed, In Particular In Accordance With The Design Documentation And Order Documents.3.4. Additional Information Regarding The Subject Of The Contract:3.4.1. The Works Should Be Carried Out In Accordance With The Building Practice. The Offer Must Include The Costs Related To The Organization Of The Construction Site, Geodetic Services For The Construction Site - If Necessary, Ensuring The Management Of Works Directly In The Industries In Question, Include The Purchase, Delivery And Development Of All Necessary Materials, Performance Of Checks And Tests, Performance Of All Checks And Tests, And Collection Of The Required Document Rights. It Will Be The Responsibility Of The Contractor To Complete The Necessary Documents And Complete All Procedures. 3.4.2. The Offer Should Be Constructed On The Basis Of Materials With Technical Parameters Not Worse Than Those Indicated In The Design. The Bill Of Quantities Is Only Of An Auxiliary Nature. The Outlays Given In It Should Be Verified With The Project. This Obligation Rests With The Contractors. It Is Recommended That The Contractor, Prior To Submitting The Tender, Visit The Site And Thoroughly Familiarize Himself With The Scope Of The Contract. 3.4.3. All Costs Related To The Execution Of This Order Shall Be Borne By The Contractor. 3.5. Designation According To The Common Public Procurement Vocabulary (Cpv): 45111300 - 1 Demolition Works 45214200 - 2 Construction Works In The Field Of Construction Of Buildings Related To Education 45442100 - 8 Painting Works 45453000 - 7 Repair And Renovation Works 45315300 - 1 Power Supply Installations 45330000 - 9 Installation Works Water, Sewage And Sanitary45450000 – 6 Finishing Construction Works, Other5. Order Completion Date, Warranty5.1. The Contractor Is Obliged To Perform The Order Within A Maximum Of 75 Days From The Date Of Signing The Public Procurement Contract. The Contractor May Shorten The Order Completion Time By A Maximum Of 15 Days. Shortening The Deadline For The Performance Of The Contract Is One Of The Criteria For Evaluating The Offer. The Shortening Of The Order Completion Date Is Specified By The Contractor In Days - In The Tender Form - Appendix 1 To The Swz, By Entering How Many Days The Order Completion Date Is Shortened In Relation To The Maximum Deadline. 5.2. The Contracting Authority Requires A Minimum 24-Month Warranty Period For The Subject Of The Contract. The Warranty Period Is One Of The Tender Evaluation Criteria. 5.3. The Contracting Authority Requires A Minimum 24-Month Warranty Period For The Subject Of The Contract.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a5e5ea37-2b23-4c67-93cb-93fba52b8d9f.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.