The Subject Of The Contract Is The Performance Of Construction Works On The Task Entitled Reconstruction Of A Sports Field In Trzcianna. A Pitch With A Natural Grass Surface, Dimensions After Expansion: Playing Field: 55 M X 100 M, Playing Field With Side Runs And Behind Goals 61 M X 110 M. Behind The Goals (Moved To A New Location) Ball-Catches Will Be Installed (To Be Moved To A New Location). On The West Side Of The Pitch, There Are Stands With 150 Seats - To Change The Location. In Addition To The Existing (Relocated) Stands, Additional Stands With 50 Seats Are Designed. The Designed Fence Separating The Stands From The Pitch With A Height Of At Least 1.20 M With Evacuation Gates With A Minimum Width Of 1.20 M Opened Towards The Playing Field. Two Roofed Shelters For Reserve Players, Each With At Least 10 Seats. The Implementation Of The Task Is Divided Into 2 Stages. Scope Of Work For Stage I: 1. Preparatory Works;2. Earthworks - A New Playing Field;3. Relocation Of The Existing Ditch;4. Measuring Works For Linear Earthworks - Drainage Route With A Collection Pipe In A Flat Area;5. Earthworks Performed With Backhoe Excavators With Transport Of Excavated Material;6. Substrates For Channels And Objects Made Of Loose Materials - Ballast;7. Laying Geotextile;8. Drainage - Filter Bed Made Of Gravel Or Sand;9. Bases For Channels And Objects Made Of Loose Materials - Backfill. Scope Of Works For Stage Ii: 1. Purchase And Delivery Of Sand For Full Soil Replacement;2. Backfilling Of Longitudinal Foundation Excavations, Point Excavations, Ditches, Object Excavations With Bulldozers With Mechanical Compaction;3. Drainage Of Pipes With A Profiled Wall With A Diameter Of Nominal 100/110 Mm In Straight Sections Connected With Sockets On The Ballast Made; 4. Installation Of Fittings For Drainage Pipes With A Profiled Wall In Straight Sections Connected With Sockets - Plug Of The Drainage System; 5. Installation Of Fittings To The Pipeline With A Pvc-U Profiled Wall, Socket-Connected; 6. Control Drainage Well;7. Push-Fit Pvc Pipe Ducts;8. Collector Outlet;9. Water Tightness Test Of Pipe Channels;10. As-Built Geodetic Inventory. The Contractor Is Also Obliged To: 1. Prepare An As-Built Geodetic Survey Of The Works Performed;2. Provide A Construction Manager With Unlimited Authorization To Manage Construction Works In The Construction And Building Specialty;3. Organize Construction Site Facilities And A Place For Storing Materials/Waste On Their Own; 4. In The Event Of Any Failure Of Damage Caused In The Area Of The Works, To Remove Them Immediately In A Targeted And Effective Manner;5. Protection Against Damage Or Destruction Of Public And Private Property - If, Due To Negligence, Improper Conduct Of Works Or Lack Of Necessary Actions On The Part Of The Contractor, Damage Or Destruction Of Public Or Private Property Occurs, The Contractor Shall, At Its Own Expense, In A Targeted And Effective Manner, Immediately, Repair Or Restore Damaged Property; 6. Conducting Proper Management Of Waste Generated As A Result Of The Implementation Of The Subject Of The Contract And Compliance With The Principles Of Environmental Protection;7. Carrying Out Works In A Manner That Takes Into Account The Protection Of The Soil, Land, Air And The Acoustic Condition Of The Environment And In A Manner That Protects Against Failures; The Costs Of The Above Tasks Should Be Included In The Offer Price.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.